NTPC Gadarwara Super Thermal Power Project

Quiz on Safety Rules Hand Book


Electrical and Mechanical
NTPC Gadarwara Super Thermal Power Project

Que:1
Safety Documents (i.e, Limited work certificate, permit to
work, Permit to work (ROMP) and sanction test) shall be
prepared, issued and cancelled by…………….
1. Competent Person
2. Senior Authorized Person
3. Nominated Supervisor
4. Shift Incharge
NTPC Gadarwara Super Thermal Power Project

Que:2
Permit to work, Permit to work (ROMP) and Limited work
certificate shall be received, cleared and transferred only by a
………………..
1. Competent Person
2. Senior Authorized Person
3. Authorized Person
4. Shift Incharge
NTPC Gadarwara Super Thermal Power Project

Que:3
Sanction test shall be received, cleared and transferred only
by ………………..
1. Competent Person
2. Senior Authorized Person
3. Authorized Person
4. Shift Incharge
NTPC Gadarwara Super Thermal Power Project

Que:4
Competent Person is nominated in writing by the ………………..
1. Location General manager
2. Additional General Manager
3. Dy. General Manager
4. Any one from above three
NTPC Gadarwara Super Thermal Power Project

Que:5
When a …………….. Is in force on plant and/or high voltage
apparatus, no other safety documents shall be in force on the
same item of plant and/or high voltage appratus.
1. Sanction for test
2. Permit to work
3. ROMP
4. Limited work certificate
NTPC Gadarwara Super Thermal Power Project

Que:6
If access to the key safe is required for any reasons during the
period of suspension, the permit to work shall be cancelled
first.
1. True
2. False
NTPC Gadarwara Super Thermal Power Project

Que:7
When the work is to be re-started, the senior authorized
person shall conform the safety precautions are still valid.
Then he can re-issue the permit to work and associated items.
1. True
2. False
NTPC Gadarwara Super Thermal Power Project

Que:8
Who will confirm all persons working under the permit to
work have been withdrawn from the plant/high voltage
apparatus and warned not to continue the work.
1. Competent Person
2. Senior Authorized Person
3. Nominated Supervisor
4. Authorized Person
NTPC Gadarwara Super Thermal Power Project

Que:9
Who will confirm all persons working under the Sanction for
test have been withdrawn from the plant/high voltage
apparatus and warned not to continue the testing.
1. Competent Person
2. Senior Authorized Person
3. Nominated Supervisor
4. Authorized Person
NTPC Gadarwara Super Thermal Power Project

Que:10
Isolated plant or high voltage apparatus that is isolated and
earthed issued to nominated competent person is………..
1. PTW with ROMP
2. Permit to work
3. Limited work certificate
4. None of the above
NTPC Gadarwara Super Thermal Power Project

Que:11
Full Form of ROMP
1. Restoration of motion power supply
2. Restoration of motive power supplies
3. Restoration of motive power
4. Restoration of motion power
NTPC Gadarwara Super Thermal Power Project

Que:12
When Sanction for test given…?
1. ID and FD fan balancing
2. Tap changer maintenance on transformer
3. Testing of high voltage apparatus or testing plant.
4. Live line testing on H.V. over head power transmission
line.
NTPC Gadarwara Super Thermal Power Project

Que:13
…………… can be a complicated document because it is
designed to cover a variety of use for work/testing on/near
plant or HV apparatus that is not isolated; or work or testing
of isolated, partially isolated or live medium and low voltage
apparatus.
1. Sanction for test
2. PTW with ROMP
3. Limited work certificate
4. Permit to work
NTPC Gadarwara Super Thermal Power Project

Que:14
Who can carry out the duties for switching, isolation and
earthing to achieve safety from the system and to receive &
clear Sanction for test on apparatus up to 11 KV
1. Competent Person
2. Senior Authorized Person
3. Nominated Supervisor
4. Authorized Person
NTPC Gadarwara Super Thermal Power Project

