Академический Документы
Профессиональный Документы
Культура Документы
Sour Gas
37% H2S
10 % CO2
Objective
• ADCO drilled 3 appraisal wells to gather
information
• Making Decision to appoint Crew, tackle HSE,
Equipment Installation
AP-1 and AP-3 were drilled in crest to evaluate:
Fluid composition
Reservoir Quality
Productivity
Volume in Place
Water Production
Sweet Perched Water
Saline Edge Water
Saline Bottom Water
Appraisal Well Uncertainties Data Acquisition
Seismic
No. of Wells and well target
Horizon and Faults
Reservoir Modeling
Open Hole Logging
Gamma ray/Density/Neutron/Later logs along with sonic log (Pressure
Gradient)
NMR (Permeability Distribution)
Pressure Data (Zone Permeability)
These all are helpful in specially slanted wells
Coring
Determination of facies,
Porosity,
Permeability,
Initial Fluid Composition
FIT (Formation Integrity Test)
Down hole Sampling to determine Fluid Property (Test to ensure
well is properly cleaned up, stable flow period)
HC accounting and Reservoir Management (Water Saturation and
Gas Condensate)
Reservoir Pressure
Updating reservoir Pressure
Identification of Depletion Areas (Loss of containments)
Build-up Survey plan
Skin Remediation
Well testing
Monitoring Gas
Condensate
Water