Академический Документы
Профессиональный Документы
Культура Документы
Objective:
• Owners, architects, and designers must be specific about the
needs efficiently.
Construction Specifications
• Also known as specs that detail the work and workmanship needed
to complete a construction project.
• The specs discussed between the project owner and the contractor
become a part of the legal documents for the project.
Types of Construction Specifications
Prescriptive Specifications
• Focus on the details for the types of materials used and the
installation of said materials. Architects or engineers tend to take over
the job of project design in prescriptive specs.
• Used when you need to use a single type of product for any kind of
installation. These are the least common of the three types of
construction specifications, but they are for jobs involving existing
equipment and already completed installations.
REMINDER: Be as Specific as Possible
• The more time you spend detailing each step of the project, the more
likely your vision for the project will be executed accurately.
Who Handles Construction Specs?
• Contractor
• Purchasing agent
• Inspector
• Owner
• Subcontractors
• Materials and equipment manufacturers
Specifications include:
• Bidding Requirements
- Invitation to Bid
-Instructions to Bidders
-Information Available to Bidders
• Sample forms
• Agreement
• Bid form
• Bid bond
• Performance and Payment Bonds
• Other sample forms
Specifications include:
• Schedule of Drawings
• Technical Specifications
General Conditions
relationships of the parties to the cotract. The parties are the owner,