Que:15
Who can carry out the duties to issue and cancel permits to
work and LWC on plant and Low/Medium Voltage apparatus
and also give sanction for test on all plant and apparatus up
to 400 KV.
1. Competent Person
2. Senior Authorized Person
3. Nominated Supervisor
4. Authorized Person
NTPC Gadarwara Super Thermal Power Project

Que:16
……….shall be nominated in writing specifying the hazards
which they can advise on and for which they can carry out
test and examinations and make recommendations.
1. Competent Person
2. Selected Person
3. Nominated Supervisor
4. Authorized Person
NTPC Gadarwara Super Thermal Power Project

Que:17
In accordance with…………………., these electrical and
mechanical safety rules have been produced to protect
persons when working or testing on NTPC plant and
apparatus .
1. NTPC Safety Rules
2. NTPC policy on health and safety
3. As per Indian Standard
4. As per BOCW act
NTPC Gadarwara Super Thermal Power Project

Que:18
The basic safety rules state the principles to
achieve……………………….
1. Safety from individual
2. Safety from the site
3. Two of the above
4. Safety from the system
NTPC Gadarwara Super Thermal Power Project

Que:19
Safety rules and codes of practice are approved for use in
NTPC by……….
1. HOP
2. RED
3. NTPC Board
4. CMD
NTPC Gadarwara Super Thermal Power Project

Que:20
In addition to their statutory duties, it is the duty of
all……………. Involved with safety rules to make themselves
fully familiar with them, as appropriate to their
responsibilities.
1. HOP
2. RED
3. Person
4. EICs
NTPC Gadarwara Super Thermal Power Project

Que:21
A person with adequate knowledge and experience and
nominated by the location manager or AGG/DGM to set
further Competent persons to work, as necessary under
another competent person’s safety document.
1. Competent Person
2. Selected Person
3. Nominated Supervisor
4. Authorized Person
NTPC Gadarwara Super Thermal Power Project

Que:22
The protection provided for persons working on or testing
plant and apparatus from which danger could occur if the
work/testing wad down with the plant and apparatus in its
normal operating condition is defined as…………...
1. Safety from person
2. Safety from Site
3. Safety from system
4. Safety from apparatus
NTPC Gadarwara Super Thermal Power Project

Que:23
When safety from the system can not be achieved by limiting
the work or the work area and it is necessary to isolate the
plant and /or HV apparatus then the ……………………shall be
issued before work commences.
1. Limited work certificate
2. ROMP
3. Permit to Work
4. Sanction for test
NTPC Gadarwara Super Thermal Power Project

Que:24
A distance of ……….. Shall be maintained from the portion of
the insulators supporting exposed high voltage conductors
which is outside the appropriate safety distance from the
conductor.
1. 300 MM
2. 450 MM
3. 250 MM
4. 400 MM
NTPC Gadarwara Super Thermal Power Project

Que:25
…………….shall ensure all persons responsibilities are specified
in writing and signed and record of authorization, as
appropriate stating the person has adequate knowledge and
experience to carry out his duty.
1. GM O&M
2. GM TS
3. CGM
4. AGM Operation
NTPC Gadarwara Super Thermal Power Project

Que:26
Code of practice for high voltage switching operations does
not deal with switching to the instruction of an authorized
person under a sanction for test.
1. True
2. False
NTPC Gadarwara Super Thermal Power Project

Que:27
All HV switching except for emergency or agreed routine
switching should be carried out to the instruction of the
appropriate……………
1. Competent Person
2. Control Person
3. Nominated Supervisor
4. Authorized Person
NTPC Gadarwara Super Thermal Power Project

Que:28
Before issuing HV switching instructions the control person
should consult with the……….. Of any adjacent system which
may affected by the proposed switching.
1. Competent Person
2. Authorized Person.
3. Control Person
4. Nominated Supervisor
NTPC Gadarwara Super Thermal Power Project

Que:29
When the work testing is to be resumed and the safety
document is to be re-issued after suspension….
1. Checking confirming that the safety precautions stated on
the safety document are still as sated and are adequate.
2. Re-issuing the safety document of the new recipient
ensuring at least the same information is given as was given
to the original recipient
3. Only (1)
4. Both 1 & 2
NTPC Gadarwara Super Thermal Power Project

