Академический Документы
Профессиональный Документы
Культура Документы
Dr. M. RAMASAMY
Chemical Engineering Program
Universiti Teknologi PETRONAS
• A sensor
• A transmitter
• A controller
• A final control element
Another simple
example:
What is a process?
Notation: Assumptions:
• w1, w2 and w are mass • w1 is constant
flow rates
• x2 = const. = 1 (stream 2 is pure A
• x1, x2 and x are mass
• Perfect mixing in the tank
fractions of component A
Control Objective:
Keep x at a desired value (or “set point”) xsp, despite
variations in x1(t). Flow rate w2 can be adjusted for this
purpose.
Terminology:
• Controlled variable (or “output variable”): x
• Manipulated variable (or “input variable”): w2
• Disturbance variable (or “load variable”): x1
• Design Question
What value of w2 is required to have x x sp ?
2/10/2020 CAB3014 - Chemical Process Dynamics and Control 28
Overall balance:
Process Dynamics and Control
0 w1 w2 w (1-1)
Component A balance:
w1x1 w2 x2 wx 0 (1-2)
keep x at xsp.
• But what if conditions change?
1 x w2 FB
2 x1 w2 FF
3 x1 and x w2 FF/FB
4 - - Design
change
Disadvantages:
• No corrective action occurs until after the
disturbance has upset the process, that is,
until after x differs from xsp.
Distinguishing feature:
measure a disturbance variable
Advantage:
• Correct for disturbance before it upsets
the process.
Disadvantage:
• Must be able to measure the disturbance
No corrective action for unmeasured
disturbances
(hours-days) 4. Real-Time
Optimization
Process