Академический Документы
Профессиональный Документы
Культура Документы
Maximum marks- 5.
Last date- 30 April, 2020.
For each day of delay in the submission, one mark will be
deducted .
Do not copy or allow
copying
This is an individual assignment. Do the assignment yourself.
Do not dump material from the Internet or from your company’s other projects.
I will not try to establish whose slides are original/copied; how others got hold of
your assignment; why other’s assignment resembles your assignment, who
submitted the assignment first, etc.
* Armed forces, DRDO, ISRO, DEA, ECIL, BEL, etc. to avoid this.
Do Assignment A or B.
.
Assignment-A
NETWORK ANALYSIS
Assignment-A
1
The details of a project and the problem is stated in next two slides.
Networks/Charts/Tables made by hand are acceptable… ensure the ‘photos’ are
labeled, and are easy to read.
Outputs of Project Management software are acceptable.
Do not use small font size.
Assignment-A
2
Activity Predecessor Duration Resource-1 Resource-2
(Weeks) (Nos) (Nos)
A - 5 6 -
B A 6 2 4 Resource-1: Carpenters
C B 2 4 7 Resource-2: Masons.
D B 8 6 8
A resource is required throughout the activity
E A 4 - 3 duration. For example, Activity F requires 10
F D, E 3 10 6 nos of Resource-1 and 6 nos of Resource-2 in
G C, D 3 8 3 each week over 3 weeks.
H E, F 6 - 8
I D 5 2 5
J G 7 8 4
K I, J, H 4 - 7
Assignment-A
3
What to do?
1. Draw network diagram, and highlight its critical path(s).
2. In a single table include critical activities, non-critical activities, Slack of non-critical activities,
ES/EF and LS/LF dates.
3. Draw Gantt charts for ES/EF and for LS/LF schedule. Both can also be in a single chart.
4. Draw Graphs/Tables of weekly requirement of both resources over the entire duration of the
project for ES/EF schedule.
5. Smoothen any one resource without delaying the project. Include Graphs/Tables of weekly
requirement of both resources for this schedule.
6. a) Summarize the results, and b) comment on how each output (1 to 5 above) can be used by
the manager.
Assignment-A
4
Draw network diagram, and highlight its critical path(s).
Assignment-A
5
In a single table include critical activities, non-critical activities, Slack of non-critical
activities, ES/EF and LS/LF dates.
Assignment-A
6
Draw Gantt charts for ES/EF and for LS/LF schedule. Both can also be in a single chart.
Assignment-A
7
Draw Graphs/Tables of weekly requirement of both resources over the
entire duration of the project for ES/EF schedule.
Assignment-A
8
Smoothen any one resource without delaying the project. Include
Graphs/Tables of weekly requirement of both resources for this schedule.
Assignment-A
9
a) Summarize the results, and
b) Comment on how each output can be used by the manager.
YourIDNo_AssignmentA
Project Title- Introduce New Digital Motorized Mobile Surgery C-arms into the Market
Briefly about the project: Introduction of a new era smart Mobile Surgery C-arm system. This
product will be completely motorized with advanced Artificial Intelligence imaging capability.
The project is named as “Kurukshetra” and the name will be utilized for all internal
documentation and communication. The product name will be finalized in Marketing reviews.
Assignment-B
4
1. Area – R&D, Product Development & Launch
2. Project Type
Kurukshetra is a strategic project of Gandhaar Ltd (fake name). Kurukshetra marks the
introduction of a New Product with advanced AI technologies in Interventional X-ray and
Imaging field. This new product introduction is considered as Oysters project in Gandhaar Ltd
portfolio and involves technological breakthroughs which is aimed to build a strong presence in
the market in Interventional Surgery Medical Devices.
3. Project Sponsor
Project sponsor of Kurukshetra is the Research & Development Director of Gandhaar Ltd. The
project is wholly financed internally.
Assignment-B
5
4. Project Selection
Non-financial model was used to select this project. Based on Market survey, significant positive
feedback has been received on the Prototype. Customer Survey reveals an average rating of 4
out of 5 on the existing Medical Devices of Gandhaar Ltd, but the major customer enhancement
request is of digitization and automation. Considering these, Kurukshetra project is expected to
have good Market share.
Stages of Approval:
Project Sponsor
Engineering Director
Site Director
Manufacturing Director
Quality & Regulations Director
CFO & CTO
Assignment-B
6
6. Major phases of the project and their durations
Logistics
QA
YourIDNo_AssignmentB
YourIDNo_Both