KOMISI U & M
SYSTEM DESIGN
1. Codes, Standards & Regulations
2. Supply quality
3. Utility Consumption
4. Supply Capacity
5. Material & Brand Specification
6. Block flow diagram
7. Energy Management
8. Automation System
9. Budget (Basic Energy Management, Automation)
10. Progress Map
11. Updates
12. Cost Effective Design Measure (Cost Quality)
1.Codes, Standard & Regulation
ASME
JIS
ASTM (material)
IEC & PUIL (instalasi listrik kompresor)
NFPA (pengamanan ruang kompresor)
ISO – Compressed air qualities
DEPNAKER
2. Supply Quality
Quality Classes:
Secondary 1.4.1
Primary 2.4.2
Working pressure 6,5 barg di Compressor
room
System pressure 6 barg
Pressure drop 0,5 bar
NO Line Steam NO Line Steam
( kg/h ) ( kg/h )
1 PreCut-1 415,31 26 Flavour 4,00
2 PreCut-2 415,36 27 Office Flavour 0,00
3 CRS 12,85 Kapasitas Pemakaian per-jam 0,00
4 Strip-1 / Krosok 1 243,60 Pemakaian per-hari 0,00
5 Strip-2 / Krosok 2 243,60 28 Main Office 0,00
6 Clove 3,85 29 Utility 1,83
7 PreBlend / Silo Kelompok 1,20 30 Line Losses 0,00
8 Blending 2 (6 ton) 270,40 31 Utility Office 0,00
9 Blending 1 (3 ton) 154,40 Kapasitas Pemakaian per-jam 0,00
3. Consumption
Kapasitas diperlukan
5574 / (0,685x0,95x0,81) = 10.575 m3/jam
4. Supply Capacity cont’d
Existing:
3 unit compressor GA 75-7,5 @ 846 m3/h
2 unit refrigerant dryer FD 560 @ 2016 m3/h
2 unit air receiver terpasang @ 5 m3,
2 unit air receiver tidak terpasang @ 5m3
Air Treatment
Compressed acc. To ISO CA CA
Air standards Distribution Consumption
COMPRESSOR ROOM
TOTALIZER
FM CLOVE
TOTALIZER
FM PRECUT
II DISTRIBUTION
II.1 CA DISTRIBUTION 1 lot Rp 3.459.057.000 Rp 3.459.057.000
TOTAL
No PEKERJAAN MATERIAL UPAH
US RP RP
I PRELIMINARIES 120.000.000
II EQUIPMENT WATER SUPPLY 478 611.088.505 154.312.775
III DISTRIBUTION PIPE
A. AREA SITE PLANT - 243.609.840 263.135.825
B. AREA SILO KELOMPOK - 460.564.835 48.739.550
C. AREA FINISH BLEND - 74.158.335 6.980.175
C. AREA BLENDING LINE - 127.172.335 11.107.625
D. AREA PACELLER & PALLETIZER - 28.530.370 3.549.050
E. AREA MAKER PACKER - - -
F. AREA UTILITY - - -
F. AREA FLAVOR - - -
IV ALAT UKUR (MEASURMENT) 94.150 - 1.710.000
V PEKERJAAN LAIN - LAIN - 22.500.000 35.000.000
TOTAL 94.628 1.567.624.220 644.535.000
Jasa 10 % 9.463 156.762.422 64.453.500
TOTAL 104.091 1.724.386.642 708.988.500
PPN 10% 10.409 172.438.664 70.898.850
Rp 3.764.461.516
Area Maker & Packer, Area Utility, Area Flavor, menunggu finish drawing.
9. Progress Map
STEAM - OASIS
No. Description Target 26/07/2007 26/09/2007 28/09/2007 Score
1 Consumption 20/07/2007 1
2 Single Line Diagram 20/07/2007 1
3 Piping Layout 20/07/2007 1
4 Cross check SLD & Piping Layout 26/07/2007 1
5 Material Specification 20/07/2007 1
6 Sizing (Pipe) 26/09/2007 0
7 Energy Management 20/07/2007 1
8 Automation 20/07/2007 1
9 Cost Estimation / Budget 28/09/2007 0
SCORE 7
78%
10. Updates
Pipe size finish blend, maker packer, silo
kelompok, area flavor
Budget pengadaan compressor dan air dryer
MEETING METAKOM 26/9/07
Piping at compressor room belum ada – Gambar diterima 4/10/07
QS (Quantity Surveyor) Jumat 28 September akan melakukan assessment
RAB ruang compressor
Piping di ruang utility i.e. Diesel, Compressor, Boiler, Water treatment harap
digambar
Pemilihan diameter pipa induk 8 inch dengan catatan ada pengecekan
investasi jika kita memilih 6 inch, selisihnya berapa, hari Jumat dibicarakan
dengan QS
Point of Use di KDF belum difollow up dengan Secondary besok pagi Kamis,
27/09/07 dengan Dyatmoko W.
Piping yang ke palletizer diubah tappingnya terdekat, Maker & Packer, pipe
line ke palletizer tidak perlu Flow meter
Point of Use di Flavor belum ada, segera dihubungi paling lambat hari
Kamis, 27 September
Point of Use di Utility belum ada, disarankan dikira –kira dulu. Dirundingkan
pak Warno.
MEETING METAKOM 09/10/07
Revisi gambar 30/10
Budget dan P&ID 06/11