Вы находитесь на странице: 1из 16

No Año Intensidad

1 1975 83
2 1976 75
3 1977 67
4 1978 87
5 1979 91
6 1980 85
7 1981 92
8 1982 86
9 1983 84
10 1984 76
11 1985 81
12 1986 88
13 1987 95
14 1988 92
15 1989 82
16 1990 85
17 1991 78
18 1992 72
19 1993 75
20 1994 83
No Año Intensidad No Intensidad % % acum
1 1975 83 3 67 4.04 4.04
2 1976 75 18 72 4.35 8.39
3 1977 67 2 75 4.53 12.91
4 1978 87 19 75 4.53 17.44
5 1979 91 10 76 4.59 22.03
6 1980 85 17 78 4.71 26.74
7 1981 92 11 81 4.89 31.62
8 1982 86 15 82 4.95 36.57
9 1983 84 1 83 5.01 41.58
10 1984 76 20 83 5.01 46.59
11 1985 81 9 84 5.07 51.66
12 1986 88 6 85 5.13 56.79
13 1987 95 16 85 5.13 61.92
8 86 5.19 67.11
14 1988 92
4 87 5.25 72.36
15 1989 82
12 88 5.31 77.67
16 1990 85
5 91 5.49 83.16
17 1991 78
7 92 5.55 88.71
18 1992 72
14 92 5.55 94.27
19 1993 75
13 95 5.73 100.00
20 1994 83
1657
Intensidad % acum 100.00
67 4.04
72 8.39 90.00

75 12.91
75 17.44 80.00

76 22.03
78 26.74 70.00

81 31.62
60.00
82 36.57
83 41.58
50.00
83 46.59
84 51.66 40.00
85 56.79
85 61.92 30.00

86 67.11
87 72.36 20.00

88 77.67
91 83.16 10.00

92 88.71
0.00
92 94.27 60 65 70 75 80 85 90 95 100
95 100.00
AREA HIDRÁULICA DE LA OBRA DE DRENAJE
Codigo de la Obra Sección Hidráulica (m2)
Hidráulica Geométrica (100%) Plena (75%) Media (50%)
ASTC 1X1 1.00 0.75 0.50
ASTC 1.5X1.5 2.25 1.69 1.13
ASTC 2X2 4.00 3.00 2.00
ASTC 2.5X2.5 6.25 4.69 3.13
ASTC 3X3 9.00 6.75 4.50

AREA HIDRÁULICA DE LA OBRA DE DRENAJE


Codigo de la Obra Sección Hidráulica (m2)
Hidráulica Geométrica (100%) Plena (75%) Media (50%)
ADTC 1X1 2.00 1.50 1.00
ADTC 1.5X1.5 4.50 3.38 2.25
ADTC 2X2 8.00 6.00 4.00
ADTC 2.5X2.5 12.50 9.38 6.25
ADTC 3X3 18.00 13.50 9.00

AREA HIDRÁULICA DE LA OBRA DE DRENAJE


Codigo de la Obra Sección Hidráulica (m2)
Hidráulica Geométrica (100%) Plena (75%) Media (50%)
ATTC 1X1 3.00 2.25 1.50
ATTC 1.5X1.5 6.75 5.06 3.38
ATTC 2X2 12.00 9.00 6.00
ATTC 2.5X2.5 18.75 14.06 9.38
ATTC 3X3 27.00 20.25 13.50
AREA HIDRÁULICA DE LA OBRA DE DRENAJE
Codigo de la Obra Sección Hidráulica (m2)
Hidráulica Geométrica (100%) Plena (75%) Media (50%)
ASTT d=1 0.78 0.59 0.39
ASTT d=1.2 1.13 0.85 0.57
ASTT d=1.5 1.77 1.33 0.89

AREA HIDRÁULICA DE LA OBRA DE DRENAJE


Codigo de la Obra Sección Hidráulica (m2)
Hidráulica Geométrica (100%) Plena (75%) Media (50%)
ADTT d=1 1.56 1.17 0.78
ADTT d=1.2 2.26 1.70 1.13
ADTT d=1.5 3.54 2.66 1.77