Que:30
Safety rules establish to protect the persons carrying out work
on the plant and apparatus from……….
1. Hazards
2. Risk
3. Inherent danger/Safe from system
4. All of the above
NTPC Gadarwara Super Thermal Power Project

Que:31
Before returning any HV Switchgear to service which
has been worked on, the Competent Person must
confirm with the …………… for cancelling the safety
document.
1. Competent Person
2. Senior Authorized Person.
3. Authorized Person
4. Nominated Supervisor
NTPC Gadarwara Super Thermal Power Project

Que:32
Portable earthing devices should be examined
…………and the result of such examination recorded
they should also be examined immediately
…………….by the person responsible for the application
of such earth.
1. Quarterly, Before use
2. Quarterly, After use
3. Six monthly, Before use
4. Six monthly, Before use
NTPC Gadarwara Super Thermal Power Project

Que:33
…………..must be applied within the isolated zone.
1. Primary Earth
2. Drain Earth
3. Not required
4. Both 1&2
NTPC Gadarwara Super Thermal Power Project

Que:34
Portable drain Earth must have a cross section of not
less than ………..square copper equivalent.
1. 20 mm
2. 35 mm
3. 40 mm
4. 25 mm
NTPC Gadarwara Super Thermal Power Project

Que:35
When contractors are working in HV enclosure where
drain earths are required these may only be applied or
moved by ………..within the define working area.
1. Contract staff
2. Operator
3. NTPC staff
4. Any one from above
NTPC Gadarwara Super Thermal Power Project

Que:36
Transformers and reactors will require to be earthed
between the windings of all HV points of isolation, but
earthing is not required on the medium voltage and low
voltage sites of transformer.
1. True
2. False
NTPC Gadarwara Super Thermal Power Project

Que:36
A party consisting of a Competent Person in charge
accompanied by one or more Competent Person whose
duty it is to apply and remove portable drain earths on
overhead line conductors.
1. Working Party
2. Earthing party
3. Contractor Party
4. NTPC Staff
NTPC Gadarwara Super Thermal Power Project

Que:38
Where work is to be carried out in the proximity to
Apparatus which may be live, then the limits to the work
area must be clearly defined by a conspicuous &
identifiable boundary mark.
1. True
2. False
3. Not applicable at NTPC
NTPC Gadarwara Super Thermal Power Project

Que:39
Boundary marks and danger notice only be fixed or
moved by an authorized person or by a person under
the personal supervision of………..
of.
1. Competent Person
2. Authorized Person.
3. Control Person
4. Nominated Supervisor
NTPC Gadarwara Super Thermal Power Project

Que:40
Access to compartments containing High Voltage
apparatus must normally be kept locked and keys must
be held in the safe custody of………..
1. Competent Person
2. Control Person
3. Authorized Person
4. Nominated Supervisor
NTPC Gadarwara Super Thermal Power Project

Que:41
Who can have access to a compartment in which the
exposed High Voltage conductor are live:
1. Authorized person
2. Competent person under supervision of authorized
person
3. Senior authorized person
4. Both 1 & 2
NTPC Gadarwara Super Thermal Power Project

Que:42
When work or testing is to be done on high voltage
Apparatus in a compartment all exposed High Voltage
conductors must have been isolated, earthed……………
issued for the work or testing.
1. PTW with ROMP
2. PTW or sanction for test
3. PTW
4. Sanction for test
NTPC Gadarwara Super Thermal Power Project

Que:43
A person trained and authorized in writing to operate a
specific type or type of cranes, vehicles or access
equipment within the specified substation.
1. Nominated person
2. Supervisor
3. Crane operator
4. Stand by man
NTPC Gadarwara Super Thermal Power Project

Que:44
A person selected by Senior authorized person and
provided with written instruction to assist in ensuring the
safe movement of vehicles or mobile equipments within
a define area usage called……….
1. Nominated person
2. Supervisor
3. Crane operator
4. Stand by man
NTPC Gadarwara Super Thermal Power Project

