Contents
Introduction of Company
Products manufactured
Alternator Current Generator
GMR Sensor
5S Principle
Introduction of Company
• The Mitsubishi company was founded by Yataro Iwasaki as a shipping firm
in 1870. The Mitsubishi Electric Corporation was founded in 1921, when
Mitsubishi Shipbuilding Co. (now Mitsubishi Heavy Industries, Ltd.) spun
off a factory in Kobe, Japan that made electric motors for ocean-going
vessels.
• It’s operation began in India in mid 1950s and has grown to become one of
the most highly regarded companies in India. It offers a wide range of
innovative and high-quality products for the Indian market, including Air
Conditioners, Visual Information Systems, Power Devices, Photovoltaic
(solar) Solutions, Power Systems, Transportation Systems and industrial
automation machinery.
• Mitsubishi Electric Automotive India Pvt. Ltd. plant is located in
IMT(Manesar) in 21600 m2 area. It employs nearly 500 people.
• Current M.D. of the company is Mr. Yoshito Inaya.
• Basically, the plant is concerned with manufacturing and assembly process for electronic parts to
cater various automobile needs and demands.
• The plant is divided into various departments:-
Human
Quality Information Sales &
Production Maintenance Resource & Finance
Assurance Technology Marketing
Admin
Products Manufactured
•Alternator Current Generator: -
Alternators are like A.C. generators
used in automobiles to charge its
battery while the engine is running.
Workstations are places in an assembly line where the parts are added in sequence until
the final assembly is produced. By mechanically moving the parts to the assembly work
and moving the semi-finished assembly from work station to work station, a finished
product can be assembled faster and with less labor than by having workers carry parts to
a stationary piece for assembly.
For alternator assembly line these can be summarized into following categories :-
• Press fit machines
• Nut and bolt tightening machines
• Friction check machine
• TIG welding machine
Bearing holder and Bearing is press
Bushes are press Retainer is fitted to
bearing is press fitted to the back Regulator assembly
fitted into rear hold the bearing in
fitted into front end of rotor is prepared.
bracket. front bracket.
bracket. assembly.
Final inspection is
Noise check is Performance check
done and packing is
performed. is done.
done
J5T34771ZM
J5T34871ZM
J5T35072ZM
Magnet Guide
Base
Holder
assembly
Plastic
Mould Bush
O-
Ring
Plastic Mould
Bush Terminal
(inside Cavity)
The assembly is
O-ring is put on the
heated up to Performance check Terminals are Final inspection is
assembly and
135°C(max 155°C) is done at room checked for any done through visual
assembly is checked
and performance temperature. inclination inspection.
for any air leakage
check is done.
Assembly process
Injection moulding process
• Material tank: It is a container that is filled with new PPS material in the shape of
granules.
• Granulator: Granulator is used to grind the sprue and runner part of the moulded part so
that it does not get wasted and reused for moulding.
Moulds are cleaned after 4000 shots. The plastic resigns, gaseous particles
and other foreign particles stick to the mould due to its long use. Cleaning is
done in following manner: -
• It is done in a separate mould maintenance area.
• Mould is disassembled into base and blocks.
• Block is disassembled into various inserts.
• These inserts are put into Clipica Ace, a mould cleaning machine.
• After 20 mins they are taken out and kept in water.
• Then they are dried and reassembled.
5S Principle
5S is the acronym for five Japanese words:-
Seiri (sort)
Seiton (systematise)
Seiso (clean)
Seiketsu (standardise)
Shitsuke (self discipline)
THANK YOU