KOM H3I NEFPA LTE 251Upgrade SIMO to


MIMO
HUAWEI TECHNOLOGIES CO., LTD.
Content

 Scope of Work
 Project Plan 110 Upgrade SIMO MIMO Jabo
 Structure Organization
 Delivery Plan
 Technical Solution
 Implementation Flow and Checklist
 Issue and Risk Project

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 2


Scope of Work - Wireless
Region H3I Scenario Quantity Total Qty
Scenario Jabo-1 Jabo-2 Grand Total
1.1 7
1.2 17 1.1 2 5 7
Jabodetabek 110
1.3 84 1.2 10 7 17
1.2.a 2 1.2.a 2 0 2
1.1 46 1.3 49 35 84
North Sulawesi 1.2 22 83 Grand
63 47 110
1.3 15 Total
1.2 11 RFC Cabinet : 65 sites
South West Sumatera 58 RFC Cabinet + TP Cabinet : 38 sites
1.3 47 RRU : 7 sites
Grand Total 251 251
Scenario 1.1 : Swap Existing MRFU to New RRU ( RRU Install on pole near BTS Cabinet ( On Ground )
Scenario 1.2 : Add RFC Cabinet, Re-Use MRFU from ex-Dismantle 1.1 ( 3 Sector)
Scenario 1.2a : Add RFC Cabinet, Re-Use MRFU from ex-Dismantle 1.1 ( 4 Sector)
Scenario 1.3 : Add RFC Cabinet, Re-Use MRFU from Customer WH ( 3 Sector )

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 3


Scope of Work - Power
Region Power Solution Quantity Total
Power Scenario Quantity
Add PSU 1*30A 2U 2
North Sulawesi Add PSU 1*50A 2U 4 14 Add PSU 1*30A 2U 5
New TP48200A + 100Ah 8
Add PSU 1*50A 2U 1 Add PSU 1*50A 2U 8
South Sumatera West New TP48200A + 100Ah 17 20
New TP48200A + 100Ah 63
Swap Batteries to 2*100Ah 2
Add PSU 1*30A 2U 3
Swap Batterei to 1*100Ah 1
Add PSU 1*50A 2U 3
Jabotabek 45
New TP48200A + 100Ah 38 Swap Batterei to 2*100Ah 2
Swap Batterei to 1*100Ah 1
Grand Total 79 79 Grand Total 79

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 4


Structure Team
251 SIMO MIMO Org Structure
RPM
Maya Della
Novianoka

RPC
Intan Kumalasari

Acceptance Mgr
Project Manager
Dedy
Tommy Tri P.
Kurniawan

Technical
FSC FSC FSC Kharis Nugraha DC Support
SolutionTeam
Anis Farida Noer Fajar Hendro Prasetyo Collo. SAAF Miftahul Hasnah
Deka Irisandi

Material Access and Alarm


Engineer
QC Regional eATP, BOQ
Charles Delivery Management
Aris Budiyanto
Pandapotan

CR
Quality
Managemennt

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 5


Project Plan and Scenario
Project Plan June July Augustus September
Milestone TOTAL W24 W25 W26 W27 W28 W29 W30 W31 W32 W33 W34 W35 W36 W37 W38
PO Release 110 Done
PO Registration 110 Done
Material Inbound 110 7 24 41 38
TSS 110 40 40 30
Colo submit 110 99 11
Colo Approval 110 99 11
SAAF Submit 110 99 11
SAAF Approval 110 99 11
MOS 110 7 10 24 31 10 28
Site Integrated ( Beaming ) 110 7 10 24 31 10 28
e-ATP 110 7 10 24 31 10 28
CAC 110 41 69

 RRU scenario will implemented as 1st batch


 RFC cabinet will be implemented as 2nd batch
 RFC+TP cabinet will be implemented as 3rd batch
o This RFC and TP cabinet might be have some acceleration in
case we found and confirmed by H3I that the site no TP
needed. (existing TP still enough to cover current and
upcoming DC power requirement)

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 6


Scenario 1.1 Swap Existing MRFU to RRU1800 2T2R (7 Sites)
RRU 2T2R 3959

BTS3900A Ver. B AC type BTS3900A Ver. B AC type

TCU TCU
SLPU SLPU
PMU PSU PSU PSU PMU PSU PSU PSU

PDU PDU
WBBP WBBP WBBP WBBP
WBBP
FANc

WBBP

FANc
UPEUd

UBBPe4

UPEUd
UBBPe4
WBBP UMPT WBBP UMPT

Install New Pole Near BTS Cabinet for New RRU


Install 3 new RRU2T2R 3959 at New Pole
GL1800 MRFU

GL1800 MRFU

GL1800 MRFU
U2100 WRFU

U2100 WRFU

U2100 WRFU

Dismantle 3 pcs existing MRFU GL1800

U2100 WRFU

U2100 WRFU

U2100 WRFU
Reconfigure from SIMO to MIMO remotely at NOC
Update License additional RRC Connected User and Optional Feature Phase 2

BOTTOM OF RACK BOTTOM OF RACK

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 7


Scenario 1.2 Reusing MRFU ex-Dismantle Scenario 1.1 – 3 Sector (17 Sites)
BTS3900A BTS3900A
Install new RFC Cabinet
TCU TCU Move Existing 3 MRFU from existing RFC to new RFC Cabinet
SLPU SLPU
Install 3 New MRFU to New RFC Cabinet (Re-use from Ex-Dismantle Scenario 1.1)
PMU PSU PSU PSU PMU PSU PSU PSU
Connect RF Cross Cable between MRFU
PDU PDU
Reconfigure from SIMO to MIMO remotely at NOC
WBBP WBBP WBBP WBBP
WBBP WBBP Update License additional RRC Connected User and Optional Feature Phase 2
FANc