AREA HIDRÁULICA DE LA OBRA DE DRENAJE


Codigo de la Obra Sección Hidráulica (m2)
Hidráulica Geométrica (100%) Plena (75%) Media (50%)
ATTT d=1 2.34 1.76 1.17
ATTT d=1.2 3.39 2.54 1.70
ATTT d=1.5 5.31 3.98 2.66
METODO TALBOT
a= Area hidráulica (m2)
C= Coeficiente de escurrimiento
A= Area de la cuenca (Há)
ALCANTARILLAS METODO TALBOT
A a
C Plena Media
Há m2
0.65 1 0.12 ASTT D=1.00 ASTT D=1.00
0.65 2 0.20 ASTT D=1.00 ASTT D=1.00
0.65 3 0.27 ASTT D=1.00 ASTT D=1.00
0.65 4 0.34 ASTT D=1.00 ASTT D=1.00
0.65 5 0.40 ASTT D=1.00 ASTT D=1.20
0.65 6 0.46 ASTT D=1.00 ASTT D=1.20
0.65 7 0.51 ASTT D=1.00 ASTT D=1.20
0.65 8 0.57 ASTT D=1.00 ASTT D=1.20
0.65 9 0.62 ASTT D=1.20 ASTT D=1.50
0.65 10 0.67 ASTT D=1.20 ASTT D=1.50
METODO RACIONAL MODIFICADO
Qp= Caudal pico (l/seg)
C= Coeficiente de escorrentía
A= Area de drenaje (Ha)
I= Intensidad de lluvia (mm/hr)

Qp= C x A x Ix2.78

VELOCIDAD
V= Velocidad (m/s)
Q= Caudal (m3/s)
A= Area (m2)

V= Q/A
TIEMPO DE CONCENTRACIÓN
Tc= Tiempo de concentracion (h)
L= Longitud del cauce principal (km)
S= Pendiente (%)
ELEMENTOS DE DRENAJE TRANSVERSAL (METODO RACIONAL MODIFICADO)
A I Qp Qp V A
C Plena Media
Há mm/h l/seg m3/seg m/seg m2
8 0.65 80 1156.48 1.16 2.5 0.46 ASTC 1.0X1.0 ASTC 1.0X1.0
9 0.65 80 1301.04 1.30 2.5 0.52 ASTC 1.0X1.0 ASTC 1.5X1.5
10 0.65 80 1445.60 1.45 2.5 0.58 ASTC 1.0X1.0 ASTC 1.5X1.5
11 0.65 80 1590.16 1.59 2.5 0.64 ASTC 1.0X1.0 ASTC 1.5X1.5
12 0.65 80 1734.72 1.73 2.5 0.69 ASTC 1.0X1.0 ASTC 1.5X1.5
13 0.65 80 1879.28 1.88 2.5 0.75 ASTC 1.0X1.0 ASTC 1.5X1.5
14 0.65 80 2023.84 2.02 2.5 0.81 ASTC 1.5X1.5 ASTC 1.5X1.5
15 0.65 80 2168.40 2.17 2.5 0.87 ASTC 1.5X1.5 ASTC 1.5X1.5
16 0.65 80 2312.96 2.31 2.5 0.93 ASTC 1.5X1.5 ASTC 1.5X1.5
17 0.65 80 2457.52 2.46 2.5 0.98 ASTC 1.5X1.5 ASTC 1.5X1.5
18 0.65 80 2602.08 2.60 2.5 1.04 ASTC 1.5X1.5 ASTC 1.5X1.5
19 0.65 80 2746.64 2.75 2.5 1.10 ASTC 1.5X1.5 ASTC 1.5X1.5
20 0.65 80 2891.20 2.89 2.5 1.16 ASTC 1.5X1.5 ASTC 2.0X2.0
Estación: Bolivar Latitud Sud: 17º 58' 00"
Departamento: Cochabamba Longitud Oeste: 66º 24' 00"
Provincia: Arque Altura m/s/n/m: 2820
DATOS DE : PRECIPITACIÓN TOTAL (mm)

