Heat Recovery Steam Generators

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

What is HRSG / WHRB ?


 HRSG : Heat Recovery Steam Generator
 Recovers heat energy available in GT Exhaust and
Generates Steam
 WHRB : Waste Heat Recovery Boiler
 Recovers heat energy available in the Waste
Gases from various Processes
Steam out

HRSG
or
Flue Gas in WHRB Flue Gas out

Feed water in

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Heat Recovery Steam Generators


behind Gas Turbines

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Why HRSG ?

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSG Applications

HRSGs are used in:


 Combined Cycle Power Plants to provide steam to a
steam turbine

 Cogeneration Plants to provide steam for industrial


processes

 Combined Cycle Cogeneration Plants to provide steam


to a steam turbine and the extraction from steam
turbine is used for industrial processes

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Efficiency Levels

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Combined Cycle Application

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Combined Cycle Plant

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Popular Gas Turbines

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

No of HRSGs supplied to
Combined cycle plants by BHEL

Gas Turbines

GE Fr5 GE Fr6 GE Fr6FA GE Fr 9E V94.2 Others

2 14 5 7 7# 14 *

Total 49

•WH/W191(3 Nos); MES/SB30(1 No) ; MHI Fr 6 (4 Nos); ALST PG6541B(6 Nos)


#
4 HRSGs of Wagner Biro Design

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Plant Configuration Options

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

100 MW Plant Configuration Options

Fr6 GT 2P HRSG

STG

Fr6 GT 2P HRSG

Fr6FA GT 3P HRSG STG

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

350 MW Plant Configuration Options

Fr9E GT 2P HRSG

STG

Fr9E GT 2P HRSG

Fr9FA GT 3PR HRSG STG

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

1300 MW Plant Configuration

Fr9FA GT 3PR HRSG

STG

Fr9FA GT 3PR HRSG

Fr9FA GT 3PR HRSG

STG

Fr9FA GT 3PR HRSG

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Heat Recovery Steam Generators

for

Gas Turbines upto 60 MWe

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSGs behind Fr 5 GT

Pressure Parameters In operation


Customer Power Output No of units
Level t/h kg/cm
2
°C from

32.5 MW
PPCL, Karaikal 1 HP 48.3 45.5 390 1999
1GT+1HRSG+1ST

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSGs behind Fr 6 GT
Pressure Parameters In operation
Customer Power Output No of units
Level t/h kg/cm
2
°C from

98 MW HP 59.3 62 483
AECO, Vatwa 2 1990
2GTs+2HRSGs+1ST LP 10.8 5 SAT
146 MW HP 58.4 62 483
GIPCL, Baroda 3 1990
3GTs+3HRSGs+3ST LP 12.4 5 SAT
97 MW HP 59.5 62 483
APSEB, Vijjeswaram 2 1990
2GTs+2HRSGs+1ST LP 11 5 SAT
146 MW HP 57.5 62 483
GEB, Utran 3 1991
3GTs+3HRSGs+3ST LP 11.5 5 SAT
103 MW
NEEPCO, Kathalguri 2 HP 59.7 41 473 1994
2GTs+2HRSGs+1ST
109 MW HP 60.1 80 520
RVUNL, Ramgarh 2 2003
2GTs+2HRSGs+1ST LP 15.4 6 200

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Heat Recovery Steam Generators

for

Higher Capacity Gas Turbines

(60 – 160 MWe)

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Triple Pressure HRSGs behind Fr 6FA GTs


Pressure Parameters In operation
Customer Power Output No of units
Level t/h kg/cm
2
°C from

107.88 MW HP 110.6 107 537


TNEB, Kovilkalappal 1 IP 9.6 30 260 2001
1GT+1HRSG+1ST
LP 8.1 6 200
105 MW HP 105.4 107 537
TNEB, Perungulam 1 IP 8.6 30 260 2003
1GT+1HRSG+1ST
LP 7 6 200
100 MW HP 113.1 107 537
GSECL, Dhuvaran 1 IP 8.7 30 260 2003
1GT+1HRSG+1ST
LP 7.5 6 200
100 MW HP 110.7 107 542
TNEB, Kuttalam 1 IP 8.2 27.5 317 2004
1GT+1HRSG+1ST
LP 8.2 4.87 227
107 MW HP 118.2 107 542
GSECL, Dhuvaran Under
1 IP 8.3 30 260
Phase-II 1GT+1HRSG+1ST Execution
LP 6.6 6 200

