QUALITY CONTROL PROCEDURES
AND DOCUMENTATION
QUALITY CONTROL PROGRAM
Quality Control Program ( QCP)
B. Inspection:
Continuous quality control inspection on all Items of Works shall be
done as construction work progresses. Inspection Report to be submitted
as required.
Owner/Supplier :________________________________________________________________
Sampled/Cast By :________________________________________________________________
(Name of DPWH Authorized Representative) (Signature)
________________________________________________________________
(Designation) (Office) (Date)
Propose Use :________________________________________________________________
Test Desired :_________________________________________________________________
Governing Spec’s. :_________________________________________________________________
Shipped By :_________________________________________________________________
(Name & Designation) (Office) (Date)
Send Test Results to :________________________________________________________________________
Bill Charge To :________________________________________________________________
Submitted By : _________________________________________________________________
(Name & Designation) (Signature)
________________________________________________________________
SAMPLE CARD
Asphalt Overlay Along Roxas Boulevard, Manila
Project :______________________________________________________________
AOARB – EA - 1
Sample Identification :______________________________________________________________
40 tonnes
Quantity Represented:______________________________________________________________
Shipped By Nelson B. Canoy Lab. Tech. II BRS – DPWH April 20, 2012
:_______________________________________________________________
(Name & Designation) (Office) (Date)
REMARKS :________________________________________________________________
JUDY F. SESE
OIC – Bureau Director
TEST REPORTS
AND
LABORATORY WORKSHEETS
TEST REPORTS
• a documented proof that determined the quality of
materials
Example:
T. Urmaza
S. Orate CLARITA C. FLORES
J. Tagalo Engine e r V
J. B e rgonio
C. de la Cruz ATTESTED :
Witnessed by:
Const. Of 2 Storey RGR Type Sch. Bldg. At Dona Ma. Platon Laurel, Aya, Talisay, Bats.
Project : Const. Of Circumferential Road Around Lake Taal, Agoncillo, Bats.
Completion of Aya-Tranca-Talisay Road, Talisay, Bats.
Kind of material : Reinforcing Steel Bar ( 16 mm dia., deformed )
Sample identification : DMP- 5
Quantity represented : 10,000 kgs.
Sampled at : Stockpile at jobsite
Original source : Top Steel
Supplied by : Revere Construction & Supply
Proposed use : for concrete reinforcement
Spec's Item No. : PNS 49 Grade 275 NW
Sampled by : F. Opena,Lab. Tech. II DPWH-Bats. 3rd DEO 06-08-06
(Name & designation) (Office) (Date)
Submitted by : Ma. B. M. Marquez - do - 6-14-06
(Name & designation) (Office) (Date Received)
Lab. No. : 1718-06 ( Paid under OR No. 2595342 )
Witnessed by:
(Date)
TEST REPORT ON CONCRETE MASONRY UNITS
Project :
Construction of 2 Storey RGR Type Sch. Bldg. At Dona Ma. Platon Laurel, Aya, Talisay, Bats.
Type of Unit :
Concrete Hollow Blocks (Non Load Bearing) 4" thick
Quantity represented :
10,000 pcs.
Sampled at :
Stockpile at jobsite
Original source :
Allied
Supplied by :
REVERE Construction & Supply
Proposed use :
for walling
Spec's Item No. :
ASTM C-129 ( Non- Load Bearing )
Sampled by :
N. Magnaye Revere Cons't. & Supply 06-08-06
F. Opena,Lab. Tech. II DPWH-Bats. 3rd DEO 06-08-06
(Name & designation) (Office) (Date)
Submitted by : Ma. B. M. Marquez - do - 6-16-06
(Name & designation) (Office) (Date received)
Lab. No. : 1720- 06 ( Paid under OR No. 2595342 )
SAMPLE I.D. TESTS REQUIREMENTS RESULTS
T. Urmaza
A. Emperador CLARITA C. FLORES
J. Tagalo Engine e r V
J. Bergonio ATTESTED:
Witne s s e d by :
Project : Concreting of Road, Barangay II, San Carlos City, Negros Occidental
Sample identification : CRBII-01
Quantity represented : 2000 bags
Sampled at : Jobsite
Manufactured by : Taiheiyo Cement Phils., Inc., San Fernando, Cebu City
Brand : Grand Portland Cement
Supplied by : Kuntel Construction
Spec's Item No. : ASTM C-150
Sampled by : R.dela Cruz/J.Yanson DPWH-Neg. 1st EDO/Kuntel Const. 6-16-06
: (Name & designation) (Office) (Date)
Submitted by : N.A. Noble-Engr. III DPWH-Neg. 1st EDO Neg. Occ. 6-20-06
: (Name & designation) (Office) (Date received)
Lab. No. : 1741-06 (Paid under OR # 2595384)
TESTS REQUIREMENTS RESULTS
Magnesium Oxide (MgO), % 6.0 Max. 1.30
Sulfur Trioxide (SO 3), % 3.0 Max. 2.47
Loss on Ignition, % 3.0 Max. 4.70*
Insoluble Residue, % 0.75 Max. 1.10*
Air Content of Mortar, % 12.0 Max. -
Fineness : Amount Passing
No. 0.075 mm Sieve, % - 99
Autoclave Expansion, % 0.8 Max. 0.03
Time of Setting : Gilmore Test
Initial set, min. 60 Min. 120
Final set, min. 600 Max. 253
Compressive Strength, Avg. mortar
cubes, Mpa:
3 days 12.0 Min. 19.0
7 days 19.0 Min. 17.5
28 days 28.0 Min. 23.0
Specific Gravity - 3.09
REMARKS: * Sample fails to meet Specification requirements.
Tested by: Checked by:
P. Malonzo
B.A. Minano
E. Cruz CLARITA C. FLORES
E. Flores Engineer V
M. S. Gianan ATTESTED :
Witnessed by:
Proje ct :
Subic Port Development Project - SBMA
Kind and Clas s :
RCCP 750 mmØ Circular Class IV Wall B
Quantity re pre s e nte d :
50 pcs.
Sample d at :
Supermix Redi-Concrete Casting Yard
Original s ource :
Supermix Redi-Concrete
Propos e d us e :
Access Road
Spe c's Ite m No. :
ASTM C-76 M Class IV Wall B
Sample d by :
R. Benito-Engrs. Rep. PCI 10-23-04
(Name & de s ignation) (Office ) (Date )
Submitte d by : R. Testado- not stated A.M. Oreta & Co., Inc. 11-8-04
(Name & de s ignation) (Office ) (Date re ce ive d)
Lab. No. : 5990-04 (Paid under OR # 3708704)
CONTROL LOGBOOK
Control Logbook where the daily entries of activities
relative to sampling, testing, inspection and other
quality control activities/ comments in the project
accomplished by the concerned Materials Engineer is
called Materials Quality Control Logbook.