AÑO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ANUAL
1968 **** **** **** **** **** **** **** **** **** **** 80.5 108.5 ****
1969 185.2 107.5 75.9 41.0 0.2 0.0 0.0 0.3 0.7 15.2 25.4 23.5 474.9
1970 104.5 170.1 29.6 9.0 4.0 0.0 7.0 0.0 13.0 12.8 5.0 29.5 384.5
1971 45.0 100.7 9.6 1.5 0.0 8.0 0.2 0.4 0.4 6.3 31.7 50.5 254.3
1972 72.9 72.0 43.0 0.4 0.3 0.0 0.0 0.0 1.6 5.2 24.9 137.6 357.9
1973 111.6 42.9 42.4 1.0 8.1 0.0 1.8 7.4 0.8 20.3 8.0 53.8 298.1
1974 167.1 130.1 36.4 11.0 0.0 0.0 0.0 14.0 0.3 23.0 35.2 26.3 443.4
1975 72.8 44.5 13.2 3.7 0.6 0.6 0.0 0.0 3.4 5.3 20.9 88.3 253.3
1976 109.2 51.8 49.7 0.3 0.6 0.0 11.7 0.8 26.5 0.0 37.6 44.6 332.8
1977 43.9 83.3 116.0 12.1 0.7 0.0 22.4 10.6 17.0 **** **** 193.3 ****
1978 159.1 179.8 69.4 37.4 38.2 0.0 0.0 7.0 5.9 43.0 54.1 124.0 717.9
SUMA 1071.3 982.7 485.2 117.4 52.7 8.6 43.1 40.5 69.6 131.1 323.3 879.9 3517.1
MEDIA 107.1 98.3 48.5 11.7 5.3 0.9 4.3 4.0 7.0 14.6 32.3 80.0 390.8

DATOS DE : PRECIPITACIÓN MÁXIMA EN 24 Hrs. (mm)

AÑO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ANUAL
1968 **** **** **** **** **** **** **** **** **** **** 13.5 41.3 41.3
1969 23.5 22.0 17.0 17.4 0.2 0.0 0.0 0.3 0.5 15.0 8.9 7.0 23.5
1970 35.0 75.0 7.3 3.2 2.5 0.0 5.0 0.0 11.0 5.0 5.0 7.0 75.0
1971 8.0 20.0 5.0 1.5 0.0 4.0 0.2 0.4 0.4 2.2 9.0 14.0 20.0
1972 12.0 17.3 15.2 0.4 0.3 0.0 0.0 0.0 0.9 5.0 11.4 22.0 22.0
1973 15.4 16.0 20.0 0.6 7.6 0.0 1.8 7.0 0.8 8.3 5.0 14.0 20.0
1974 20.0 20.0 8.1 8.0 0.0 0.0 0.0 13.4 0.3 11.0 15.0 7.1 20.0
1975 12.0 9.0 4.0 3.0 0.6 0.6 0.0 0.0 3.0 5.0 18.0 19.4 19.4
1976 16.0 20.0 20.0 0.3 0.6 0.0 8.3 0.8 10.0 0.0 13.2 19.4 20.0
1977 20.0 15.0 20.8 8.7 0.7 0.0 8.3 6.5 9.0 **** **** 27.0 27.0
1978 35.4 31.0 17.0 9.3 8.9 0.0 0.0 4.5 3.5 11.5 20.0 18.3 35.4
MAX 35.4 75.0 20.8 17.4 8.9 4.0 8.3 13.4 11.0 15.0 20.0 41.3 75.0
HIDROLOGÍA

MEMORIA DE CALCULO

En este acápite se determinan los caudales de las cuencas y subcuencas por el método
racional.

