This document discusses project management controls for cost, quality, and time. It outlines processes for cost control including variation control, bills preparation and payment. Quality control processes cover pre-construction, during construction, and post-construction stages including testing. Time control focuses on monitoring, schedule approval, anticipation and resolution of issues, and completion and financial closure. The document emphasizes that time is the most valuable resource and calls for formal feedback and review to drive continuous improvement.
This document discusses project management controls for cost, quality, and time. It outlines processes for cost control including variation control, bills preparation and payment. Quality control processes cover pre-construction, during construction, and post-construction stages including testing. Time control focuses on monitoring, schedule approval, anticipation and resolution of issues, and completion and financial closure. The document emphasizes that time is the most valuable resource and calls for formal feedback and review to drive continuous improvement.
This document discusses project management controls for cost, quality, and time. It outlines processes for cost control including variation control, bills preparation and payment. Quality control processes cover pre-construction, during construction, and post-construction stages including testing. Time control focuses on monitoring, schedule approval, anticipation and resolution of issues, and completion and financial closure. The document emphasizes that time is the most valuable resource and calls for formal feedback and review to drive continuous improvement.
Cost Control Cost Control Variation Control – Advance scrutiny of GFC Drawings – Identification of variations in the contract – Cost control Advise & value addition – Processing variations in advance – Timely Intimation of variation to the client (if required) Cost Control Bills – Daily Measurement & formalisation of the measurable items – Preparation of Contractor’s Bills at the scheduled cut-off date every month – Advance compilation of documentation as per standard Check-list – Timely release of payments
– Timely Processing & payment of Final Bills
Quality Control Quality Control
Quality Control
Pre- During Post
Construction Construction Construction Quality Control Pre-Construction Stage – Preparation of QAP – Approval of Mix Design – Testing of Cement, Steel etc. – Approval of source for materials During Construction – Testing like sieve analysis, slump test etc. Post Construction Stage o Cube Tests, Core Tests, Third party Test etc. o All the mandatory tests as per the frequency given in CPWD/IS/MORTH/Rly. guidelines for the materials o Proper Record of the tests in the register Time Control Time Control Time is a non-renewable resource to waste. This is the most valuable resource in a project.
Time is the essence of the Project
Time Control Monitoring Timely approval of Project Schedule Meticulous monitoring of Project schedule Reporting with respect to Project Schedule Correctives for shortfalls Time Control Anticipation & Resolution – Engaging with issues after occurrence of event, leads to loss of time – Anticipation of bottleneck that may arise
– Resolution of issues in advance
– Prompt decision making
– In case of doubt refer Tender/ specifications/codes and guidelines. Consult: Pear group/Superiors – Arrive at your own reasoned recommendation/decision
– Living with Doubts = Lack of Awareness = incompetence
Time Control Controls Proper record of the Hindrance as and when occurred Timely process of EOTs with proper justifications & documents No case to be processed without firm recommendation on LD Keeping Client informed (if required) Time Control Completion Handing Over of the completed project in a predefined structured manner Expeditious Financial Closure Feedback, Review & system Improvement
Our System is alive to the situation, lot
of informal feedback keeps coming Let us a create system of formal feedback & review This will result in continuous improvement Next Session
Feedback on issues deliberated
Project Administration Structure Charter of duties THANKS Project Management
Main Causes of failure
– Inertia in the system – Lack of timely application – Lack of awareness – Lack of anticipation