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSGs behind Fr 6FA GTs (70.14 MW ISO)


Tamilnadu
Customer Tamil Nadu
Electricity
Electricity Board
Board
HP IP LP
Parameters
Steam flow t/h 110.6 9.6 8.1
Pressure kg/cm2(a) 107 30 6.0
Temperature °C 537 260 200
GT Fuels NG
Commissioning February 2001

Salient Features Top supported


Module ht 12.1m
1 No HRSG for 107 MW CCPP
Two width
at TNEB,Kovilkalappal,India.
94 Modules

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSGs behind Fr 9E GT

Pressure Parameters In operation


Customer Power Output No of units
Level t/h kg/cm
2
°C from

165 MW HP 176 80 520


GIPCL, Baroda 1 1998
1GT+1HRSG+1ST LP 45.6 6 200
350 MW HP 188.4 80 520
NTPC, Kayamkulam 2 1999
2GTs+2HRSGs+1ST LP 39.8 6 200
330 MW HP 180.2 76.6 520
DVB, Pragati 2 2003
2GTs+2HRSGs+1ST LP 37.1 5.8 200
330 MW HP 187.1 79.2 514 Under
RVUNL-Dholpur 2
2GTs+2HRSGs+1ST LP 39.8 6 200 Execution

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSGs behind Fr 9E GTs (123.4 MW ISO)


Customer National
Thermal Power
Corp. Ltd
Parameters HP LP
Steam flow t/h 188.4 39.5
Pressure kg/cm2(a)
80 6.0
Temperature °C 520 200
GT Fuels Naptha/NG/HSD
Commissioning October 1999

Salient Features Top supported


Module ht 18.8m
CPH re-circulation
2 Nos HRSGs for 350MW CCPP
Two width
102 Modules at NTPC,Kayamkulam,India.
Boiler Performance & Proposals – FBC & HRSG
Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSGs behind V94.2 GT

No of Pressure Parameters In operation


Customer Power Output
units Level t/h kg/cm
2
°C from

817 MW HP 225.9 65.3 530


NTPC, Dadri 4 1992
4GTs+4HRSGs+2ST LP 46.7 4.8 200
200 MW HP 226.7 79 525
TEC, Trombay 1 1994
1GT+1HRSG+1ST LP 46.1 6 200
400 MW HP 231 80 530
NTPC, Faridabad 2 2000
2GTs+2HRSGs+1ST LP 46.3 5 200

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Dual Pressure HRSG


behind V94.2 GT (157 MW ISO)
Customer Tata Electric
Company, Trombay

Parameters HP LP
Steam flow t/h 226.7 46.1
Pressure kg/cm2(a) 80 7.0
Temperature °C 525 200
GT Fuels NG/HSD/Naphtha
Commissioning October 1994

Salient Feaures Bottom


supported
HRSG for 200 MW CCPP
Module ht 16.3m
at TEC,Trombay,India.
Three width

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Heat Recovery Steam Generators

for

Advanced Class Gas Turbines

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Triple Pressure Reheat HRSG

• For maximum heat recovery from GT exhaust & better Combined Cycle
Heat Rate

• HP Steam to ST

• IP Steam to CRH or GT Injection ; HRH Steam to ST

• LP Steam to Deaerator / ST

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Arrangement of Reheat System

Hot Reheat
HP IP LP
Cold Reheat

HP Main Steam IP Main Steam LP Main Steam

HP IP LP
Drum Drum Drum

H H H H H
P R P R P H P I I I P L L
C
S H S H S P E P P P E P P
P
H H H E C S E E C S E
H
II I V H V C H V
II IB IA II I

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Reheat System
Ideally Suited for Advanced Class GTs due to the high level of GT
exhaust flow and temperature

