1st Amendment in DSM for

CSPGCL
Amendment in Operating Frequency
range by CERC
Period Operating range

• July 2002 to 31st March 2009 49.00 Hz to 50.50 Hz

• 1st April 2009 to 2nd May 2010 49.20 Hz to 50.30 Hz

• 3rd May 2010 to 16th Feb 2014 49.50 Hz to 50.20 Hz

• 17th Feb2014 to 20th Nov. 2018 49.70 Hz to 50.10 Hz

• 21th Nov. 2018 to 17th April 2019 49.85 Hz to 50.05 Hz

• 18 th April 2019 onward 49.85 Hz to 50.10 Hz


Total Charges

Total Charges
DC Charges Fixed Charge
(Capacity Charge)

Sch. Energy Variable Charge


Charges (Energy Charge)

Un-Scheduled
DSM Charges Interchange (UI)

 Scheduled energy = Declared capacity –Backing Down

 Deviation Energy = (Actual Injection- Schedule energy)


Capacity Charges
• Capacity Charges is payable towards the reimbursement of the fixed
costs of the plant ,linked to the plant availability factor (PAF)
• Full recovery of Fixed charges at Normative Plant Availability
Factor(PAF)-78.69% for 4x210 MW
• PAF = DC/IC(1-NAUX)
DC =Declared Capacity
IC = Installed Capacity (4x210 MW)
NAUX = Normative Value of Aux Consumption (9.7%)
• Fixed Charges = AFC ( PAF/NPAF)
AFC = Annual Fixed Cost (524.06 Cr/year)
i.e. 1% PAF=Rs.6.660 Crore
( Issued by CSERC for 4x210 MW for 2019-20)
PAF = Actual Plant Availability Factor
• Higher the Achieved PAF - higher the recovery of Fixed Costs of the
plant.
• Lower the Achieved PAF - Lower the recovery of Fixed Costs of the
plant.
For 500 MW
INSTALLED CAPACITY = 500MW
NAPC (NORMATIVE AUXILLARY POWER
CONSUMPTION) = 500*5.25/100 =26.25 MW
100% DC = (500 – 26.25) = 473.75MW
For 4X210 MW
INSTALLED CAPACITY = 840MW
NAPC (NORMATIVE AUXILLARY POWER
CONSUMPTION) = 840*9.7/100 =81.48 MW
100% DC = (840 – 81.48) = 758.52MW
CALCULATION OF PAF & CAPACITY
CHARGE
• ONE DAY PAF =(SUMMATION OF all 96 Blocks
DC/4)/758.52*24
• CAPACITY CHARGE = 524.06 Cr.
• NORMATIVE PAF = 758.52*24*366*0.7869 MWh
= 5242988/10000 Cr. KWh
= 524.30 Cr. Kwh
• Fixed Cost/Unit=Capacity Charge /KWh
=524.06/524.30 RS/kwh
=0.9995 Rs./Kwh
SCHEDULE ENERGY COST
• SCHEDULE ENERGY CHARGE =SPECIFIC COAL COST+
SPECIFIC FUEL OIL COST

KEB • 1.927
HTPS • 1.487
DSPM • 1.545
KW EXT • 1.264
MARWA • 1.393
Normative Parameters decided by CSERC
For 2019-20
S.No. Normative Parameters MARWA DSPM HTPS 1X500

1 NPAF (%) 76.5 85 78.69 85


2 Aux Consumption (%) 5.60 9.0 9.7 5.25
3 GSHR (kCal/kWh)/Design 2432 2500 2650 2375
Gross HR/Design Net HR
4 Net SHR(kCal/kWh) 2576 2747 2934 2506

5 Specific Oil (ml/kWh) 0.5 0.5 0.9 0.5


6 Annual Fixed Charges (AFC) in 1599.32 415.86 524.06 629.05
Cr/yr
7 Fixed Cost/Unit (Rs./KWh) 2.860 1.224 0.9995 1.778
8 Energy Charges Rate (ECR) in 1.393 1.545 1.487 1.264
Rs/unit
9 Total Charges (Rs/KWh) 4.253 2.769 2.487 3.042
Unscheduled Interchange charges (UI)
OR DSM Charges
 UI charges are payable/receivable depending upon
deviation from the schedule and also subject to the
average grid frequency at that time block.
 UI Charges = (Actual Inj -Schedule Inj ) X UI rate
 Charges for UI are frequency linked and are payable/
recoverable depending on grid frequency if:
a) A generator generates more than schedule – Get UI
b) A generator generates less than the schedule – Pay UI
 This is the element, which is expected to bring about
discipline in the system.
Area Clearing Price (ACP)- The price of a time block
electricity contract established on the Power Exchange after
considering all valid purchase and sale bids in particular
area(s) after market splitting, i.e. dividing the market across
constrained transmission corridor(s).”
Limitation of Deviation @ 1%
Change in Regulation for OI

3rd A

4th A

5th A
Change in Regulation for UI
Old Sign Change Rule _4th Ammend.
New Sign Change Rule (5th Amend.)_
till 31.03.2020
New Sign Change Rule (5th Amend.)_
from 01.04.2020
Revision of DC/Schedule

Revision of DC (Generating End)


• Tripping of unit – DC will be effective from 3rd
time block.
• Day Ahead DC cannot be revised after 22:00
Hrs.
• Deviation of whole day should be within 1% of
Schedule otherwise 20% penalty of Daily base
DSM will be imposed.
DSM RULES for Additional Charges
• No under injection allowed below frequency 49.85 Hz.
• No Over injection allowed above frequency 50.10 Hz.
• Additional charge for deviation(ACFD) imposed when
deviation limits crossed 12%.
Deviation ACFD
12-15% 20% of UI
15-20% 40% of UI
Above 20% 100% of UI
• Additional charge for (ACFD) for No. of violation in a day.