SINHA, DGM (TURBINE)

WHAT IS PHASE ANGLE

360 0

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

USES OF PHASE ANGLE MEASUREMENT


1. BALANCING

2. STRUCTURE MOTION STUDY

3. DETECTION OF RESONANCE FREQUENCY


 RUN UP & RUN DOWN BEHAVIOUR
 BODE PLOT

4. HEALHINESS OF MATING SURFACES OF TWO VIBRATING MASSESS

5. UNDERSTANDING THE DEFLECTION MODE OF THE SHAFT

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)
STRUCTURE MOTION STUDY
REAR 245 0
220 FRONT FRONT 220 245 REAR
228 230 1 212 209

165 170 2 127 138

3
112 120 107 101
4/5
96 94 6 87 71
7

LEFT SIDE 8 RIGHT SIDE

53 56 51
63 9 9
19
19 14 14

33 10 10 24
20
20 15 15

11 11 7
21 16
11
` 16
21

-9 12 12 -14
22
22 17 17

-23 13 13 -25
23
23 18 18
BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA
A.K.SINHA, DGM (TURBINE)

STRUCTURE MOTION STUDY

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)
HEALHINESS OF MATING SURFACES OF TWO VIBRATING MASSESS

3
2
1
9
6
8
5
7 4 GENERATOR SIDE
BASE PLATE
D B
LEFT
15 11 12
21 C 14 A 10
RIGHT
20 13 18
19 17
16
SECONDARY GROUT

TURBINE SIDE

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

UNDERSTANDING THE DEFLECTION MODE OF THE SHAFT

B1 B2 B3 B4

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

Case Studies
on
Vibration Problems in Steam
Turbine Generators

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN
500 MW TG SETS

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 500 MW TG SETS


PROBLEM
HIGH HP FRONT SHAFT AND BEARING PEDESTAL VIBRATION

OBSERVATIONS
(A) FREQUENCY ANALYSIS CARRIED OUT WHICH INDICATED
PREDOMINANT 1-X VIBRATION COMPONENTS FOR BOTH SHAFT AND
BEARING PEDESTAL VIBRATION

STEADY PHASE ANGLE

(B) BEARING PEDESTAL VIBRATIONS AND SHAFT VIBRATIONS WERE


HAVING RISING TENDENCY AT RATED SPEED HOWEVER, THEIR RATIO
WAS FOUND TO BE ALMOST CONSTANT

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 500 MW TG SETS


ANALYSIS
PREDOMINANT 1-X VIBRATION WITH SLIGHT CHANGE IN PHASE
ANGLE INDICATED THERE WAS UNBALANCE IN THE ROTOR SYSTEM
LEADING TO INITIATION OF MINOR RUB

MAIN SOURCE OF VIBRATION WAS HIGHER DYNAMIC LOADING FROM


THE SHAFT WHICH WAS GETTING TRANSMITTED TO BEARING

ACTION TAKEN
• TO REDUCE THE HP FRONT SHAFT VIBRATION LEVEL, INSITU
BALANCING WAS CARRIED OUT USING LP ROTOR BALANCING PLANES

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 500 MW TG SETS


RESULT OF INSITU BALANCING
HP SHAFT VIBRATION BROUGHT DOWN TO STEADY VALUE OF 120
MICRONS, 0-PK FROM EARLIER VALUE OF 150 - 200 MICRONS, 0-PK

HP FRONT BEARING VIBRATION CAME DOWN INITIALLY TO 15


MICRONS, 0-PK AT 3000 RPM FROM EARLIER VALUE OF 25 – 40
MICRONS, 0-PK

LATER, WITHIN 2-3 HOURS OF OPERATION, HP FRONT BEARING


VIBRATION INCREASED BEYOND ALARM VALUE (35 MICRONS, 0-PK).
DURING THIS PERIOD, NO INCREASE IN SHAFT VIBRATION WAS
OBSERVED

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 500 MW TG SETS


INTREPRETATION OF RESULTS AFTER INSITU BALANCING
AS HP FRONT BEARING PEDESTAL VIBRATION INCREASED, EVEN
WHEN HP FRONT SHAFT VIBRATION WAS CONSTANT, INDICATED THAT
THE CAUSE OF HIGH BEARING PEDESTAL VIBRATION WAS SOME
FACTORS APART FROM UNBALANCE OF THE SHAFT

