STACKER
• The stacker is used for preparing the stockpile with the incoming material.
• The machine travels on rails with the material fed to it through the yard conveyor between
the rails.
• It is provided with a boom with a belt conveyor which is moved up and down with the help
of wire ropes or hydraulic system.
• The material coming on the yard conveyor is raised by a tripper attached to the stacker and
discharged into the boom conveyor which carries the material up to its end and allows it to
fall to form a stockpile.
• The machine travels continuously to and fro so that the pile is built up layer by layer.
April 29, 2019 103, IEDP - MIT WORLD PEACE UNIVERSITY, Pune. (India) 25
April 29, 2019 MIT WORLD PEACE UNIVERSITY, Pune. (India) 26
CONTAINER HANDLING CRANE
• This crane is similar to a ship unloader.
• Instead of grab bucket, a special grab is suspended from the crane trolley to handle the
standard containers.