1. Background
2. Target / Expected Results
3. Problems or Barrier
4. Counter Measurements
5. Action Plan, Time Schedule, and Investment
Analysis
6. Conclusion
1. Background
a. Operational Cost can not compete with China Product.
b. High Consumption Electrical in the process.
c. Increase of energy and labor price.
d. Limitations in investment intruments measurement
e. Tecnology in Industries are already absolate and inefficient in energy
used.
f. Need to support of Financial Scheme of New Invesment of Equipment.
2. Target / Expected Result
a. To Implement of EnMS ISO 50001.
b. Reduce Operational Cost.
c. Reduce for Electrical Consumption and CO2.
d. To Improve the productivity.
e. To Utilize the equipment optimilazation .
f. To get financial Support to Promote Measures for EE and C.
3. Problems / Barrier.
a. Difficult to use Energy Material Balance to analize the energy balance.
a General Requirement
b Management Responsibility
c Energy Policy
d Energy Planning
fChecking
hSertification
Installation of 75KW VSD for fan pump Invesment By PT. Pura Barutama
Installation of 250KW VSD for hydra pulper SM12 Invesment By PT. Pura Barutama
6 PT Pura Nusapersada
Invesment By PT. Pura
Modification chain grade to FBC Boiler (Hamada)
Nusapersada
Invesment By PT. Pura
Installation of 315KW VSD for fan pump
Nusapersada
Invesment By PT. Pura
Installation KWH Meter (measurement unit) to SDP
Nusapersada
7 PT. Nissin Biscuit Indonesia