ANALYSIS DONE
• BASED UPON THE VIBRATION BEHAVIOUR OF BEARING PEDESTAL AND
SHAFT VIBRATION, IT WAS DECIDED TO SCAN FRONT BEARING
PEDESTAL BY PORTABLE VIBRATION ANALYSER

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 500 MW TG SETS


RESULTS OF SCANNING OF FRONT PEDESTAL
VIBRATION ON LEFT AND RIGHT HAND SIDE OF FRONT BEARING
PEDESTAL (NEAR HP CASING FRONT PALMS) IN THE VERTICAL
DIRECTION WERE HAVING LARGE VARIATION
(LHS VIBRATION IS ABOUT 5 TIMES MORE THAN RHS VIBRATION)

HP CASING PALM VIBRATION AMPLITUDE IN VERTICAL DIRECTION ON


LEFT AND RIGHT PALM WAS FOUND TO BE OF LOWER MAGNITUDE
AND SAME

SCANNING INDICATED THAT THERE WAS NO PROBLEM WITH BASE


PLATE, SECONDARY GROUT & FOUNDATION MATING SURFACES

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HP CASING PAM
(RIGHT HAND
SIDE)

HP FRONT BEARING PEDESTAL

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 500 MW TG SETS


ANALYSIS
SCANNING DATA INDICATED THAT LOAD DISTRIBUTION BETWEEN
PALMS OF HP CASING WAS NOT PROPER

THERE WAS GAP BETWEEN CASING PALM AND PEDESTAL ON LEFT


HAND SIDE

ACTION TAKEN
• 0.15 MM SHIM WAS ADDED BELOW LEFT HAND SIDE PALM WHEREAS
0.1 MM SHIM WAS REMOVED FROM RIGHT HAND SIDE PALM FOR
IMPROVING THE LOADING PATTERN OF HP CASING ON PEDESTAL

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)
HIGH VIBRATION IN 500 MW TG SETS
RESULT OF CORRECTION IN SHIMS
VIBRATIONS ON BEARING PEDESTAL REDUCED FROM 35 MICRONS, 0-
PK TO 15 MICRONS, 0-PK AND NO INCREASING TENDENCY WAS
OBSERVED

HP FRONT SHAFT VIBRATION WAS FOUND TO BE REDUCED FROM 120


MICRONS, 0-PK TO 90 MICRONS, 0-PK AND BEARING VIBRATION
SETTLED DOWN TO 10 MICRONS, 0-PK AT FULL LOAD

RATIO OF LEFT AND RIGHT HAND SIDE VIBRATION ON FRONT


PEDESTAL IN VERTICAL DIRECTION CAME DOWN TO 2:1 FROM
EARLIER VALUE OF 5:1
HENCE, UNBALANCE OF ROTOR SYSTEM & UNLOADING OF
LEFT SIDE PALM WAS FOUND TO BE THE ROOT CAUSE OF THE
HIGH HP FRONT SHAFT AND BEARING PEDESTAL VIBRATION
BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA
A.K.SINHA, DGM (TURBINE)

CONCLUSION
VIBRATION SCANNING IS A VERY
IMPORTANT TOOL FOR DIAGNOSTICS
PURPOSES

VIBRATION SCANNING SHOULD BE USED AS


FREQUENTLY AS POSSIBLE

IT HELPS IN RULING OUT OR PIN POINTING


CERTAIN DEFECTS
BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA
A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN
210 MW TG SETS

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 210 MW TG SETS


BACKGROUND
 MACHINE IS OF KWU DESIGN STEAM TURBINE COUPLED WITH LMW
GENERATOR (LP REAR BEARING AND GENERATOR FRONT BEARING IS
LOCATED IN COMMON PEDESTAL)

 VIBRATION BEHAVIOUR WAS FOUND TO BE NORMAL DURING FIRST


COMMISSIONING ON ALL BEARINGS AND LATER ON VIBRATION ON
BEARING NO. 4 / 5 PEDESTAL DETERIORATED GRADUALLY BEYOND
ALARM LEVELS (35 MICRONS, 0-PK)

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 210 MW TG SETS

PROBLEM
 HIGH LP REAR BEARING VIBRATION
 HIGH GENERATOR FRONT BEARING VIBRATION

OBSERVATIONS
FREQUENCY ANALYSIS CARRIED OUT WHICH INDICATED
 PREDOMINANT 1-X VIBRATION COMPONENT FOR BOTH LP REAR AND
GENERATOR FRONT VERTICAL AND AXIAL VIBRATION