Que:45
In substation only approved Ladders must be used
which are no greater length then is required for the work
involved by permission of….……….
1. Competent Person
2. Control Person
3. Authorized Person
4. Nominated Supervisor
NTPC Gadarwara Super Thermal Power Project

Que:46
In substation the ………………...issuing the safety
document should define on site to an authorized person
the movement and the location of the scaffolding to be
erected.
1. Competent Person
2. Control Person
3. Authorized Person
4. Senior Authorized Person
NTPC Gadarwara Super Thermal Power Project

Que:47
When scaffolding is to be erected or dismantled within
define safe area of work, a senior authorized person
should dependent upon the proximity of exposed live HV
conductor depute
1. Competent Person
2. Authorized Person
3. Both of them
4. Either 1 or 2
NTPC Gadarwara Super Thermal Power Project

Que:48
What will be the safety distance from 400 KV line
1. 6 m
2. 5 m
3. 4 m
4. 3 m
NTPC Gadarwara Super Thermal Power Project

Que:49
When equipment is being moved in close proximity to,
but out side safety distance from exposed live HV
conductor the senior authorized person issuing
the………….
1. Sanction for test
2. PTW with ROMP
3. Limited work certificate
4. Permit to work
NTPC Gadarwara Super Thermal Power Project

Que:50
Before any person employed by contractor is permitted
to operate cranes, vehicles or access equipment in the
NTPC substation,…………….. must ensure that operator
will ensure compliance with this code.
1. Competent Person
2. Location Manager
3. Authorized Person
4. Senior Authorized Person
NTPC Gadarwara Super Thermal Power Project

Que:51
The…………..must ensure that there is no other safety
document in forced for the apparatus on which he is to
issue a sanction for test.
1. Competent Person
2. Senior Authorized Person
3. Authorized Person
4. Location manager
NTPC Gadarwara Super Thermal Power Project

Que:52
A sanction for test, the key safe key where appropriate
such safety keys are necessary to enable the testing to
be done, must be issued to and received by the ………..
1. Competent Person
2. Senior Authorized Person
3. Authorized Person
4. Location manager
NTPC Gadarwara Super Thermal Power Project

Que:53
When a sanction for test is to be cleared, all changes of
the conditions of isolation and earthing with in the test
area by the…………… who cleared it
1. Competent Person
2. Authorized Person
3. Senior Authorized Person
4. Location manager
NTPC Gadarwara Super Thermal Power Project

Que:54
Main danger to personnel from plant and apparatus
containing SF6 gas are-
1. Poisoning by toxic breakdown products which may
be formed within the apparatus
2. Electric shock
3. Burn, Asphyxiation
4. All of the above
NTPC Gadarwara Super Thermal Power Project

Que:55
Sulphur hexa flouride (SF6) gas is stable, non toxic,
colorless, tasteless and odorless and inert-
1. True
2. False
NTPC Gadarwara Super Thermal Power Project

Que:56
When work is to be carried out and SF6 is leaking &
danger could arise, the condition of the atmosphere in
that area must be declared free from danger by a……….
before persons are allowed to enter in affected area.
1. Competent Person
2. Selected Person
3. Senior Authorized Person
4. Location manager
NTPC Gadarwara Super Thermal Power Project

Que:57
Main danger to personnel from static capacitors are:-
1. Electric shock and burn from discharge of electrical
energy retained by the static capacitors after they
have been isolated
2. Contamination by contact with Poly chlorinated bi
phenyl
3. Only 1
4. Both 1 & 2
NTPC Gadarwara Super Thermal Power Project

Que:58
Where work or testing is to be carried out on LV and MV
apparatus which is part of HV apparatus adequate
precautions must be taken in appropriate safety
document issued by a …………
1. Competent Person
2. Selected Person
3. Senior Authorized Person
4. Location manager
NTPC Gadarwara Super Thermal Power Project

