RESEARCH QUESTIONS
1. Is there are any inconsistencies between the theories and practices of
extra over item in bill of quantities?
2. What are reasons for the inconsistencies that occur between the
theories and practices of extra over item in bill of quantities?
RESEARCH OBJECTIVES
1. To identify if there are any inconsistencies in the application of extra
over item in bill of quantities.
LIMITATION
• Lack resources of literature and past research.
• Finding respondent who would be willing to hold an interview.
RESEARCH METHODOLOGY
• Identifying Problems
• Comes up with aim,
objectives and • Thematic Analysis
question
• Literature Review
Data Data Analysis
Collection Report
Topic
Writing
• Qualitative
• Tools : Interview • Full 5 chapters of the
report
• Sampling Method :
Stratified Sampling /
Simple Random
Sampling
LITERATURE REVIEW
Definition Extra over (EO) - Designing Buildings Wiki, 2018
Standardization of BQ Akbar, Mohammad, Ahmad, et al., 2015 (SMM2 and MyCESMM supposed to be a compulsory
guidance in preparing a Bill of Quantities )
Perumal and Bakar (2011) (To ensure conformity) (By using the same standard, the process and
systems would be much easier to understand and can increase the productivity and efficiency of
the work itself )
Adnan et al., 2011 (allow for a better bidding, documentation and price control)
Problem A and J Rogers v Northern Ireland Housing Executive, 1998 (Meaning of Extra Over)
Akbar, Mohammad, Maisyam, et al., 2015 (not referring to SMM2 in preparing BQ)
Akbar, Mohammad, Ahmad, et al., 2015 (old issue but still exist to this day)
SMM
Different application of Extra Over
SMM2
Hanafiah, H. (2011) (tabulation of differences SMM and SMM2)
SMM2 Singapore
SMM Hong Kong 2001 Edition
CONCLUSION
• There is still lacks of understanding on what Extra Over item
actually is.
• The way to utilized and applying Extra Over item in BQ to actual
work.
• If everyone is actually using the same standard, the process and
systems would be much easier to understand and can increase the
productivity and efficiency of the work itself (Perumal and Bakar,
2011).
• Is the use of Extra Over Item relevant?