Вы находитесь на странице: 1из 34

MODULE III –

MATERIALS QUALITY
CONROL
ENGR. JEHELA G. ROXAS
Planning and Design Section
DPWH-BATANGAS IV DEO
QUALITY CONTROL
PROGRAM
QUALITY CONTROL PROGRAM

Define Quality

HERMES BAG worth 1.72 million HK Dollars


QUALITY CONTROL PROGRAM

 DEFINE QUALITY.
Quality is the degree of excellence. It is described by such general
terms as stable, durable, rigid or flexible.
Quality is controlled during construction by testing and inspection of
the quality of materials and the methods of construction, the latter
commonly known as workmanship.
QUALITY CONTROL PROGRAM

“ Quality is never an accident. It is


always the result of intelligent
effort.”
----john ruskin
QUALITY CONTROL PROGRAM

DEFINE CONTROL
QUALITY CONTROL PROGRAM

 DEFINE CONTROL.
Control is to regulate. It is instituted when there is need to check or
regulate due to some important reasons.
QUALITY CONTROL PROGRAM

 QUALITY CONTROL
Checking for conformance to requirements. It is instituted during the
course of construction as a preventive tool, not as a corrective
measure. “Preventive measures are always more economical”.
QUALITY CONTROL PROGRAM
 QUALITY CONTROL FORMULA
HQ(M + W) = (HQ + E)S

Where:
HQ = High Quality
M = Materials
W = Work
E = Economical
S = Structure
QUALITY CONTROL PROGRAM

 QUALITY CONTROL PROGRAM


It is a program that includes provisions on how the work and materials
should be inspected and the nature and amount of testing work to be
done.
QUALITY CONTROL PROGRAM

SITE
PLANS
VALIDATION/INSPECTION

QUANTIFICATION AND QUALITY CONTROL


ESTIMATES PROGRAM (QCP)
QUALITY CONTROL PROGRAM
MINIMUM TESTING
REQUIREMENTS
MINIMUM TESTING REQUIREMENTS

• Prescribed in each project based on estimated quantities.


• The requirements specify the kind and number of tests for each
item of work.
• ..\MinimumTestRequirement2try (2).xlsx
BASIC TESTING
EQUIPMENTS
BASIC TESTING EQUIPMENTS

SAMPLE SPLITTER
BASIC TESTING EQUIPMENTS

LIQUID LIMIT AND PLASTIC LIMIT EQUIPMENTS


BASIC TESTING EQUIPMENTS

CALIFORNIA BEARING RATIO EQUIPMENTS


BASIC TESTING EQUIPMENTS

EQUIPMENTS FOR COMPACTION TEST


BASIC TESTING EQUIPMENTS

PARTICLE SIZE DISTRIBUTION ANALYSIS


BASIC TESTING EQUIPMENTS

ABRASION TEST
BASIC TESTING EQUIPMENTS

FIELD DENSITY TEST


BASIC TESTING EQUIPMENTS

EQUIPMENTS FOR CONCRETE SAMPLES


BASIC TESTING EQUIPMENTS

COMPRESSION MACHINE
BASIC TESTING EQUIPMENTS

EXTRACTION MACHINE
BASIC TESTING EQUIPMENTS

OTHER TOOLS
MATERIALS SAMPLING
MATERIALS SAMPLING
MATERIALS SAMPLING

When should the testing of materials be conducted?

“Testing of materials is conducted prior to incorporation into


work.”

If the test is not conducted at the proper time, there is no quality


control since it will then be too late to correct anything that is
defective.

If someone will attempt to evaluate the quality of materials


without testing, he is taking a big risk because he is guessing.
MINIMUM REQUIREMENTS FOR
SUBMISSION OF SAMPLES
MINIMUM REQUIREMENTS FOR
SUBMISSION OF SAMPLES
MINIMUM REQUIREMENTS FOR
SUBMISSION OF SAMPLES
MINIMUM REQUIREMENTS FOR
SUBMISSION OF SAMPLES
Thank Yu…

Вам также может понравиться