1. Kiln stop due to EP Stack Emmission High (Stop date 16.06.2012 01:00, Duration 21.0 hrs)
Symptom
- Since 8 June, EP performance of compartment 1 was fluctuated but The PID still
able to take recovery. Abnormal GCT operation recorded twice 5 minutes after feed
on and for 1 hour after kiln feed on, the flow regulator and pump running unsmooth
- At 12 June 13:00 Raw Mill stop due to main drive trouble until 14 June 10:00.
During raw mill long stop, GCT had operated in normal condition.
- At 14 June 14:00 while raw mill running, Comp. 1’s mA drop with unknown reason,
and the emission was over the limit. Then at 15 June 22:00 Comp. 2 and 3 ’s mA
also drop and then at 16.06.2012 01:00 kiln was stopped
Root Cause
- Under investigation (Possibility from abnormal GCT operation cause thermal
expansion and lumpy material at in let EP)
Action
- Check inside EP after cooling process, then found lump
material at Comp. 3 Done
- Check wire gap and collecting plate, the result was no abnormal finding Done
- Doing test run, the result were high voltage at Comp. 1 and Comp 2
current still low 300 mA and 860 mA (normally is higher than 1000mA)
and at Comp 3 was normal: higher than 1000 mA Done 1
6/17/2019/PP
Holcim Indonesia Manufacturing Directorate Report.ppt
Narogong Root Cause Analysis – June 2012
NAR1
Action
- Check rapping system Done
- Check GCT lances Done
2
6/17/2019/PP
Holcim Indonesia Manufacturing Directorate Report.ppt
Narogong Root Cause Analysis – June 2012
NAR1
1. Kiln stop due to EP Stack Emmission High (Stop date 17.06.2012 05:00, Duration 27.67 hrs)
Symptom
- After the first kiln stop at 16 June 22:00 Kiln Feed on, EP performance still not
optimum but the emission still normal
- 16 June 11:59 GCT trouble water flow reduce ,temp out let GCT was high up to 200
oC the PID react to open until 89 %, the water flow still didn’t increase, while the
water supply back to normal the flow of water jump to 60 m3/h, the PID oscillating for
0.5 hours and GCT indicate wet bottom. EP mA drop then start recovery , check PID
parameter was reset to default due to power control failure
- 17 June 02:20 mA drop at all EP compartments, emission is over limit then kiln is
stopped 05.00
Root Cause
- Under investigation (Possibility from abnormal GCT operation cause thermal
expansion and lumpy material at in let EP)
3
6/17/2019/PP
Holcim Indonesia Manufacturing Directorate Report.ppt
Narogong Root Cause Analysis – June 2012
NAR1
Action
- Recheck inside EP the finding are: PIC : Sagi Done
• Isolation support discharge wire comp 1 not fixed, the collecting plate gap in
discharge wire to sort in one side, alignment and repaired all isolation OK
• Cleaning lump material at isolation hanger discharge wire at Comp. 1,2,3 OK
• Check transformer, isolation heater discharge wire and all rapping system OK
• Check and test GCT spray system , Tuning GCT PID and modify start pump
sequence OK
- Test high voltage EP: Comp. 1…..comp 2:…..comp3:…
4
6/17/2019/PP
Holcim Indonesia Manufacturing Directorate Report.ppt
NAR2 Narogong Root Cause Analysis – June 2012
5
6/17/2019/PP
Holcim Indonesia Manufacturing Directorate Report.ppt
NAR2 Narogong Root Cause Analysis – June 2012
Root Cause
- Under investigation (Possibility from abnormal GCT operation cause thermal expansion and
lumpy material at in let EP)
Action
- At 18 June kiln is stopped to did local inspection due to during direct operation
(RM stop) the dust emission is 120 mg/Nm3 with 400 tph Kiln Feed.
- The findings are discharge wires were covered by wet material :
cleaning as much as possible Done
- Big hole Leakage in inlet EP casing lead false air
patching hole Done
- Some Discharge wire miss alignment align discharge wire was Done
- Testing no load and control function of EP high voltage (no result) Done
- Test High voltage during kiln stop still not optimum,
- Tuning EP control parameter PIC: Herry Continue
- Check all EP grounding and repair PIC:Herry On going
- Trial material non AFR (Result : no impact) Done
6
6/17/2019/PP
Holcim Indonesia Manufacturing Directorate Report.ppt
NAR2 Narogong Root Cause Analysis – June 2012
Action
- Re tuning GCT parameter , replace water and air proportional valve, testing
GCT spray Done.
- Service compressor and air dryer (1 control module compressor still waiting
delivery) PIC : Enjang K
- Measurement process : dust load EP: normal, False air normal,
operating temperature range : normal, dust chemical content : normal
Gas Flow to EP normal comparing to the design. Done
- Optimization process : Operating raw mill with low feeding,