www.sterlingandwilson.com | 2
Main Basic Lifting Parts Of The Crane:
• Lever
• Pulley
• The hydraulic cylinder
www.sterlingandwilson.com | 3
Cranes must be have inspection before being placed
in service using the criteria that applies. Special
attention should be given to the design of crane,
hook, lifting chain and wire rope.
CRANE
INSPECTION
www.sterlingandwilson.com | 4
Main hook testing, the test load should be
Boom meet standard requirement load. Boom &
Testing
cranes should be operated a number of
times at various positions.
www.sterlingandwilson.com | 5
Inspection Of crane components
www.sterlingandwilson.com | 6
www.sterlingandwilson.com | 7
www.sterlingandwilson.com | 8
INSPECTION CERTIFICATE
www.sterlingandwilson.com | 9
CRANE OPERATOR CERTIFICATES
www.sterlingandwilson.com | 10
www.sterlingandwilson.com | 11