 VERTICAL VIBRATION AT LP REAR AND GENERATOR FRONT BEARING


WAS OF THE ORDER OF 100 MICRONS, PK-PK

 AXIAL VIBRATION WAS ABOUT 200 MICRONS, PK-PK FOR BOTH LP


REAR BEARING AND GENERATOR FRONT BEARING
BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA
A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 210 MW TG SETS


ANALYSIS
BASED ON VIBRATION SYMPTOMS, FOLLOWING CHECKS WERE
SUGGESTED IN PLANNED OVERHAUL

LP / GENERATOR ALIGNMENT


BEARING ASSEMBLY CHECKS

RESULT OF ABOVE WORKS


AFTER CARRYING OUT THE ABOVE MENTIONED CHECKS &
CORRECTIONS DURING PLANNED OVERHAUL, VIBRATION LEVEL DID
NOT IMPROVE

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 210 MW TG SETS


ACTION TAKEN
FOLLOWING WORKS WERE CARRIED OUT
 VIBRATION ANALYSIS
 SCANNING OF LP REAR BEARING PEDESTAL AND ITS SECONDARY
GROUT AND BASE PLATE AREA

OBSERVATIONS / ANALYSIS
• FREQUENCY BEHAVIOUR OF BEARING VIBRATION FOUND SIMILAR TO
EARLIER OBSERVATION

• WIDE DIFFERENCE IN PHASE ANGLE IN VERTICAL DIRECTION


ACROSS BASE PLATE OF LP REAR PEDESTAL AND SECONDARY
GROUTING WHICH INDICATED THAT VERTICAL LOAD TRANSFER
FROM BEARING TO FOUNDATION IS NOT AS EXPECTED

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

SCANNING OF PEDESTAL
3
2
1
9
6
8
5
7 4 GENERATOR SIDE
BASE PLATE
D B
LEFT
15 11 12
21 C 14 A 10
RIGHT
20 13 18
19 17
16
SECONDARY GROUT

TURBINE SIDE

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 210 MW TG SETS


ACTION PLAN SUGGESTED
 REGROUTING OF LP REAR PEDESTAL
 REPLACEMENT OF FOUNDATION BOLTS OF LP REAR PEDESTAL AND
PROPER MATCHING OF ANCHOR PLATES
 IN-SITU BALANCING OF GENERATOR ROTOR TO REDUCE EXCITATION
FORCES TO MINIMUM

DUE TO TIME CONSTRAINT AND POWER REQUIREMENT,


FOLLOWING WORKS CARRIED OUT
• EPOXY GROUTING (PRESSURE GROUTING) OF LP REAR PEDESTAL
• RESTRETCHING OF FOUNDATION BOLTS OF LP REAR PEDESTAL
• LP / GENERATOR REALIGNMENT
• BEARING INSPECTION

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 210 MW TG SETS


RESULT OF ABOVE WORKS
AFTER CARRING OUT THE ABOVE MENTIONED CHECKS DURING NEXT
OVERHAUL
VIBRATION LEVEL FOUND REDUCED TO 25 MICRONS, 0-PK ON
BEARING NO. 4 / 5 PEDESTAL
 PHASE DIFFERENCE WAS FOUND TO BE MINIMUM BETWEEN BEARING
PEDESTAL BASE PLATE AND SECONDARY GROUTING

BUT AFTER FEW DAYS OF OPERATION,


• VIBRATION LEVEL STARTED INCREASING GRADUALLY AND TOUCHED
ALARM VALUE OF 35 MICRONS, 0-PK
• PHASE ANGLE DIFFERENCE WAS ALSO FOUND TO BE INCREASING
BETWEEN BASE PLATE AND SECONDARY GROUTING

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 210 MW TG SETS


ANALYSIS
EPOXY GROUTING WAS INSUFFICIENT TO CURE THE VIBRATION
PROBLEM ON PERMANENT BASIS

AT THIS POINT OF TIME, CIVIL EXPERT ALSO CONDUCTED STUDIES ON


FOUNDATION WHICH CONFIRMED THE BAD CONDITION OF
SECONDARY GROUT

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 210 MW TG SETS


ACTION PLAN SUGGESTED:
ONCE AGAIN THE PREVIOUS ACTION PLAN WAS SUGGESTED, THAT IS,
REMOVAL OF LP REAR BEARING PEDESTAL AFTER BREAKING
SECONDARY GROUTING COMPLETELY