FANc
UPEUd

UPEUd
UBBPe4 UBBPe4
WBBP UMPT WBBP UMPT

DCDU DCDU DCDU


FMU FMU FMU
GL1800 MRFU

GL1800 MRFU

GL1800 MRFU
U2100 WRFU

U2100 WRFU

U2100 WRFU

GL1800 MRFU

GL1800 MRFU

GL1800 MRFU

GL1800 MRFU

GL1800 MRFU
GL1800 MRFU
U2100 WRFU

U2100 WRFU

U2100 WRFU

BOTTOM OF RACK BOTTOM OF RACK BOTTOM OF RACK

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 8


Scenario 1.2.a Reusing MRFU ex-Dismantle Scenario 1.1 – 4 Sector (2 Site)

BTS3900A BTS3900A BTS3900A BTS3900A Install new RFC Cabinet


Move Existing 1 MRFU from 1st RFC to 2nd RFC
TCU TCU TCU TCU
Cabinet
SLPU SLPU SLPU SLPU
Install 4 New MRFU to New RFC Cabinet (Re-use
PMU PSU PSU PSU PMU PSU PSU PSU PMU PSU PSU PSU PMU PSU PSU PSU from Ex-Dismantle Scenario 1.1)
Connect RF Cross Cable between MRFU
PDU PDU PDU PDU
Reconfigure from SIMO to MIMO remotely at NOC
WBBP WBBP WBBP WBBP
Update License additional RRC Connected User and
WBBP WBBP
FANc

FANc
Optional Feature Phase 2
UPEUd

UPEUd
UBBPe4 UBBPe4
WBBP UMPT WBBP UMPT

DCDU DCDU DCDU DCDU DCDU


FMU FMU FMU FMU FMU
GL1800 MRFU

GL1800 MRFU

GL1800 MRFU

GL1800 MRFU

GL1800 MRFU
GL1800 MRFU

GL1800 MRFU

GL1800 MRFU

GL1800 MRFU

GL1800 MRFU

GL1800 MRFU

GL1800 MRFU
U2100 WRFU

U2100 WRFU

U2100 WRFU

U2100 WRFU

U2100 WRFU

U2100 WRFU
U2100 WRFU

U2100 WRFU

U2100 WRFU

U2100 WRFU

U2100 WRFU

U2100 WRFU
BOTTOM OF RACK BOTTOM OF RACK BOTTOM OF RACK BOTTOM OF RACK BOTTOM OF RACK

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 9


Scenario 1.3 Reusing MRFU from H3I WH Scenario – 3 Sector (84 Sites)
BTS3900A BTS3900A
Install new RFC Cabinet
TCU TCU Move Existing 3 MRFU from existing RFC to new RFC Cabinet
SLPU SLPU
Install 3 New MRFU to New RFC Cabinet (Re-use from H3I WH)
PMU PSU PSU PSU PMU PSU PSU PSU
Connect RF Cross Cable between MRFU
PDU PDU
Reconfigure from SIMO to MIMO remotely at NOC
WBBP WBBP WBBP WBBP
WBBP WBBP Update License additional RRC Connected User and Optional Feature Phase 2
FANc

FANc
UPEUd

UPEUd
UBBPe4 UBBPe4
WBBP UMPT WBBP UMPT

DCDU DCDU DCDU


FMU FMU FMU
GL1800 MRFU

GL1800 MRFU

GL1800 MRFU
U2100 WRFU

U2100 WRFU

U2100 WRFU

GL1800 MRFU

GL1800 MRFU

GL1800 MRFU

GL1800 MRFU

GL1800 MRFU
GL1800 MRFU
U2100 WRFU

U2100 WRFU

U2100 WRFU

BOTTOM OF RACK BOTTOM OF RACK BOTTOM OF RACK

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 10


RF Cross Cable Connection and Jumper Re-Connection

Main Jumper

CPRI Cable

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 11


Implementation Checklist
Down time implementation
Activity PIC Impact 30 Min 30 Min 30 Min

Turn off Existing MRFU Partner 2G&4G Down

Move Existing MRFU to new MRFU Cabinet Partner 2G&4G Down

Connect RF Cross cable between MRFU Partner 2G&4G Down

Re-connect Jumper Partner 2G&4G Down

Inform to BSS for installation done. Partner 2G&4G Down

Running script command to configure from SIMO to MIMO Partner 2G&4G Down

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 12


Risk Project refer to SIMO MIMO 251
 When SIMO only 1 (Main) Feeder line can detect VSWR alarm, There are possibility
existing Diversity Feeder Line have VSWR alarm, but not detected. After MIMO
implemented, both Feeder can detect VSWR alarm.
 Limit Access Time dependency to CR Approval ( day time )
 eATP Approval Procedure
 Site Model ( Fix for the standard installation attend by HW RO, MS and H3I Team )

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 13


Thank you
www.huawei.com

Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved.


The information contained in this document is for reference purpose only, and is subject to
change or withdrawal according to specific customer requirements and conditions.

Вам также может понравиться