ASSIGNMENT NO 1
STRUCTURAL DESIGN OF A BUILDING
BATCH NO 3
CE18M020 Vichin C
CE18M064 Anujith K Babu
CE18M075 Dipesh Sharma
DESCRIPTION OF BUILDING
An RCC building with 6 storeys above the ground level and 2 basement storey.
a. DIMENSIONS:
Plan
• Basement Storeys - 30m x21m x 3m
• Ground Floor - 30m x14m x 4m
• Upper Storeys (No :2 to 6) - 30m x14m x 3m
DESCRIPTION OF BUILDING cont…
a. SOIL REPORT
DESIRABLE ATTRIBUTES
• Robust Structural Configuration
• Atleast a minimum elastic lateral stiffness
• Atleast a minimum lateral strength
• Adequate Ductility
LOADS: DEAD LOADS (IS 875:1987-Part1)
Item Weight in kN/m3
Reinforced Cement Concrete
With 1% steel 22.75 to 24.20
With 2% steel 23.25 to 24.80
With 5% steel 24.80 to 26.50
ANALYSIS
Static gravity load and Lateral loads due to Earthquake/Wind loads and its combinations.
Superstructure : ETABS 18.0.1
Substructure : SAFE 2016
ANALYSIS : ASSUMPTIONS
• Modelled as 3D space members and analysed using ETABS
• Mass and mass moment of inertia lumped at center of mass
• Fixed at the base since raft footing is assumed
• Slab and walls are modelled as shell elements
• All beams and columns are modelled as line elements
• Rigid diaphragm is used in each floor
• Special Moment Resisting frames with ductile shear wall
• Accidental eccentricity is considered in the analysis for earthquakes
• Angle of internal friction for soil is assumed as 300
• Infill walls are not considered in the analysis.
• Line Load corresponding to 230mm thick brick wall is applied on main
beams
ANALYSIS : DESIGN ASSUMPTIONS
1.2DL + 1.2SDL +
WIND COMBINATION 1 Linear
1.2LL1+1.2LL2+1.2WLX
1.2DL + 1.2SDL + 1.2LL1+1.2LL2-
WIND COMBINATION 2 Linear
1.2WLX
1.2DL + 1.2SDL +
WIND COMBINATION 3 Linear
1.2LL1+1.2LL2+1.2WLY
1.2DL + 1.2SDL + 1.2LL1+1.2LL2-
WIND COMBINATION 4 Linear
1.2WLY
WIND COMBINATION 5 1.5DL + 1.5SDL +1.5WLX Linear
RSX RSY
ANALYSIS: STOREY DRIFT
ELX drift (mm) ELY drift (mm) RSX drift (mm) RSY drift (mm)
STOREY
ELX ELY
ANALYSIS: STOREY SHEAR
ELX drift (kN) ELY drift (kN) RSX drift (kN) RSY drift (kN)
STOREY
RSX RSY
WINDPRESSURE
IS 875:2015-Part3
DESIGN WIND SPEED
In X direction
Cf = 1.19, Pd = 1339.54 N/m2, b = 21 m, a = 25m , h=19m
F = Cf * Pd * Ae
= 1.18*1339.54*21*19
= 630.68 kN
In Y direction
Cf = 1.23, Pd = 1339.54 N/m2, b = 25 m, a = 21m , h=19m
F = Cf * Pd * Ae
= 1.23*1339.54*25*19
= 782.63 kN
WIND LOAD: Lateral Load on each storey
EARTHQUAKE LOAD
Hand calculation based on Approximate
IS 1893:2016
Seismic Weight
ANNEX E Seismic Zone = III
𝟎. 𝟎𝟗𝒉
Table -1 Type of Soil = Type A:Rock or Hard Soil soil 𝑻𝒂 =
√𝒅
Table-2 Zone factor (Z) = 0.16 𝟎. 𝟎𝟗 ∗ 𝟏𝟗
𝑻𝒂 = = 𝟎. 𝟒𝟔 𝒔𝒆𝒄𝒐𝒏𝒅𝒔
Table-7 Response Reduction Factor (R) = 5.0 √𝟏𝟒
𝑺𝒂
Importance Factor = 1.20 •
𝒈
= 𝟐. 𝟓
Height of building (H) = 19.0m 𝒁 𝑺𝒂
𝟐𝒈
Base Dimension : 𝑨𝒉 =
𝑹
𝑰
Length( along the direction of earthquake) = 14m
Ah= 0.048
Breadth = 30m
Design Lateral Force VB = AhW
Fundamental Natural Period (T) is calculated for individual units as per
base dimensions and height of structure with reference to IS: 1893- W = 31700 kN
2016(cl:7.6.2) VB = 1521.6 kN
ETABS : 1200 kN
Hand Calculation : 1520 kN
Earthquake Load : DESIGN LATERAL FORCE
RSX RSY
Modal Participating Mass Ratios
Case Mode Period UX UY UZ
P1 M33 P1 S22
MEMBER FORCE on PIER 1 (Envelope case)
Support Section :
Provide :
d’= 38mm Ast2 = 795 mm2
At top : 3-20φ + 3-25φ
d’/d = 0.08 Asc = 889 mm2
At bottom : 3-25φ
Design BM = 423 KNm Provide :
Esc = 0.00289 At bottom : 3-20φ +3-25φ
At mid span:
Fsc = 402.8 N/mm2 At top : 3-20φ
Design BM = 357 KNm
Ast1 = Mu,lim/(0.87*fy*(d-0.412*xu,lim)
Esc = 0.00285
Ast2 = (Mu-Mu,lim)/(0.97*fy*(d-d’)) Check for Shear :
Fsc = 402.8 N/mm2
Ast1 = 1622.38 mm2 Vu = 301 KN
Ast1 = 1622.38 mm2
Ast2 = 795 mm2 ß = 0.8fck/(6.39Pb)= 2.05
Tv = 2.11 N/mm2
Tc = 1.15 N/mm2
Tc,max = 3.64 N/mm2
Design of Beams for flexure and shear (cont.)
