Putting it all together: Operations


2

Single Turboexpander Process Train

Low Pressure
Separator

Cold Separator
3

Starting a Turboexpander
4

Process Train Stable on J.T. Valve

X Low Pressure
X X X Separator

X
Blocked In
Cold Separator

To Re-compressor
5

Expander ESDV and all manual


block valves verified closed...

X Low Pressure
X X X Separator

X
Blocked In
Cold Separator

To Re-compressor
6

Confirm Surge Control Valve is


fully open…
7

Use seal gas to


pressurize all housings
and piping out to the
respective block
valves...
8

DO NOT EXCEED A RATE OF


50psi per minute!

Do not exceed
a differential
of 50 psid
across the
machine!
9

This entire loop will be pressurized using


the seal gas inlet flow…
10

Monitor all housings as pressure builds...


11

When system pressure


equals expander
discharge, or
compressor suction
pressure, open those
block valves...
12

Set Seal Gas Regulator


for AUTOMATIC
operation; confirm seal
gas ALARM is cleared.
13

Start the Lube Oil


System...
14

NOTE: Lube oil


pumps will not start
until seal gas ALARM
is cleared!
15

The Lube Oil System...


16

Open pressure regulator by-pass;


17

Place Pump #1 in “Manual”


18

Place Pump #2 in “Auto”


19

Slowly close regulator by-pass; confirm


Low-L.O. Differential Alarm clears
20

Close By-pass..
21

Turn Pump “B” to Off, then back to


“Auto”/”Standby”
22

Drain Housings...
23
Open all manual block valves;
Expander ESDV remains closed...
To Re-compressor

O Low Pressure
XO O Separator

O
Cold Separator
24

In coordination with
Control Room Personnel,
start Turboexpander by
pressing “START”...
Expander inlet ESDV opens; shaft 25

begins to rotate...
To Re-compressor

O Low Pressure
O O O Separator

O
Cold Separator
26

Turboexpander/Compressor
Operation TRIP

Expander Quick Closing Valve

Expander Inlet Guide Vanes

• Split Range with J-T


valve
27

As IGV’s open, J.T. Valve


will close. As control
signals cross - J.T.
Decreasing, IGV’s
increasing - switch IGV
controller to “Automatic”
13,000 RPM 28

Speed increases…
29

Exp. Discharge Temp decreases… -80° F


30
Compressor discharge Pressure
increases…

550 psi
13,000 RPM 31

550 psi

-80° F
Four-to-five hours to stabilize plant
32

Monitor:
1. Seal Gas Pressure Diff.
2. Lube Oil Parameters
3. Vibration Levels
4. Bearing Temperatures
33

Safety, Safety, Safety!