Project
Brief Overview
Dt:20.01.2019
Project Authority
National High Speed Rail Corporation Limited
(A Joint Venture of Govt. of India, Govt. of Maharashtra and Govt. of Gujrat)
Overview of MAHSR Project and NHSRCL
o The project started in 2012 with initial discussions between Govt. of India
and Govt. of Japan. Prefeasibility was drawn by 2013.
2
Overview of MAHSR Project and NHSRCL
o On 14th September 2017, the Hon. Prime Minister of India, Mr. Narendra
Modi and Hon. Prime Minister of Japan, Mr. Shinzo Abe laid the foundation
stone for the first High Speed project between Mumbai and Ahmedabad
3
Project Benefits
oReduction in travel time between Mumbai and Ahmedabad from 6.5 hrs
to 2 hrs.
4
Project Summary Project Component Description
Total Length 508.17 km
Project Cost INR 1.08 Lakh Crores
Funding Agency JICA & MoR, and State
Governments
No . of Stations 12
Total Land Requirement 1415.75 Ha.
Right of Way (RoW) 17.5 m
Tunnels 8 totaling 25.48 km
Longest Tunnel 21 km
Elevated Viaduct 476.3 km
Tunnel Construction TBM & NATM
Technology
Railway Crossings 25 locations
Maintenance Depots 7
Rolling Stock Depots 2 - Thane and Sabarmati.
Construction Yards At every 25 km
Track Gauge 1,435 mm
Maximum Design Speed 350 km/hr
Maximum Operation Speed 320 km/hr
Number of Lines Double Track
Distance between Track 4.5 m
Centreline 5
Interstation Timings of MAHSR
6
Train Operation Plan in 2023, 2033, 2043 and 2053
Year 2023 2033 2043 2053
Train configuration 10 10.16 16 16
Traffic Volume 17,900 31,700 56,800 92,900
(person/day/direction)
Number of trains 35 51 64 105
(day/direction)
Number of Trains Peak Hour: Peak Hour: Peak Hour: Peak Hour:
(Train/hour/direction) About 3 About 3 About 3 About 3
Peak Hour Off Peak: Off Peak: Off Peak: Off Peak:
Off Peak About 2 About 2 About 2 About 2
7
MAHSR Alignment: Sanjay Gandhi National Park &
Tungreshwar Wild Life Sanctuary
8
MAHSR Alignment: TCFS
9
Thanks