(Tv – Tc) *b*d = (2.11-1.15)*300*475 = 136.8 KN = Vds
Spacing : Sv = 0.87fy*Ast*d/(Vds) = 120 mm
Reinforcement at section 2 due
to hogging moment =353
Provided Ast = 2417 mm2 kNm Mulim/bd2 = 3.45
As per IS 13920 top and bottom reinforcement shall consist of atleast Mulim = 3.45 x 250 x 4572
2 bars throughout the member length (cl 6.2.1) - OK = 180 kNm
Min tension steel ratio = 𝜌 min = 0 . 24 �𝑓𝑐𝑘/𝑓𝑦 = 0.587 Actual moment is greater than
Given =1.67 Hence OK Mulim ,so the section is doubly
Max steel ratio at any section 𝜌max = 2.5 reinforced
Provided ast =
2417mm2
Provided asc = 889
mm2
Design of Beams for flexure and shear (cont.)
Shear reinforcement requirement
Min dia of hoop = 6mm if span < 5m else 8mm Shear force maximum of
Calculated factored shear force from load combinations = 136.8 kN
Shear force due to formation of plastic hinges at both ends of beam
At Left end
At section 2
Mulim(Hogging moment capacity) = 2417/ (250 X
Pt = 1546/(250X457) = 1.35%
457)
Pb = 628/(250X457) =.549%
= 628/ (250 X 457)
Mulim (Hogging moment capacity) Mulim (Sagging
= 0.87*fy*ast (d-fy*ast/fck*b) = 1.549(%)
moment capacity)
= 0.549(%)
V1(D+L) = V2(D+L) =0
=423kNm
.87*415*1546(457-415*1546/25*250)
Mulim(Sagging moment capacity)
= 95 kNm
=0.87*415*628(457-415*628/25*250) =
= 136kNm (1.2 (DL+LL) case) =
350kNm
136kNm
For sway to right
Vu,1 = 136 – 1.4(423+350)/5 =80.44kN
Vu,2 = 136 + 1.4(423+350)/5 =352.4kN
For sway to left
Vu,1 = 136 – 1.4(423+350)/5 =-80.44kN
Vu,2 = 136 + 1.4(423+350)/5 =-352.4kN
Pu/Puz = 0.88
Interpolating αn = 1
`` (Mu/Mux1)^ αn + (Muy/Muy1)^
αn = 126/300 + 31/300 = 0.52 <1
Design is O.K.
.Design of Column Confining reinforcement :
Design for Shear: length, lo = max (500, 450,
∆ = 1+ 3Pu/ Ag fck = = 1+ 3*1550* 10^3/ (500^2 4000/6) = 666 = 700 mm
* 40) = 1.456 Ash = max (0.18 * sv * D * fck /
Assuming 50% of steel provided, Ast = 1.58/2 = fy * (Ag/ Ak – 1) , 0.5 * sv * h * fck/y) =
0.79% max(510,240)
For M40, Tc = 0.65 = 510 mm2
∆*Tc = 0.9464 N/mm2 3* 50* x = 510 x = 3 - 4 , min 4
Shear strength = 0.9464 * 5002 = 236.6 kN > 70.82 links
kN safe 700/ n+1 = 700/5 = 140 mm
Mu/bd2 = 0.8136
Tv = V/bd = 0.2528
From moment:
Pt/100 = 30/2*500 * (1- (1 – 4.598* 0.8136/30)0.5 ) = 0.193 * 10-2
3 2987.4404
Column M40 1580.783 3731.76 0.4236
2 3019.8683
1 3389.3841 Beam M30 7398.74 3731.76 1.9826
-1 4092.0516
Wall M40 7675.858 3731.76 2.0569
-2 4337.6041
Floor M30 10872.87 3731.76 2.9136
Total ALL 27853.36 3731.76 7.4639
TOTAL WEIGHT OF CONCRETE USED=27853.36 KN