HAKONE

Group Discussion – Workshop 11 November 2015


Establishment of Showcase EnMS for Sustainable EC
Promotion in Energy Intensive Industry in Indonesia

1) Establishment and Dissemination of


showcase EnMS in Industry based on ISO
50001
2) Development of Pilot Project ( S ) Possible
by ESCO Scheme.
3) Requirement for Goverment Support.
Members List

Leader :Agus Barliandi PT. Ispat Indo


Presenter :Sunaryo PT. Sinar Pantja Djaja
Scripter I :Arie Hartono PT. Pura Barutama
Scripter II :Ferry Kurnia K PT. Nissin Biscuit Indonesia
Member *Trias Tri Widodo PT. Sri Rejeki Isman. tbk
*Sutarno PT. Pura Nusapersada
*Noer Cholis PT. Apac Inti Corpora


Contents List
1. Background
2. Target / Expected Results
3. Problems or Barrier
4. Counter Measurements
5. Action Plan, Time Schedule, and Investment
Analysis
6. Conclusion
1. Background
a. Operational Cost can not compete with China Product.
b. High Consumption Electrical in the process.
c. Increase of energy and labor price.
d. Limitations in investment intruments measurement
e. Tecnology in Industries are already absolate and inefficient in energy
used.
f. Need to support of Financial Scheme of New Invesment of Equipment.
2. Target / Expected Result
a. To Implement of EnMS ISO 50001.
b. Reduce Operational Cost.
c. Reduce for Electrical Consumption and CO2.
d. To Improve the productivity.
e. To Utilize the equipment optimilazation .
f. To get financial Support to Promote Measures for EE and C.
3. Problems / Barrier.
a. Difficult to use Energy Material Balance to analize the energy balance.

b. Due to high interest rate difficult to invest high technology

c. Lack of knowledge/ experience to newest efficient technology

d. Not available financial support to Promote Measures for EE and C in


Indonesia.
4. Counter Measurement.
a. To implement Energy – Material Balance and cost management Data
Base.
b. To use SEU affecting factor
c. To Sustain EC Promotion Standart and guideline.
d. Requirement of cooperation assistancy from Japan excellent ESCO/JCM
through ECCJ / METI programs
e. Replacement / modification of the inefficient technology using an
approriate mechanism of financing
5. Action Plan, Time Schedule and Analysis
Target 2016
No Schedule Activities Remark
1 2 3 4 5 6 7 8 9 10 11 12
1 Set Up Energy Management System ISO 50001 at all Industry Indonesia PT. Sritek Group to prepare EnMS

a General Requirement

b Management Responsibility

c Energy Policy

d Energy Planning

e Implementing and Operation

fChecking

gManagement Review Continuation of PDCA Cycle

hSertification

2 Countinual Improvment after getting Sertification ISO 50001 all industry

3 MFCA and SEU implementation

4 To Make Fisibility Study of SEU to Propose of Financial Shceme

5 Register the Pilot Project to JCM / METI


5. Action Plan, Time Schedule and Analysis
Target 2016
No Schedule Activities Remark
1 2 3 4 5 6 7 8 9 10 11 12

1 PT. Ispat Indo


Final
Project Approval
Feasibility Aplication Need Support by Indonesian
Replacement Screw Compressor With turbo Compressor Implement Investment Decision Preliminary Approval and Construction and Test Operation
Study Submitted Goverment and Japan Goverment
ation Equipment
PO
Final
Project Approval
Feasibility Aplication Need Support by Indonesian
Absorption Chiller Implement Investment Decision Preliminary Approval and Construction and Test Operation
Study Submitted Goverment and Japan Goverment
ation Equipment
PO
AC Drive for Pump House I Invesment By PT. Ispat Indo

2 PT. Sinar Pantja Djaja

Need Support by Indonesian


Instalation of VSD for Fan and Pump (HVAC system)
Goverment and Japan Goverment
Need Support by Indonesian
Replacement Fluorescent Lamp to LED lamp
Goverment and Japan Goverment
Need Support by Indonesian
Instalation of VSD For Ring Frame
Goverment and Japan Goverment

3 PT. Sri Rejeki Isman Tbk

Set up EnMS Based on ISO50001 Sritek Group

Electrical System Optimazation By. Team Mnagement Energy

Steam System Optimazation By. Team Mnagement Energy

Compressor System Optimazation By. Team Mnagement Energy


Head Ventilating and Air Conditioning System
By. Team Mnagement Energy
Optimazation
Optimazation Training Center
5. Action Plan, Time Schedule and Analysis
Target 2016
No Schedule Activities Remark
1 2 3 4 5 6 7 8 9 10 11 12

4 PT. Apac Inti Corpora


Invesment By PT. Apac Inti
Instalation of VSD for Fan at AC Cabin system
Corpora
Invesment By PT. Apac Inti
Replacement Fluorescent Lamp to LED lamp
Corpora
Replacement Screw Compressor With centrifugal Need Support by Indonesian
Compressor Goverment and Japan Goverment
Motor belt replacement on Roving & Ring Frame Need Support by Indonesian
machines Goverment and Japan Goverment

5 PT. Pura Barutama

Installation of 75KW VSD for fan pump Invesment By PT. Pura Barutama

Installation of 250KW VSD for hydra pulper SM12 Invesment By PT. Pura Barutama

6 PT Pura Nusapersada
Invesment By PT. Pura
Modification chain grade to FBC Boiler (Hamada)
Nusapersada
Invesment By PT. Pura
Installation of 315KW VSD for fan pump
Nusapersada
Invesment By PT. Pura
Installation KWH Meter (measurement unit) to SDP
Nusapersada
7 PT. Nissin Biscuit Indonesia

Set up EnMS based on ISO50001


Investment by PT. Nissin Biscuit
Installation of power meter to all SDP
Indonesia
Investment by PT. Nissin Biscuit
Modification Chiller Mac Quay 135TR and 100TR
Indonesia
Investment PT. Nissin Biscuit
Replacment Old Air Conditioner With Air Chiller
Indonesia
6. Conclusion
a. Energy Management System EnMS ISO 50001 can be implemented in
2016.
b. Countinue improvement after getting sertification ISO 50001
c. To propose specific project to get the financial scheme for Indonesian
Goverment or Japan Goverment.
d. We will be ready to propose the Pilot Project in every industry.
e. We will implement the Energy Balance using user friendly MFCA.
ありがとうございました