Instruments
Principal instrumentation/Control systems.
Methods of interfacing field instruments to main control systems.
In-line instrument requirements.
All instrument numbers.
Control valve sizes and manifolding.
Relief valve type, set pressures & size.
P&ID Initiated Tasks
Piping
Plot plan/piping studies & piperack layout studies.
Vessel nozzle orientations and piping layouts.
3D Plant models.
Vessel instrumentation, platforms and ladders (for vessel purchase).
Valve take offs and MRQ.
Bulk MTO and MRQ.
Long delivery piping and valves (alloy) MRQ and order.
Battery limit schedules - showing all lines crossing the BL.
Control Systems
Enquiry for control valves, relief valves, orifice plates.
Instrument data sheets.
Progress instrument installation schedule and issue.
P&ID Initiated Tasks
Civil
Plant preliminary U/G system
U/G bulk material take off
Piperack study
Electrical
Single line diagrams
Electrical load summary
Area classifications
Mechanical
Vessel drawings
Nozzle sizes and locations
P&ID Initiated Tasks
Operations
Logic Diagrams - Representation of operation for start-up & shutdown
of all units.
Construction & QAQC
Hydrotest Diagrams - Erected piping split into independent isolated
sections for hydrotesting.
Loss Prevention
Cause & Effect, Sequence Flow Diagrams - For plant safety shutdown
systems & F&G (fire and gas) systems.
Hazop Study
Process
Line Designation Table