Que:59
While work on live apparatus, the work must only be
done by a …………..who has adequate experience and
training for doing such job.
1. Competent Person
2. Selected Person
3. Senior Authorized Person
4. Location manager
NTPC Gadarwara Super Thermal Power Project

Que:60
Major danger when entering and working on Electro
static precipitator are:-
1. Electrocution, asphyxiation
2. Poisoning from toxic gases
3. Burns from contact with pulverized flue gases
4. All of the above
NTPC Gadarwara Super Thermal Power Project

Que:61
For washing the live insulator conductivity of the water
used must not exceed:- (a) 500 micro Siemens/cm at 25
degree on 132 KV, (b) 200 micro Siemens/cm at 25
degree on 220 KV, (c) 400 KV value to be decided & its
conductivity must be checked by a selected person
1. Both a & b correct
2. Only a is correct
3. Only c is correct
4. All a, b, c are correct
NTPC Gadarwara Super Thermal Power Project

Que:62
In ESP keys of the locks which allow entry to the flow,
should be given to the working personnel by the
………….., only after assuring that all the zone in the
flow have been isolated and primary earth applied.
1. Competent Person
2. Authorized Person
3. Senior Authorized Person
4. Location manager
NTPC Gadarwara Super Thermal Power Project

Que:63
In ESP before allowing the work to be done as well as
preparing PTW, a ……………..report should be prepared
if the Senior authorized person consider it necessary.
1. Competent Person
2. Authorized Person
3. Senior Authorized Person
4. Location manager
NTPC Gadarwara Super Thermal Power Project

Que:64
If it is required to operate the rapping gear during the
work then the safety document must be ………..
1. Limited work certificate
2. PTW with ROMP
3. Permit to Work
4. Sanction for test
NTPC Gadarwara Super Thermal Power Project

Que:65
To avoid entombing of persons within confined space at
completion of work, the…………..must ensure that all
persons.
1. Person Incharge
2. Authorized Person
3. Senior Authorized Person
4. Location manager
NTPC Gadarwara Super Thermal Power Project

Que:66
A non return valve is not a shut off valve unless it can be
locked in the closed position.
1. True
2. False
NTPC Gadarwara Super Thermal Power Project

Que:67
The on load repair of leaks may be carried under a
…………….. with the plant operational.
1. Limited work certificate
2. PTW with ROMP
3. Permit to Work
4. Sanction for test
NTPC Gadarwara Super Thermal Power Project

Que:68
The activities may be carried out without issue of safety
document.
1. Chemical cleaning of plant internal
2. Floating of safety valves
3. None of the above
4. Both 1 & 2
NTPC Gadarwara Super Thermal Power Project

Que:69
A PTW must be issued for access for preparatory work
including the fixing of initial temporary lighting and
removal of slag inside boiler.
1. True
2. False
NTPC Gadarwara Super Thermal Power Project

Que:70
The person in-charge of ……………must ensure that no
person are inside the gas pass or dead chamber and
that they are told not to re-enter.
1. Contractor
2. Working party
3. Third party
4. None of the above
NTPC Gadarwara Super Thermal Power Project

Que:71
On completion of job at gas pass except one door all
doors should be closed. The…………. Should personally
checked the closing of the final access point.
Announcement should be made before closing of final
door.
1. Person Incharge
2. Authorized Person
3. Senior Authorized Person
4. Location manager
NTPC Gadarwara Super Thermal Power Project

Que:72
When the mill outlet temperature below …… the mill
may be opened carefully by personnel wearing approved
full cover protective clothing.
1. 60 Degree Celsius
2. 70 Degree Celsius
3. 50 Degree Celsius
4. 40 Degree Celsius
NTPC Gadarwara Super Thermal Power Project

Que:73
Work under open furnace conditions other than routine
operations, should be taken up in accordance
with…………..
1. Location management instruction
2. Precautions given by the manufacturer
3. Under the supervision of senior authorized person
4. All of the above
NTPC Gadarwara Super Thermal Power Project