Features
• Identical steam temperature for both HP Superheater / Reheater
• Sandwiching of Superheater and Reheater sections
• Optimum steam side pressure drop
• Cascaded Bypass system for Reheater for
• Normal Start up / Shut down
• Upset conditions like rapid load rejection and unit trip
Boiler Performance & Proposals – FBC & HRSG
Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Reheater Arrangement
Cold RH
Hot RH Steam
Steam
IP Steam
HP
HP
Steam Drum

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Steam Parameters

For Combined Cycle System, Optimum Steam Pressure and temperature


levels for Triple Pressure Reheat System are

• HP : 120-130 bar and 535-565°C

• RH : 28-30 bar and 535-565°C

• LP : 4-7 bar and 200-230 °C

• Steam Flow rates for three Pressure levels are decided based on
optimum pinch and approach temperatures

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Co-generation Application

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Fired Cogeneration Plant


With FD Fan Mode Option
Fuel

Steam to process
Air
Air GT Exhaust

Exhaust
FD Fan
Fresh Air
HRSG

Feed water
Fuel

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Supplementary Fired HRSG

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Fuels For Supplementary Firing

 Natural gas

 Naphtha

 HSD

 Kerosene

 Light Diesel Oil

 Intermediate Fuel Oil (Residual Oil)

 Other distillate fuel oils ( LSHS etc )

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Duct Burner(Gas) Arrangement

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Duct Burner(Oil) Arrangement

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

No of HRSGs supplied to
Industrial customers by BHEL

GE Fr3 GE Fr5 GE Fr6 Other GTs

Unfired Fired Unfired Fired Unfired Fired Unfired Fired

- 6 6 21 - 24 1* 5#

HRSGs behind Gas Turbines 63

HRSGs for other applications 9@

•ALST/MS 5001; #
JBE/Fr5(2Nos); MES/SB60(3Nos) @
sponge iron plant

Upto HPCL-Visakh

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI
HRSGs behind Fr 5 GTs (26.3 MW ISO)

Indian Oil
Customer
Corporation Ltd
Plant Barauni

Parameters
Steam flow, t/h 48.2
Pressure , kg/cm2(a) 40
Temperature, °C 440
GT Fuel Naptha/Gas/HSD
HRSG Fuel Unfired

Commissioned in 2001
Salient Features Module ht 10.4m
Single width 2 Nos HRSGs
21 Modules
for IOCL, Barauni
Boiler Performance & Proposals – FBC & HRSG
Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSG behind Fr5 GT with FD Mode Option


Oil & Natural Gas
Customer
Corporation Ltd
Plant Gandhar
GT+SF FD
Parameters
Mode Mode

Steam flow, t/h 62 64.8


Pressure , kg/cm2(a) 46 46
Temperature, °C 443 443
GT Fuel NG
HRSG Fuel Fuel Gas

Commissioned in 1997

Salient Features Module ht 8.3m


Single width
27 Modules HRSG With FD Fan Mode

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Duct Fired HRSG behind Fr 6 GT (38.34 MW ISO)


Customer Reliance Industries Ltd
Steam Drum
Plant PG Hazira Jamnagar

Parameters
E
Steam flow, t/h 125 125 125 E
S D S V
Pressure , kg/cm2(a) 105 118 116 B C
H H A
Temperature, °C 500 512 510 GT P
O
GT Fuel NG/Naptha/HSD Exhaust
HRSG Fuel NG/Naptha / HSD / Kerosene

Commissioned in 1995 1996-99 1999 13 Nos HRSG for RIL-Patalganga/


Hazira / Jamnagar, India.
Salient Features Module ht 8.3m
Two width
66 Modules
125 tph even at 20MW GT load

(~3 times unfired output)

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Duct Fired HRSG behind Fr 6 GT (38.34 MW ISO)

Customer Indian Petrochemicals Ltd Steam Drum

Plant Gandhar
GT+SF Mode FD Mode
Parameters
Steam flow, t/h 100 100 DB SH EVAP ECO
Pressure , kg/cm2(a) 108 108 GT
Temperature, °C 513 513 Exhaust
GT Fuel Naptha/HSD
HRSG Fuel Naptha / HSD / LDO
FD Fan
Commissioned in 1997

Salient Features Module ht 8.3m


Two width
56 Modules
MCR Steam Output Even in 1 No HRSG behind Fr 6 GT
FD Mode for IPCL-Gandhar
Duct burner for 90Mkcal/h