Debido a la falta de pluviógrafos en las estaciones próximas al sitio de proyecto, que permitan
una determinación directa de las curvas de intensidad - duración - frecuencia, se trabajó
sobre la base de registros de máximas precipitaciones diarias.

ESTIMACION DE LA PRECIPITACION MAXIMA PROBABLE

La precipitación máxima probable es aquella magnitud de lluvia que ocurre sobre una cuenca
particular, en la cual generará un gasto de avenida, para el que virtualmente no existe riesgo
de ser excedido.

Los diversos procedimientos de estimación de la precipitación máxima probable no están


normalizados, ya que varían principalmente con la cantidad y calidad de los datos
disponibles; además, cambian con el tamaño de la cuenca, su emplazamiento y su
topografía, con los tipos de temporales que producen las precipitaciones extremas y con el
clima. Los métodos de estimación de fácil y rápida aplicación son los empíricos y el
estadístico.

Aunque existe un número importante de distribuciones de probabilidad empleadas en


hidrología, son sólo unas cuantas las comunmente utilizadas, debido a que los datos
hidrológicos de diversos tipos han probado en repetidas ocasiones ajustarse
satisfactoriamente a un cierto modelo teórico. Las lluvias máximas horarias o diarias por lo
común se ajustan bien a la distribución de valores extremos tipo I o Gumbel, a la Log-Pearson
tipo III y a la gamma incompleta. En este proyecto se empleó la distribución Gumbel.

Se trabajará con la serie anual de máximos correspondiente a la estación Bolivar.


Registros pluviométricos Estación Bolivar - Método Gumbel

Mes Precipitación (mm)


No Año
Max. Precip. xi (xi - x)^2
1 1968 DIC 41.3 141.18
2 1969 ENE 23.5 35.02
3 1970 FEB 75.0 2077.70
4 1971 FEB 20.0 88.70
5 1972 DIC 22.0 55.03
6 1973 MAR 20.0 88.70
7 1974 FEB 20.0 88.70
8 1975 DIC 19.4 100.36
9 1976 FEB 20.0 88.70
10 1977 DIC 27.0 5.85
11 1978 ENE 35.4 35.78
Suma 323.6 2805.74

x=
åx i
= 29.42 mm
n

å (x - x)
n
2
i
i =1
S= = 16.75 mm
n -1
6
a= *s = 13.06 mm
p

u = x - 0.5772 * a = 21.88 mm

Para el modelo de probabilidad: æ x -u ö


- çç ÷÷
-e è a ø
F(x) = e
Según el estudio de miles de estaciones - año de datos de lluvia, realizado por L. L. Welss, los
resultados de un análisis probabilístico llevado a cabo con lluvias máximas anuales tomadas en un único
y fijo intervalo de observación, al ser incrementados en un 13% conducían a magnitudes más
Cálculo de las láminas para distintas frecuencias
Fuente: Elaboración propia

Periodo Variable Precip. Prob. de Corrección


Retorno Reducida (mm) ocurrencia intervalo fijo
Años YT XT'(mm) F(xT) XT (mm)
2 0.3665 26.6666 0.5000 30.1332
5 1.4999 41.4693 0.8000 46.8603
10 2.2504 51.2700 0.9000 57.9352
25 3.1985 63.6533 0.9600 71.9282
50 3.9019 72.8399 0.9800 82.3091
75 4.3108 78.1795 0.9867 88.3428
100 4.6001 81.9586 0.9900 92.6132
500 6.2136 103.0307 0.9980 116.4247
Consideración de obra 0.75L x L^1.25
Consideración de arrastre Ax1.35 Suelos sueltos
Ax1.22 Suelos consolidos
Consideración de eroción Ax1.12 Suelos homogeneos
Ax1.16 Suelos heterogeneos
Consideración climática Ix1.1 menos de 20 datos
Ix1.08 menos de 30 datos
Ix1.05 menos de 50 datos

Вам также может понравиться