A Presentation

on
Project Stage-I

Analysis and management of construction waste and


reduction method
By
Mr. Abhishek P. Jadhav
Mr. Soumitra M. Ghate
Mr. Viren V. Jaiswal
Mr. Parvez M. Shanediwan

Guide
Prof. Amol T. Pawar

Department of Civil Engineering,


17-09-2019 Savitribai Phule Pune University 2018 1
STES’s RMD Sinhgad School of Engineering, Warje, Pune. 58
Problem Statement
• Excessive wastage of material, inappropriate management of
waste materials, low awareness about reduction and improper
utilization of waste material. It occupy large area of land ,causes
soil pollution, water and air pollution.

17-09-2019 Savitribai Phule Pune University 2018 2


Aim and Objectives
Aim:
• To analyse and manage construction waste and study its reduction methods

Objectives:
• To understand the different types of waste materials
• To know different sources of waste.
• To analyze waste generated due to various activities
• Analysing preventive measures for waste reduction
• Implementation of preventive measures for waste reduction
• To minimize the waste generation and to create awareness.

17-09-2019 Savitribai Phule Pune University 2018 3


APPLICATION

• Reduction of waste generation


• Generate profit by waste management plan
• Create awareness regarding waste management plan and
educate people on site
• Minimum hazardous effect of waste dumping practices to
environment
• Improvement in current waste reduction techniques

17-09-2019 Savitribai Phule Pune University 2018 4


METHODOLOGY
• STEP 1]
• Study of current waste generation methods and disposal
methods
• STEP 2]
• Study the effect of wastage on project cost
• STEP 3]
• Analyse data to find out waste proportion
• STEP 4]
• Data collection through site visit from construction project
• STEP 5]
• Find the causes of wastage on site experience and
discussion with site engineer, Estimation engineer, Material
manager
• STEP 6]
• Generating statistical report
• STEP 7]
• Studying and implementing waste reduction techniques

17-09-2019 Savitribai Phule Pune University 2018 5


Estimation Analysis

Step 1 Static analysis Data Collection

Construction Area

Quantification Of Material Proportion


Step 2
Construction Waste
Material Loss Ratio
Construction Waste
Intensity

Results Analysis
Quantification & Waste Index
Step 3
Composition Results Comparison
Lesson For The
Reduction

17-09-2019 Savitribai Phule Pune University 2018 6


TIME LINE
Sr no. Month Plan
1 August Literature review + Project Planning

2 September Literature review + Field visits

3 October Different data analysis

4 November Report formation

5 December Field study

17-09-2019 Savitribai Phule Pune University 2018


TIME LINE
Sr no. Month Plan

6 January Primary data analysis

7 February Comparison with secondary data

8 March Examining results and discussion

9 April Final reporting

17-09-2019 Savitribai Phule Pune University 2018 8


LITERATURE SURVEY
Title of Paper Author Year
1. Management for construction materials A.A. Gulghane, 2015
and control of construction waste. P. V. Khandve
2. Study of management of waste K.R.Kareem 2013
materials in civil construction project R.K. Pandey

3. A study on wastage of materials in Prof. Shivanand Sanmat 2013


construction line
4. Material waste management in Gokulnath V 2013
construction site Janani K
5. Construction waste management in Minakshirani 2016
India Alisha Gupta
6. Material waste in builing industry Carlos T. Formose 2002
7. Professionals view of material wastage Ameh oko john 2013
and construcion site and cost overruns
8. Waste material management in Piyush Mandlik 2017
construcion industry of Nagpur Shubham More

17-09-2019 Savitribai Phule Pune University 2018 9


REFERENCE
[1] K.V. PATEL C.M. Vyas, construction material management on project sites , National Conference on Recent
trends in Engineering and Technology, 2011

[2M T. Phani S V. Mathew and S Roy Material management in construction.

[3] G Kanimozhi P Latha material management in construction industry Indian Journal of Applied Research, 4(4),
2014,pp1-3

[4] S V Desale, SV Deodhar identification and elimination of construction waste by using lean and six sigma
principles , International journal of innovative research

[5] KR Kareem , R K Pandey study of management and control of waste construction material in civil engineering
project

[6 ] Chandler Ian E “Material management on construction site “longman inc;78 edition

[7]Indira Gandhi national open university “material management” part Ms-5, Unit-.6

[8 ]Shri Rakesh J Hingu(2010) “waste management of building material during construction of structure” Sardar
patel university

17-09-2019 Savitribai Phule Pune University 2018 10


REFERENCE
[9] Ndabigengesere, A., Ndabigengesere, A., & K., S. (1997). Quality of water treated by coagulation using
moringa oleifera seeds. Pergamon.

[10] Nishi, L., & Salcedo Vieira, A. (2012). Hybrid process of coagulation/flocculation with moringa oleifera
followed by ultrafiltration to remove microcytis sp. cells from water supply. Procedia Engineering. Prague Czech
Republic: Elsevier.

[11] Okuda, T., & Baes, A. (1998). Improvement of extraction method of coagulation active components from
moringa oleifera. Pergamon by Elsevier.

[12] Omar, F. M., & Nik, N. (2008). COD reduction in semiconductor wastewater by natural and commercialized
coagulants using response surface methodology. Water Air Soil Pollution by Springer.

[13] Poumaye, N., & Mabingui, J. (2012). Contribution to the clarification of surface water from the moringa
oleifera . Chemical Engineering Research and Design.

[14] Wang, H., & Keller, A. A. (2010). Natural Organic Matter Removal by Adsorption onto carbonaceous
Nanoparticles and coagulation. Journal of Environmental Engineering ASCE.

17-09-2019 Savitribai Phule Pune University 2018 11


...Thank
You...

17-09-2019 Savitribai Phule Pune University 2018 12