REPLACEMENT OF FOUNDATION BOLTS

IN-SITU BALACNING OF GENERATOR ROTOR

DISMANTLING OBSERVATION
• DURING REMOVAL OF LP REAR PEDESTAL, SECONDARY GROUT
MATERIAL WAS FOUND IN PIECES

• OIL SEEPAGE WAS OBSERVED UNDER PEDESTAL

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

HIGH VIBRATION IN 210 MW TG SETS


RESULT OF ABOVE WORKS
 AFTER THE ABOVE MENTIONED WORKS CARRIED OUT (INCLUDING
IN-SITU BALANCING OF GENERATOR ROTOR) IN THE NEXT PLANNED
OVERHAUL, VIBRATION LEVEL OF LP REAR AND GENERATOR FRONT
IMPROVED IN BOTH VERTICAL AND AXIAL DIRECTION

 MACHINE IS RUNNING SATISFACTORILY SINCE THEN

HENCE, LOOSENESS / VOID BETWEEN LP REAR PEDESTAL AND


SECONDARY GROUTING WAS FOUND TO BE THE ROOT CAUSE
OF HIGH LP REAR PEDESTAL AND GENERATOR FRONT
VIBRATION

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

CONCLUSION
HISTORY OF THE PROBLEM SHOULD BE GIVEN DUE
WEIGHTAGE FOR ANALYSING THE PROBLEM

ATTENTION SHOULD BE PAID TO INTERFACE AREAS BETWEEN


MACHINE AND SUPPORTING SYSTEM / STRUCTURE IN
ADDITION TO MAIN MACHINE

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

TIPS FOR BETTER DIAGNOSTICS


HISTORY OF MACHINE WITH RESPECT TO ITS DYNAMIC
BEHAVIOUR SHOULD BE STUDIED

REGULAR VIBRATION READING ON BEARING PEDESTAL AT


PRESCRIBED LOCATIONS SHOULD BE TAKEN FOR ASSESSING
THE TREND OF VIBRATION BEHAVIOUR ACCURATELY

SHAFT VIBRATION IN TWO ORTHOGONAL DIRECTIONS


SHOULD BE MEASURED FOR ORBIT ANALYSIS

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)
RECOMMENDED LOCATIONS OF VIBRATION MEASUREMENTS ON
BEARINGS AS PER ISO

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

RECOMMENDED LOCATIONS OF SHAFT VIBRATION


MEASUREMENTS AS PER ISO

Measuring Measuring
Amplifier Amplifier

PROXIMITY
45O PICK-UP
45O
VERTICAL

L R L R
SHAFT OR SHAFT HORIZONTAL

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

TIPS FOR BETTER DIAGNOSTICS


EVERY UNIT SHOULD HAVE KEY PHASOR ARRANGEMENT FOR
VIBRATION ANALYSIS.

SCANNING OF VIBRATION PRONE AREAS INCLUDING SYSTEM /


FOUNDATION AROUND THE PROBLEMATIC AREA SHOULD BE
CONDUCTED

DEVIATION IN OPERATING PARAMETERS SHOULD BE


RECORDED AND ANALYSED FOR THEIR EFFECT ON VIBRATION
BEHAVIOUR

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

TIPS FOR BETTER DIAGNOSTICS


RUN UP & RUN DOWN VIBRATION BEHAVIOUR SHOULD BE
RECORDED FOR ALL BEARINGS AND SHAFT POSITIONS FOR
REFERENCE WHICH CAN BE USED DURING TROUBLESHOOTING

PRE-OUTAGE SURVEY SHOULD BE CONDUCTED PRIOR TO


OVERHAUL FOR BETTER PLANNING OF ADDITIONAL
ACTIVITIES / SPARES, IF REQUIRED

RECORD OF PREVIOUS BALANCING AT SITE SHOULD BE


MAINTAINED FOR REFERENCE PURPOSES

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

TIPS FOR BETTER DIAGNOSTICS

LAST BUT NOT THE LEAST, DURING TROUBLESHOOTING,


EVERY FEEDBACK / OBSERVATION NEEDS TO BE CONFIRMED.
IF EVERYTHING IS ALRIGHT, VIBRATION PROBLEM WOULD
NOT HAVE BEEN THERE. SO VERIFY EACH & EVERY
POSSIBILITY AND CONFIRM FROM WRITTEN DOCUMENTS

BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA


A.K.SINHA, DGM (TURBINE)

Thank you