ESTABLISHMENT OF SHOWCASE ENMS FOR SUSTAINABLE
EC PROMOTION IN ENERGY INTENSIVE INDUSTRY IN
INDONESIA
1) Establishment and Dissemination of showcase
EnMS in Industry based on ISO 50001
2) Development of Pilot Project ( S ) Possible by
ESCO Scheme.
3) Requirement for Goverment Support.

Group Discussion – workshop 11 November 2015


Agus Barliandi ( PT. Ispat Indo )
• as Leader
Sunaryo ( PT Sinar Pantja Djaya )
• as Presenter
Ferry Kurnia K (PT. Nissin Biscuit Indonesia)
as Scripter 1
Member Arie Hartono ( PT. Pura Barutama)
List • as Scripter 2
Sutarno (PT. Pura Nusapersada)
• as member
Noer Cholis (PT. Apac Inti Corpora)
• as Member
Contents List

1. Background
2. Target / Expected Results
3. Problems or Barrier
4. Counter Measurements
5. Action Plan, Time Schedule, and Investment Analysis
6. Conclusion

Group Discussion – workshop 11 November 2015


1. Background

a. Operational Cost can not compete with China


Product.
b. High Consumption Electrical in the process.
c. Increase of energy and labor price.
d. Limitations in investment intruments measurement
e. Tecnology in Industries are already absolate and
inefficient in energy used.
f. Need to support of Financial Scheme of New
Invesment of Equipment.

Group Discussion – workshop 11 November 2015


2. Target / Expected Result

a. To Implement of EnMS ISO 50001.


b. Reduce Operational Cost.
c. Reduce for Electrical Consumption and CO2.
d. To Improve the productivity.
e. To Utilize the equipment optimilazation .
f. To get financial Support to Promote Measures
for EE and C.

Group Discussion – workshop 11 November 2015


3. Problems / Barrier.

a. Difficult to use Energy Material Balance to


analize the energy balance.
b. Due to high interest rate difficult to invest high
technology
c. Lack of knowledge/ experience to newest
efficient technology
d. Not available financial support to Promote
Measures for EE and C in Indonesia.

Group Discussion – workshop 11 November 2015


4. Counter Measurement.

a. To implement Energy – Material Balance and


cost management Data Base.
b. To use SEU affecting factor
c. To Sustain EC Promotion Standart and guideline.
d. Requirement of cooperation assistancy from
Japan excellent ESCO/JCM through ECCJ / METI
programs
e. Replacement / modification of the inefficient
technology using an approriate mechanism of
financing

Group Discussion – workshop 11 November 2015


5. Action Plan, Time Schedule and Analysis
1 2 3 4 5 6 7 8 9 10 11 12
Set Up Energy Management System ISO 50001
1 PT. Sritek Group to prepare EnMS
at all Industry Indonesia
a General Requirement

b Management Responsibility

c Energy Policy

d Energy Planning

e Implementing and Operation

f Checking

g Management Review Continuation of PDCA Cycle

h Sertification
Countinual Improvment after getting
2
Sertification ISO 50001 all industry
Energy Material Balance and SEU
3
implementation
To Make Fisibility Study of SEU to Propose of
4
Financial Shceme
5 Register the Pilot Project to JCM / METI

Group Discussion – workshop 11 November 2015


1 2 3 4 5 6 7 8 9 10 11 12
1 PT. Ispat Indo
MOU betwen Result and
Investment
Indonesia Energy Need Support by Indonesian
Replacement Screw Compressor With turbo Feedback from Periode Install and
Register JCM Goverment with Monitoring Goverment and Japan Goverment
Compressor JCM Comissioning
JApan

MOU betwen
Result and
Indonesia Need Support by Indonesian
Feedback from Investment Install and Energy
Absorption Chiller Register JCM Goverment with Goverment and Japan Goverment
JCM Periode Comissioning Monitoring
JApan

AC Drive for Pump House I Invesment By PT. Ispat Indo

2 PT. Sinar Pantja Djaja

Need Support by Indonesian


Instalation of VSD for Fan and Pump (HVAC system)
Goverment and Japan Goverment
Need Support by Indonesian
Replacement Fluorescent Lamp to LED lamp Goverment and Japan Goverment

Instalation of VSD For Ring Frame

Group Discussion – workshop 11 November 2015


No Schedule Activities Target 2016 Remark

1 2 3 4 5 6 7 8 9 10 11 12
3 PT. Sri Rejeki Isman Tbk

Set up EnMS Based on ISO50001 Sritek Group

Electrical System Optimazation

Steam System Optimazation

Compressor System Optimazation

Head Ventilating and Air Conditioning System


Optimazation

Optimazation Training Center

4 PT. Nissin Biscuit Indonesia

Set up EnMS based on ISO50001


Investment by PT. Nissin Biscuit
Installation of power meter to all SDP Indonesia

Investment by PT. Nissin Biscuit


Modification Chiller Mac Quay 135TR and 100TR
Indonesia
Investment PT. Nissin Biscuit
Replacment Old Air Conditioner With Air Chiller
Indonesia
Group Discussion – workshop 11 November 2015
No Schedule Activities Target 2016 Remark

1 2 3 4 5 6 7 8 9 10 11 12

5 PT. Apac Inti Corpora

Instalation of VSD for Fan at AC Cabin system Invesment By PT. Apac Inti Corpora

Replacement Fluorescent Lamp to LED lamp Invesment By PT. Apac Inti Corpora
Need Support by Indonesian
Replacement Screw Compressor With centrifugal
Goverment and Japan Goverment
Compressor
Motor belt replacement on Roving & Ring Frame Need Support by Indonesian
machines Goverment and Japan Goverment
6 PT. Pura Barutama

Installation of 75KW VSD for fan pump Invesment By PT. Pura Barutama

Installation of 250KW VSD for hydra pulper SM12 Invesment By PT. Pura Barutama

7 PT Pura Nusapersada

Modification chain grade to FBC Boiler (Hamada) Invesment By PT. Pura Nusapersada

Installation of 315KW VSD for fan pump Invesment By PT. Pura Nusapersada

Installation KWH Meter (measurement unit) to SDP Invesment By PT. Pura Nusapersada

Group Discussion – workshop 11 November 2015


6. Conclusion.
a. Energy Management System EnMS ISO 50001
can be implemented in 2016.
b. Countinue improvement after getting
sertification ISO 50001
c. To propose specific project to get the financial
scheme for Indonesian Goverment or Japan
Goverment.
d. We will be ready to propose the Pilot Project in
every industry.
e. We will implement the Energy Balance using
user friendly MFCA.

Group Discussion – workshop 11 November 2015


THANK YOU