Lecture on
Microhydropower
(Field Survey)
Tri Ratna Bajracharya, Ph.D.
Director, CES
March 2010
FIELD SURVEY FOR MHP
Focused to preliminary survey of Micro Hydro Power
Project :-
The technique or methods of Engineering Field Survey
works for different projects depends on the nature of
geographical terrain. The methods applicable for
hilly/mountainous terrain will not be applicable for plain
region and same way the methods applicable at plain
region will not be applicable for hilly/mountainous
regions. The methods applicable for hilly regions also
differ from place to place according to the geographical
conditions as accessible and inaccessible.
The survey work can be divided in two stages :-
(1) Preliminary or Pre-feasibility survey
(2) Detailed survey
H1
Ranging Rod with
V1
measuring graduation
VerticalDistance VD=V1+V2+V3+V4+V5+V6
H2
holding vertical
V2
Measuring Tape
holding horizontal
H3
V3
VD
H4
V4
H5
V5
H6
V6
HD
45°
Vertical Angle (-Q)
Line of sight
Parrallel to ground slope
Horizontal Line
Sl
VD
op
SD ista
e
D
nc
e
VerticalDistance
40°
Horizontal Distance HD=SD1xCosQ+SD2xCosQ+....................
HD
Vertical Line
M
M B ZA
49°
V(+)
P Zenithal Angle ZA
(+)VA
41°
Horizontal Line
11
0°
(-)Vertical Angle VA
hi
20°
V(-)
K = 100 Inst Stn
T
S = Top - Bottom
M S
HD B
M
Horizontal Distance HD=K.S.Cos 2 V angle
HD
or = K.S.Sin 2 Z angle