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Furnace Fired HRSGs behind Fr 6 GTs (39.62 MW ISO)

Indian Oil
Customer
Corporation Ltd
Plant Panipat
Membrane Wall Steam Drum
Parameters Water Cooled
Steam flow, t/h 110 Furnace
Pressure , kg/cm2(a) 48
Temperature, °C 405 SH EVAP ECO MUH
GT Fuel Naptha/HSD
HRSG Fuel IFO / HSD GT
Exhaust
Commissioned in 2001

Salient Features Module ht 12.1m 4 Nos HRSGs for IOCL-Panipat


Single width
40 Modules
Integrated Power Plant, India.
Furnace Fired
HRSG

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSGs Vs Conventional Boilers

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSGs Vs Conventional Boilers


In HRSGs
 GT exhaust is the main heat source - no need for a firing system(unless
supplementary fired).
 Positive pressure of GT exhaust provides draft – no need for fans (except
FD Mode)
 Steam generation at multiple pressure levels
 Heat transfer is predominantly through convection
 HRSGs do not generally use membrane wall construction
 Finned tubes used for compactness and maximum heat transfer

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSGs-Classification

Gas flow direction Horizontal Vertical

Circulation Natural Assisted / Forced Once -Through

Firing Unfired Duct Fired Furnace Fired

Pressure Levels Single Multiple

Reheater Reheat Non-Reheat

Construction Modular Coil Design

Width Single Double Triple

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

BHEL HRSGs - Road Map


1977 : First HRSG for Namrup, Assam - Based on In house Design

1982 : First Supplementary Fired HRSG for ONGC, Uran - In house design

1986 : First Furnace Fired, Dual Pressure HRSG with FD mode for ONGC-Hazira (Fr5 GT)

1988* : Technical Collaboration with

1989 : Auto Trip Transfer established within 1 minute at ONGC-Hazira

1991 : First Dual Pressure Triple width HRSG behind V94.2 GT for TEC-Trombay

1999 : First Triple Pressure HRSG behind Fr 6FA GT for TNEB-Kovilkalappal

2003 : First Furnace fired HRSG for firing Heavy Fuel Oil for IOCL-Panipat

* Extended upto 2010

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

BHEL Experience - HRSGs & WHRBs

WHRB (Sponge Iron) - 9


Combined Cycle - 49
Cogeneration
Unfired - 7
Supplementary Fired - 56
Total - 121

ALST-Alsthome Atlantique, France MHI-Mitsubishi Heavy Industries, Japan


JBE-John Brown Engg, UK MES-Mitsui Engg & Shipbuilding, Japan

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Features of BHEL HRSGs

 Triple Pressure Reheat


 Natural circulation
 Horizontal configuration
 Modular construction
 Fully drainable sections
 Top Supported
 Complete internal insulation
 Composite Angle Inlet Transition duct
 Despatched as Loose Modules
 Insulation at Site

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Modular Construction
Single Row Module

Two Row Module

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Arrangement of Modules

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Arrangement of HRSG

SH Evaporator Economiser

DESH

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Natural Circulation HRSG


 Horizontal Gas Flow
 Vertical Tubes

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Internal Insulation

Outer Duct Casing

Internal Insulation

Liner Plates

Flue Gas Path

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Manufacturing Facilities

for

HRSG

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Shop facilities

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Shop facilities

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Special facilities

Facility created
for larger size
HRSG Module
Fabrication

Module Height – Upto 26 m


Boiler Performance & Proposals – FBC & HRSG
Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Waste Heat Recovery Boiler


For Process Plants

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Applications of WHRB

 Recovering Heat in Industrial Exhausts from

 Iron & Steel Plants

 Copper / Zink Smelter Plants

 Diesel Engines

 Cement Plants

 Chemical / Fertiliser Plants

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

BHEL’s WHRBs

Sl Contract
Customer Units Steam Parameters Fuel Heat Source Status
No Year

Pressur Temp
Flow (t/h)
e (ata) (°C)

Prakash Industries Ltd, Sponge Iron In Operation


1 1991 1 46.8 53 410 Unfired
Chamba., MP Kiln Exhaust since 1993

Prakash Industries Ltd, Sponge Iron In Operation


2 1994 1 46.8 53 410 Unfired
Chamba., MP Kiln Exhaust since 1996

Sunflag Iron & Steel Co.,


Bhandra, Nagpur Sponge Iron In Operation
3 1994 1 45.0 65 485 Unfired
Kiln Exhaust since 1998
Maharastra.

