PARK CENTRAL TOWER

PRE - ACTIVITY TRAINING ORIENTATION ON QUALTITY


IN ELECTRICAL WORKS
PROJECT LOCATION
MAKATI AVENUE
PROJECT PERSPECTIVE VIEW
ROUGH ELECTRICAL
WIRING
IN DEVICES
WORKS
WORKS INSTALLATION

TESTING ELECTRICAL
EQUIPMENT LIGHTING
And
INSTALLATION FIXTURE
COMISSIONING
WORK INSTALLATION

4
SLAB

ROUGH – IN - WORKS COLUMN

CONCRETE WALL

5
PRE-ACTIVITY TRAINING ORIENTATION ON QUALITY
PROCEDURE FOR ELECTRICAL WORKS

1. CONDUIT BOXES IN THE SLAB

Start by carrying out the following


procedures, immediately after completing the
formworks.

1.1 Verify approved plans or drawings of the


boxes to be installed in slab.

Figure 1.1
PRE-ACTIVITY TRAINING ORIENTATION ON QUALITY

1.2 Identify the location of boxes for lightings,


convenience outlets and other electrical
systems included in the area based on the
plan.

Figure 1.2
PRE-ACTIVITY TRAINING ORIENTATION ON QUALITY
1.3 Conduct actual measurement per scaled ..
…..drawing for the correct location of the
……boxes.

Figure 1.3

1.4 Have the locations marked by using small


amount of paint.

Figure 1.4
PRE-ACTIVITY TRAINING ORIENTATION ON QUALITY
1.5 Nail the painted junction / square box by
using 3" long common nail.

Figure 1.5
1.6 Ensure that the boxes are properly fixed,
complete with fittings, connector, adapter,
locknut and bushing for EMT or PVC pipes.
Have the head of the nail half-cut for easy
removal after concrete pouring. Fill the box
with used paper or old newspaper to avoid
penetration of concrete inside the box during
concrete pouring.

Figure 1.6
PRE-ACTIVITY TRAINING ORIENTATION ON QUALITY
1.7 Upon completion of rebar, lay-out the
conduit. Fix the conduit EMT or PVC to the boxes
and fittings. Follow lay-outing as indicated in the
plan.

Figure 1.7

1.8 Check conduit bends. Minimize as much as


possible. Ensure the diameters in bends are
not deformed.

Figure 1.8

362.26 Bends — Number in One Run


There shall not be more than the equivalent of four quarter
bends (360 degrees total) between pull points, for example,
conduit bodies and boxes
PRE-ACTIVITY TRAINING ORIENTATION ON QUALITY
PRE-ACTIVITY TRAINING ORIENTATION ON QUALITY
1.9 Avoid running the conduits in the wet areas
like toilets, etc. Fix the conduit in rebar using the
wires.

Figure 1.9

1.10 Ensure that all ends opening of conduits


are properly plugged.

Figure L
PRE-ACTIVITY TRAINING ORIENTATION ON QUALITY

6.2 Conduit and boxes embedded in columns

6.2.1 Before casting a concrete column,


Verify if there are any provision for switches,
convenience outlet, telephone outlet wall
mounted lighting outlet or any other system
included in the plans or drawings.

FIGURE 6.2.1
PRE-ACTIVITY TRAINING ORIENTATION ON QUALITY
6.2.2 If there are any, select the correct type of
boxes for its application and install according
to the mounting heights. Check plumbness and
levelness when installing the box.

Figure 6.2.2
PRE-ACTIVITY TRAINING ORIENTATION ON QUALITY
6.2.3 Ensure that the boxes are fixed in contact
with forms when placed. There must be no
space between the box and the forms.
Otherwise the box becomes too deep. Lay-out
the conduit; ensure it will extend up to the top
of the columns forms. Fix the fittings.

Figure 6.2.3
PRE-ACTIVITY TRAINING ORIENTATION ON QUALITY
6.3 Conduit and Boxes in walls and
partitions.
6.3.1 CHB Walls
When installing box on CHB walls, verify the
mounting heights, distances and the type of box to be
installed. Chip the CHB wall for the correct location of
the box and for lay-outing of the conduit. Check the
boxes plumbness and levelness. Have the proper
coordination for the plastering thickness.

Figure 6.3.1
PRE-ACTIVITY TRAINING ORIENTATION ON QUALITY