Output
40
30
Total production = No. of tasks completed (given)
20
Average production = Total production/No. of workers
Marginal production = {Total production with n workers – Total 10
production with n-1 workers}
0
1 2 3 4 5 6 7 8 9 10
-10
No. of workers
Sr.No. Stages of Building Construction Labor Capital Labour intensive? Capital intensive? Status
1 Choosing and buying the site Y
2 Designing the building Y
3 Buying, planning materials and labor Y Y 50% of the
4 Levelling the land Y project has
5 Drawing the layout of the building Y been
6 Excavation and laying the foundation Y completed
7 Erecting the frame of the building Y
8 Initial wiring Y
9 Putting the roof Y Potentially
10 Constructing the walls and interiors Y Potentially
11 Plastering of ceiling and walls Y Potentially
12 Plumbing and wiring Y
13 Finishing the inside walls and paintings Y
14 Installing fixtures Y
15 Flooring Y
16 Painting Y
17 Decorating and landscaping Y Y