Вы находитесь на странице: 1из 2

SUMMARY OF DESIGN

SUBMISSION STATUS
Date-18/06/2019

Total Design related submissions from DBL


= 44 Nos.

REJECTED SUBMISSIONS= 27
1. Design Submission Program
2. Alignment Drawing-R0
3. Design Basis Report-R0 APPROVED = 5 UNDER REVIEW= 12
4. GAD with span arrangement – R0
5. BIM Manual – R0
6. Credentials for Launching Girder
manufacturer 1. CV approval for DDC PM
7. Design Checking plan- R0 2. CV approval for BIM Manager
8. MS for High strain dynamic testing 3. BIM Manual
9. GAD for Obligatory span P10-P11 4. Test Pile/TP1
10. MS for cast-in-situ bored Piles – R0 5. CV approval for DDC Lead Str.
11. Credentials for Coupler supplier Engineer
12. BIM Manual-R1
13. Design Basis report – R1 For Design review = 7
14. Casting yard Gantry foundation-R0 1. Station levels for
15.
16.
BIM Manual- R1
Test Pile/TP1 Design & Dwgs- R0
Contractual Letters = 5 Finalization of Vertical
1. Determination of Seismic Zone profile
17. DS1 structural drawing-R0
18. Design Checking plan – R1 2. Proposal for meeting to 2. Alignment GAD
19. CV for Engineering manager finalize Structural Drawings of 3. Pile Load test
20. CV for Lead Str. Engineer (DDC) DS1 4. CRD Drawing for Test Pile 1
21. Credentials for reinforcement coupler 3. Request for the station levels (A1 dwg for signatures
(M/s Hi-tech Engg. Solutions) for finalization of vertical only)
22. Credentials for reinforcement coupler profile 5. Str. Dwgs of DS1 (DRS
(M/s Halfen-Moment) 4. Approval for GAD compliance not attached)
23. Pile load test 5. Designer JV Roles & 6. Casting yard Gantry
24. Adopted seismic Zone foundation-R1
Responsibilities
25. Design Basis Report (DBR)-R2
7. GAD of Obligatory span
26. Test Pile-2 Design & dwg- TP2
P10-P11-R1
27. Pile load test – TP2

Вам также может понравиться