Que:74
In case of any indication of unstable firing condition
arising during open furnace work, the unit or boiler
operator must inform the ……….. Incharge of the work
as quickly as possible.
1. Person Incharge
2. Authorized Person
3. Competent Person
4. Location manager
NTPC Gadarwara Super Thermal Power Project

Que:75
In case of any indication of unstable firing
condition………. Must ensure that PTW has been
returned and work has been stopped until further
instruction and he will ensure safety of that area.
1. Person Incharge
2. Authorized Person
3. Senior Authorized Person
4. Location manager
NTPC Gadarwara Super Thermal Power Project

Que:76
While working in feeders and chutes, if there is any
indication of fire in the feeder or chute then action will be
taken as per………...
1. DMP
2. Onsite emergency plan
3. Location management instruction
4. On instruction of authorized person
NTPC Gadarwara Super Thermal Power Project

Que:77
During work in bunkers periodic gas samples should be
taken because of the possible release of Carbon
monoxide. The ………………………must specify the
requirement.
1. PTW
2. Limited work certificate
3. PTW with ROMP
4. Sanction for test
NTPC Gadarwara Super Thermal Power Project

Que:78
No person should be allowed to enter chute openings
except under a…………… These opening should be
barricaded to prevent unauthorized entry.
1. PTW
2. Limited work certificate
3. PTW with ROMP
4. Sanction for test
NTPC Gadarwara Super Thermal Power Project

Que:79
Conveyor must not be operated until:
1. All guards are in place
2. All Safety trip features are operative
3. The siren should be given before starting a belt so that the
person working anywhere in the system will be alerted.
4. All of the above
NTPC Gadarwara Super Thermal Power Project

Que:80
The………………incharge of the works should ensure that
danger cannot arise due to release of stored energy by
locking or checking the belt so that it cannot move during
work.
1. Person Incharge
2. Authorized Person
3. Competent Person
4. Location manager
NTPC Gadarwara Super Thermal Power Project

Que:81
While working running on, replacing or aligning belts will
require the ……………….during period the permit to work is in
force.
1. ROMP
2. Sanction for test
3. Limited work certificate
4. LMI
NTPC Gadarwara Super Thermal Power Project

Que:81
While working running on, replacing or aligning belts will
require the ……………….during period the permit to work is in
force.
1. ROMP
2. Sanction for test
3. Limited work certificate
4. LMI
NTPC Gadarwara Super Thermal Power Project

Que:83
As per factories act 1948 no young person shall work at any
machine to which this section applied, unless has been fully
instructed as to the dangers arising in connection with the
machine
1. Section 20
2. Section 21
3. Section 22
4. Section 23
NTPC Gadarwara Super Thermal Power Project

Que:84
When work or testing is to be carried out external to a
hydrogen filled machine such as external maintenance of H2
seals, the H2 in the casing must either be evacuated by the
use of an approved vacuum method or replaced by…………….
1. O2
2. Air
3. Inert gas
4. None of the above
NTPC Gadarwara Super Thermal Power Project

Que:85
Where work is to be done on exposed overhead conductors,
or where work is in the vicinity of such conductors so that
danger could arise, the electrical supply to the conductors
must be isolated and ……………………………….issued.
1. PTW
2. Limited work certificate
3. PTW with ROMP
4. Sanction for test
NTPC Gadarwara Super Thermal Power Project

Que:86
The main danger to personnel working in confined space are:-
1. Asphyxiation, poisoning due to toxic atmosphere
2. Burns from fire or explosion in the presence of
flammable gases or excess O2
3. Effect of chemical and abnormal temperature
4. All of the above
NTPC Gadarwara Super Thermal Power Project

Que:87
As per factories act 1948 no portable electrical light or any
other electric appliances of voltage exceeding 24 volts shall
be permitted for use inside any chamber, tank, vat, pit, pipe
flue or other confined space
1. Section 21
2. Section 36 (A)
3. Section 37
4. Section 23
NTPC Gadarwara Super Thermal Power Project

