A study on the operation of
machineries at Rim Dyeing Ltd.
Lutfur Rahman
ID: 14207101
Program: BSME
4
Objectives
To gain basic understanding of operation of
different machineries, Trouble-shooting
procedures and the related aspects at Rim
dyeing Ltd.
To have practical experience of job life.
To gain knowledge about Production
Operation (Mechanical part).
Primary test and check equipment’s
Find out primary fault
5
Company Profile
Rim Dyeing Ltd. is committed to provide excellent
services to it’s clients. It is dedicated to focus on quality
in order to excel in its performance, since December 09,
2004. Now they have one dyeing factory and two
garment manufacturing units.
6
Factory Basement Layout
Location
Head Office:
Rim Industries Ltd.
20, Ahsan Ullah Road , Nawab Bari.
Islampur, Dhaka, Bangladesh
Mobile :01712128296
Mail: rimdyeing@gmail.com
Factory Location:
Rim Dyeing Ltd.
211-213, Bscic Industrial Estate
Tongi, Gazipur- 1712, Bangladesh
Mobile; 01715616581
Mail: nazrul.r7@gmail.com Figure: Factory Gate
8
Company Products
Figure: Products
9
Buyers
Figure: Buyers 10
Chain of Production Process
11
Machine Details
Gas Singeing Section: Gas Singeing
Machine
Finishing Section:
1. Dryer Machine
2. Stenter Machine
12
Gas Singeing Machine
The fabric passes over a burning gas flame at
such a speed that only the fibers burn and the
main body of the fabric is not damaged by the
flame.
Function of the Gas Singeing Machine:
Smoothness and evenness of the fabric is
increased.
Gas flame can be changed according to fabric
with.
Both side of the fabric can be singeing
13
Continue
Main Parts:
Brush
Gas Burner
Guide Roller
De-sizing Tank
Squeezing Roller
15
Operation
At first collect the raw material or fabric. This fabric
transfer to brush with the help of squeezing roller.
At this time removing dust from the fabric. Then fabric
transfer to the gas burner.
The fabric is moved very quickly, and only the fiber
ends are destroyed.
As soon as the fabric leaves the singeing area, it enters
a water bath or de-sizing bath. It’s containing de-sizing
liquor. For de-sizing wetting agent, Enzyme, soda, salt
Acetic acid is required. Temperature is maintained
around 80-100’C.
After de-sizing fabric is collect in rolled in batching in
uniform tension.
16
Mercerize Machine
Mercerize machine is a process for increasing
absorbency, strength, and luster of the fabric by
physio-chemical treatment.
Function of Mercerize Machine
Increased luster
Increased tensile strength
Increased apparent color depth after dyeing
Improved dimensional stability
17
Mercerize Machine
Main parts:
Fabric inlet
Impregnation-
1(IMP)
Impregnation-
2(IMP)
Washing chamber
Neutralizing
chamber
Batching
Figure: Mercerize Machine 18
Continue
20
Dyeing Section
21
Dyeing
Dyeing is the process of adding color to textile products
like fibers, yarns, and fabrics. Dyeing is normally done in a
special solution containing dyes and particular chemical material.
The temperature and time controlling are two key factors in dyeing.
23
Main Parts of Dyeing Machine
Power control
board
Water line
Steam line
Air line
Winch
Dosing tank
Mixing tank
Pump
Heat exchanger
Reserve/PT tank
26
Finishing
The final processing of the fabric to increase the natural
properties or attractiveness before the fabric is cut into
apparel or made into any article of textile is called finishing.
29
Dryer Machine
Dryer machine as a process to dry the fabrics.
We can define drying as a process where the
liquid portion of the solution is evaporated from
the fabrics.
Function of Dryer Machine:
To dry the fabric
To control the shrinkage
To control the overfeed system
30
Continue
Main parts of
Dryer machine:
Squeezing Roller
Cylinder
Steam
Condensate
33
Stenter Machine
Stenter machine is used for open form fabric.
After passing the open compactor, fabric center
into the steneter. Then stenter is to stretch the
fabric widthwise and to the recover the uniform
width.
Function of Stenter Machine
GSM Control
Width Control
Shrinkage
34
Continue
Main parts of
Stenter machine:
Wheel
Chain Rail
Nozzle
Burner
Blower
Guide Roller
36
Problem Finding, Analyzing
and Solution
37
Problem Finding, Analyzing and Solution
As Gas Singeing, Mercerize, dyeing, Dryer, Stenter
machine components are always working under
high rotational forces, various problems may
happen. The most significant problems are:
Problem in Bearing Cage
Problem in shaft
Problem in roller
Problem in Fiber Wheel
Problem in Dryer was not heated
Problem in coupling and Bearing
38
1.Problem in Bearing Cage
Analysis: In this case
problem was found in
Gas singeing Machine.
Sometimes the bearing
cage was damaged. This
problem occurs due to
some reasons. They are
given below:
Vibration
Excessive load
42
3.Problem in Roller
Analysis: In this case
problem was occurs
in dryer machine.
Sometimes fabric
was not properly dry
by the roller. This
problem occurs due
to some reason:
Roller rubber erosion
51
Conclusion
Industrial training is an important and essential part
of our education. It gives us an opportunity to
compare the theoretical knowledge with practical
facts which develop knowledge and skills of a
student. This industrial training also gives an
opportunity to enlarge the knowledge about
production planning, procurement system,
production process, operation of machineries. It
teaches a student to adjust with the practical life.
After all, I realized that industrial training increase
our practical knowledge and confident for future
life.
52