Tamplet for making Action plan for identified villages

under IWMP programme by PG student of IIM, Indore


under Rural Engagement Programme (REP)
Name of Village ..............................
1. Baseline Data
1.1 General Information :- (Area in Hectare)
Name Gram- Block District Total
of Panchayat Geographical
Village Area of Village
Baseline Data
1.2 Land Ownership :- (Area in Hectare)
Forest Govt. Revenue / Community Private Other Total
Land land

1.3 Land Use:- (Area in Hectare)


Status of Agricultural land Wasteland (including Other Total
Govt, community and area
private)
Rain fed Irrigated Irrigated Total Current Permanent
( only by (by dug fellow fellow
canals & well &
tanks) Tap)
1.4 Details of Land Owners:-

Details of families based on land ownership Landless Total no.


families of
Marginal Small Mediu Large Total families
m families residing
in village
1.5 Details of Cultivable land:-

(Area in Hectare)
Crop season Name of Area Irrigated Unirrigated Total
the crop (Hectare) (Hectare) (Hectare) (Hectare)

Kharif

Rabi

Zayad
(Summer
Crop)
1.6 Cropping Method:-

Total Single Crop Double crop Multiple crop


Agricultural
Land
2. Demographic details
2.1 Category wise details of families :-
Schedule caste Schedule Other General Total families
d tribe backward residing in
class village

2.2 Social Status :-


BPL families APL families Total families
2. Demographic details
2.3 Category wise demographic details :-
Male Female Total
SC ST OBC Gen. SC ST OBC Gen. SC ST OBC Gen.
3. Main source of family income
S. Type of No. of families Average
no Livelihood with livelihood income/family/ye
activities ar
1

4
4 Details of facilities(Infrastructure)
available in village
S.no Available infrastructure Yes/no
1 School building
2 Panchayat Bhawan
3 Anganwadi Bhawan
4 SHG/Community Building
5 Primary Health Center
6 CC Road
7 Bank
8 Post Office
9 Primary cooperative committee
10 Hat Bazar
11 Tilets Personal / community
12 Other
5 Main Problems of village
1. ...................................................................................................................

2. ...................................................................................................................

3. ...................................................................................................................

4. ...................................................................................................................

5. ...................................................................................................................

6. ...................................................................................................................

7. ...................................................................................................................

8. .................................................................................................................
6.Water Budget of Village :-
1 Total geographical area of village :- .......................... hectare
2 Average rainfall during last 10 years in the village :- ................... meter
3 Total amount of rain water available in
the village (1 X 2) :- ...................... hectare meter
4 Value of runoff coefficient :- 0.06
5 Total runoff in the village (3 x 4) :- ........................ hectare meter
6 Water impounding capacity in pre existing
structures in the village :- ...................... hectare meter
7 Balance runoff (4 - 5) :- ...................... hectare meter
8 Runoff prevented by proposed works/structures :- ...................... hectare meter
9 Un-prevented runoff (6 - 7) :- ...................... hectare meter
10 Water need in the village :-
Human ------------------
Livestock ------------------
Agriculture ------------------
Rabi crops ------------------
Zayad (summer )crops ------------------
Total water need ______________________-
7. Details of proposed watershed development work based on Participatory net planning :-

S.no Owner- Area of If Use of surveyed land Main Proposed watershed development Tenta Expect
ship of survey private (Hectare) problems work tive ed
surveyed ed land land (Soil Budg Outco
land(fore then Agricultural Non erosion/s Soil and Surface Vegetative et me
st/ give land agricultural carcity of water water/Gro measures
Govt/priv name land irrigation conserv und water
ate) of land facility or ation conservat
owner any other) ion
Irrig Un- Fellow Oth
ated irrigate land er
d

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Total
8 Consolidated action plan of proposed watershed development work :-
S. Main work Activities Unit Total Quantity / Total
no areas Nos Expenditure
1 Soil 1 Staggered contour trench Hectare
conservatio 2 Continuous contour trench Hectare
n and 3 Farm bunding Hectare
moisture 4 Loose bolder check Nos
conservatio 5 Gabian structure Nos
n 6CPT Run Mt
7 Contour bolder wall Hectare
8 Other
2 Surface 1 Earthen and bolder nala check Nos
water 2 Check dam /stopdam Nos
conservatio 3 Farm pond Nos
n and 4Tank Nos
Ground 5 Percolation tank Nos
water 6 Bori bandhan Nos
conservatio 7 Percolation pit Nos
n
3 Vegetative 1 Horticulture development Hectare
Developme 2 Plantation/afforestation other then Hectare
nt horticulture
3 Fodder Development Hectare
4 Plantation on farm bund Hectare
Total watershed development works