DIFFERENCES BETWEEN BESMM 3 & 4

NIQS BESMM 4 TRAINING WORKSHOP


6-7th APRIL, 2016
COMPARISON of measurement documents

BESMM3 & CESMM3 CESMM4 & BESMM 4

 Adopted the format of SMM7  Integration of NRM 2 and


of 9 columns CESMM 4 but retained the 9
columns in BESMM 3
 Work sections retained same
 Work sections identified
identity in both building and separately for both building/civil,
Civil/Industrial Engineering eg industrial engineering e.g 2A-2Z;
D- Groundwork, E- Concrete work 2AA-2AB; 2F-2H concrete
 Adopts CESMM4 for
civil/industrial engineering works
Metalwork/timber

2N-Structural metalwork/miscellaneous
G-Metalwork/Timberwork Metalwork

 Miscellaneous metalwork,  Extensive integration of CESMM 4


(current)
scaffolding structural
 Structural metalwork/ miscellaneous
metalwork, timber, all lumped metalwork together
together under the above  Fabrication as members (main
Bridges, subsidiary and framing)
 Bridge bearing materials-
Elastometric and propriety added.
 Bridge bearing 6 items
differentiated.
Piles

BESMM 3: D75- PILES AND


PILING ANCILLARIES BESMM 4: 2R- PILES

 Measurement to Rule D30  Rearranged; Piles (2R)now


separated from their ancillaries (2S)
(building work section)
 Nominal cross sectional area given in
 Piles and its ancillaries lumped 8 stages
together  Isolated piles Mass/m given in 8
stages
 Interlocking steel piles section
modulus given in 8 stages
 Stone Columns provided (to be
measured) and in 8 stages
Roads and pavings

BESMM 3 Q45 BESMM 4 2T

 6 Classifications  9 Classifications
 Un-bound sub-base- further
 Sub-base, flexible road bases & classified into 4 types; depth
surfacing (depth to be given in 8 stages
stated….not given)  Cement and other hydraulically
bound pavement classified into
8 stages
 Cement bound granular mixture,
fly as bound mixture, etc. depth
given in 8 stages
Road and Pavings (Cont’d)

BESMM 3 Q45 BESMM 4 2T


 Concrete pavements further
 Concrete pavements-carriage classified into 10 types;
way slabs. Depth, thickness to unreinforced concrete surface
be stated. slabs, jointed reinforced,
continuously reinforced.
 Nominal mass, to be stated Depth/thickness groupings
 Mass of bar reinforcement given in 8 stages
taken at 7.85t/m3 (nominal size
of members no given  Mass of bar reinforcement
taken at 7.85t/m3 and nominal
sizes given in 8 stages (6mm-
32mm diameter)
Road and Pavings (Cont’d)

BESMM 3 Q45 BESMM 4 2T

 Waterproof membranes below  Separation and waterproof


concrete pavement membranes
 Item description to state the  Item description to state their
gauge and extent of laps. materials and thickness.
 Joints in concrete pavements;  Joints in concrete pavements;
depth of joints to be stated in depth in groups given in 8
mm (not stated) stages.
Road and Pavings (Cont’d)

BESMM 4 2T
BESMM 3 Q45
 Kerbs, Channels and edging  Kerbs, Channels, edgings,
classified into 6 items footways and paved areas
classified into 10 items with
addition of item 7-10
 Ancillaries, surface markings-5  Ancillaries; surface markings-6
items noticed including non items including Non reflective
reflective studs and reflective road studs; reflective road
studs studs and Raised rib
Railway Track Construction

X 40 BESMM 3 2U BESMM4

 Track bases/foundation; 5  Track/foundations; 8 items


items noticed additional 3 items
included (Ballast cleaning;
tampering and Pneumatic
ballast
 Taking up sundries; 6 items
 Taking up sundries: 7 items
noticed- additional item is
Eutectic strip.
Railway Track Construction (Cont’d)

X 40 BESMM 3 2U BESMM4
 Lifting packing and slewing; 5  Lifting, packing and slewing
items and work to existing track; 6
items evolved.
 Additional items include
-existing rail turning and
fixing.
-re-railing
-stressing rail
Railway Track Construction (Cont’d)

X 40 BESMM 3 2U BESMM4
 Additional information
 Plane tract
 Plane track with conductor
 Plane track with turnout
 Plane track with conductor rail
and
 Buffer stops
Piling ancillaries

D 75 BESMM 3 2S BESMM 4

 Group together. Measured  Each of the measured work


work items pre-boring, has 7 or 8 items of piles
extensions, cutting off tops, ancillaries to be measured.
etc. including disposal, delays These exclude disposal and
delays. Disposal is deemed to
be included with the piling
works.
Piling ancillaries

D 75 BESMM 3 2S BESMM 4

 The cross sectional area, mass,  The cross sectional area, mass,
sectional modulus etc. were sectional modulus etc. their
not given or specify range were given or specify
 Pile test did not provide for  Pile test provide 5 types of test
type of test to be done to be carried
Thank you