Bhushan Steel & Strips


Sponge Iron Under
4 Ltd, Meramandali, 2004 4 55.4 105 540 Unfired
Kiln Exhaust Execution
Orissa

Jindal Stainless Ltd, Ferro Chrome Under


5 2004 2 28.5 42 405 Unfired
Dubri Orissa Kiln Exhaust Execution

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Typical General Arrangement of


WHRB System for Sponge Iron Plant

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Arrangement of WHRB

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Salient Features of BHEL WHRBs

 Single Drum, Natural circulation & Top Supported design


 Fully drainable heat transfer sections with Horizontal / Inclined

tubes
 Two stage Superheater with interstage spray type attemperator
 Non steaming Economiser
 Economiser recirculation system
 Induced Draft fan
 Electrostatic Precipitator (ESP)

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Salient Features of BHEL WHRBs

Features for handling sticky dust laden (~ 65 g/Nm3) kiln exhaust gas
at high temperature (~1000°C)
 Fusion / Fin welded membrane wall construction
 Radiation chamber at inlet for reducing the gas temperature
 Plain tube heat transfer sections
 Inline Tube Arrangement
 Inter-Bank Soot blowers for on-load cleaning
 Cassette baffles to protect economiser coil bends from erosion
 No convective sections in First pass & superheater, Evaporator
and economiser located in second/third passes
 Single / Multipass vertical (Downward and Upward) gas flow
passes to enable positive dust settlement through hoppers

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Design
&
Operational Aspects

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSG Temperature Profile


Temperature

Flue Gas
Superheater
Pinch Point
Approach Point
Evaporator
Economiser

HRSG Inlet HRSG Outlet

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Optimum Pinch & Approach Temperatures


 Higher Pinch Point
 Lower Steam Qty - Less Material - Cheaper HRSG
 Lower Pinch Point
 Higher Steam Qty - More Material - Costlier HRSG
 Optimum Pinch Point (5 To 10 Deg.C)

 Higher Approach Point


 Lower Steam Qty - Less Material - Cheaper HRSG
 Steaming At Part Loads - Less likely
 Lower Approach Point
 Higher Steam Qty - More Material - Costlier HRSG
 Steaming At Part Loads - More likely
 Optimum Approach Point (5 to 10 Deg.C)

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Pinch Point

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Approach Point

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Optimisation of Heat Transfer Sections Arrangement

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Unique aspects in HRSG Design

 HRSG is a slave system – No direct control over inputs

 More than one HRSG feeding a Single Steam Turbine (2-2-1)

 Multiple Pressure levels

 Sliding pressure operation

 Condensate / makeup water heating

 Protection against water / acid condensation

 Balancing the requirements at unfired / GT+SF / FD modes

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

GT Characteristics

GT output / exhaust parameters


depend on
 Ambient Temperature

 RH

 Site Elevation

 Back Pressure

 Inlet Air cooling System

 Injection

 Combustor Type

 IGV position

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Multiple Pressure Levels & Reheat System


 Single Pressure Non Reheat
 % Efficiency : ~38-42

 Dual Pressure Non Reheat


 % Efficiency : ~42-50
 Widely Used

 Triple Pressure Non Reheat


 % Efficiency : ~50-52

 Triple Pressure Reheat


 % Efficiency : 55-58 (Single RH) / 60 (Double RH)
 For Advanced Class Gas Turbines

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

CPH / Deaerator System


LP Steam

ST

HRSG CPH

Condenser

GSC
HP BFP
To HP Eco
CEP
IP BFP
To IP Eco

LP BFP
To LP Eco

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

CPH with Recirculation System


for Protection of CPH against Dew Point Corrosion

To Deaerator

From Condenser

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSG Start-up Considerations

 Temperature difference across thick walled components

 Thermal stresses

 Pressure stresses

 Thermal stress plus pressure stress < Max. allowable stress

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSGs for CCPP - Present Trend