Que:88
Under section……….., no plant, tank or vessel which contains
or has contained any explosive or inflammable substance
shall be subjected in any factory to any welding, brazing,
soldering or cutting operation which involve application of
heat.
1. 21
2. 36 (A)
3. 37
4. 23
NTPC Gadarwara Super Thermal Power Project

Que:89
The environment of the vessel shall be examined by a
selected person. If the selected person needs to enter the
confined space he must be issued with a ………………...
1. Sanction for test
2. PTW with ROMP
3. Limited work certificate
4. Permit to work
NTPC Gadarwara Super Thermal Power Project

Que:90
What will be the safe oxygen percentage in confined space.
1. 19.5% and 23.5%
2. 18.5% and 22.5%
3. 19.5% and 22.5%
4. 18.5% and 23.5%
NTPC Gadarwara Super Thermal Power Project

Que:91
"boiler" means any closed vessel exceeding …………in capacity
which is used expressly for generating steam under pressure
and includes any mounting or other fitting attached to such
vessel, which is wholly or partly under pressure when is shut
off.
1. 23.75 liters
2. 24.75 liters
3. 21.75 liters
4. 22.75 liters
NTPC Gadarwara Super Thermal Power Project

Que:92
As per CEA Regulation the EOT cranes shall be provided for
maintenance of TG cycle equipment and CW pumps. These
shall comply with the requirements of latest versions of
relevant IS. The crane capacity shall be taken as ……….more
than the single heaviest equipment to be lifted.
1. 10%
2. 15%
3. 20%
4. 25%
NTPC Gadarwara Super Thermal Power Project

Que:93
As per Factories act 1948 Power Generating Industries comes
under the “List of industries involving hazardous processes”
mention in which schedule .
1. The First Schedule
2. The Second Schedule
3. The Third Schedule
4. The Forth Schedule
NTPC Gadarwara Super Thermal Power Project

Que:94
As per Factories act 1948 Schedule Second “Permissible levels
of certain chemical substance in work environment” what is
the TWA (8 hrs) & STEL (15 min) for the Chlorine.
1. 2 ppm & 5 ppm
2. 3 ppm & 6 ppm
3. 1 ppm & 3 ppm
4. 4 ppm & 6 ppm
NTPC Gadarwara Super Thermal Power Project

Que:95
As per Factories act 1948 Schedule Second “Permissible levels
of certain chemical substance in work environment” what is
the TWA (8 hrs) & STEL (15 min) for the Ammonia.
1. 25 ppm & 35 ppm
2. 30 ppm & 40 ppm
3. 20 ppm & 30 ppm
4. Not specify in the Schedule
NTPC Gadarwara Super Thermal Power Project

Que:96
As per Factories act 1948 Schedule Third “List of notifiable
diseases” which disease caused by the coal dust is called
Coal miners' pneumoconiosis (CWP) disease which also called
as……...
1. Silicosis
2. Anthrax
3. Black lungs
4. Asbestosis
NTPC Gadarwara Super Thermal Power Project

Que:97
As per factories act 1948 “Plant safety committee” comprising
of ……% of management representative and ……..% of worker
representative.
1. 50 & 50
2. 60 & 40
3. 40 & 60
4. 55 & 45
NTPC Gadarwara Super Thermal Power Project

Que:98
When any locomotive is left unattended, the controlling gear
must be locked in the “…..” position and the brakes applied
with the brake controls locked in the “……..” position.
1. ON & ON
2. OFF & ON
3. ON & OFF
4. OFF & OFF
NTPC Gadarwara Super Thermal Power Project

Que:99
Running of conveyor or plant or cleaning should be done by a
……………….. Only and should be done with all safety
precautions.
1. Contract worker
2. Housekeeping staff
3. Competent person
4. Location incharge
NTPC Gadarwara Super Thermal Power Project

Que:100
NTPC Electrical & Mechanical Safety Rules Handbook written
in 1996 by
1. Sh BN OJHA
2. Sh KU Mistri
3. Sh George Robotham
4. Sh RK Sharma
सतर्क रहें
सुरक्षित रहें
Thank You