 Dual / triple pressure levels

 Very high pressure

 High superheat temperature

 Low pinch Point

 Close approach Temperature

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSGs for Co-gen Plants - Present Trend

 Increased steam demand / High supplementary firing

 Higher steam pressure and temperature

 Duct burner located between heat transfer surfaces

 SH steam temperature over a wide operating range

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

HRSGs for Co-gen Plants - Present Trend


 MCR steam output even at GT Part load
 Introduction of SF at low GT loads
 MCR steam output even in forced draft fan mode
 Auto Trip Transfer
 Non steaming economiser for a wide operating
range
 CPH to meet plant condensate requirements
 Heavy Fuel Oil / Blended Fuel Oil Firing

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Future Trends
 Advanced Class GTs - 200 MW and above
 Reheat Cycle
 Stringent Environmental Regulations
 Nox : < 25 ppm with gas firing
< 65 ppm with Liquid fuels
 Design for Two-shift operation / Cycling
 Auto Plant Startup / Auto Plant Regulation
 State - of - art C & I
 Two stage supplementary firing
 Supplementary firing in HRSGs behind large GTs
Boiler Performance & Proposals – FBC & HRSG
Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Improvements

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Continuous Design Improvements

• In-house Developments & Analyses

• Joint Work with Educational Institutions (IIT)

• Seminars and International Conference

• Operational feedback from more than 100 HRSGs

• Feed back from manufacturing & Erection groups

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

In-house Developments & Analyses

• Scaled down model Study done In-house for


• Gas flow distribution in HRSGs
• Steam flow distribution in Superheater Modules
• CFD Modeling
• Design of Flow Distribution Grid
• Composite Angle Inlet Transition Ducting
• Steam Flow Distribution
• Increased No. of nozzles for better steam distribution in
Superheater modules

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Scale Down Model for Analysis of
Gas Flow Distribution in HRSG Duct

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Optimisation of HRSG Inlet transition duct


Preferential Flow Pattern in Uniform Flow Pattern in Straight
Straight Transition Duct Transition Duct with Distribution Grid

Streamlined Flow pattern


in Composite Angle Duct

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Grid Plate Constructed with Flat Strips

Horizontal Strips

Outer Duct Casing

Internal Insulation

SS Liner

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Cold Flow Study of
Steam Flow Distribution in Modules

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Results of Scaled down 3D Water flow model studies


1.3
Four pass -Bottom row

1.2
Four pass -Top row

1.1
VARIATION

0.9

0.8 Single pass - Bottom row

Single pass - Top row


0.7
0 5 10 TUBE No. 15 20 25
Boiler Performance & Proposals – FBC & HRSG
Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Effect of number / location of nozzles
on Steam Flow Distribution

Uniform velocity

Low velocity
region
High velocity
region

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Further Improvements implemented in current HRSGs

 Adoption of Single row module

 Adoption of smaller header for reduced thermal stress and fatigue


damage

 Adoption of composite angle inlet transition duct and gas distribution grid
constructed of flat strips

 Insulation of HRSG Casing done at site for reducing Erection Time

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Adoption of single row module


Modules with single row tube will
eliminate additional bending stresses
due to offset tube to header welds

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Site Feedback

…Strategy adopted at… has


considerably compressed the
erection time… Insulation of
casings done in site …

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI
Operational Flexibility of BHEL HRSGs
 Single row modules
 Better welding access & Ease of Manufacture
 Smaller headers
 Reduced header diameter & thickness, Reduced stress levels
 Increased number & proper location of inlet nozzles
 Uniform flow distribution/metal temperatures, reduced
differential expansion between tubes in a module
 Flexible connecting piping
 Adequate flexibility in interconnecting piping to ensure
unrestricted expansion of heat transfer modules
 Adequately sized drains & vents
 For quick draining/venting of all modules
 To minimise thermal shock in superheater

Boiler Performance & Proposals – FBC & HRSG


Bharat Heavy Electricals Limited TIRUCHIRAPALLI

Thank You

Boiler Performance & Proposals – FBC & HRSG

Вам также может понравиться