Spreadsheet MILP

Transhipment problem
By Lance SO
CTA, MM SCM, SCMb 2019

The excel file I use

One Drive: https://1drv.ms/x/s!AhJtd6y5CclXgeldJQeaLpdvcahkEg Please download (it is read only)

https://docs.google.com/spreadsheets/d/15kQzextqhbzBmxY7zmK8DuPcawXE529GLA0Gpr7caTM/edit?usp=sharing (Google Drive)


Open Solver
This demo use Win10 Excel 365 and open solver

To download or learn more about open solver visit

https://opensolver.org/
OpenSolver has been developed for Excel 2007/2010/2013/2016 (including the 64bit versions) running on Windows, and supports Excel for Mac 2011 on Mac OS
X, with limited support for Excel for Mac 2016. We currently test against Excel 2010/2013/2016 on Windows 7 and Windows 10, and Excel 2011/2016 on OS X
10.7 through 10.11

Open Solver also available to Google Sheet as an add-on


Step 1: Set-up Data

Use Control C (copy); Control


V(paste) command;

Paste special - Transpose help


you change the layout of the
data to fit your need
Step 2: Set up variables

The problem ask the total cost from Factories to DC via Crossdock.

The decision variables are quantity flow through each transportation


arc

1. Between factory and Crossdock


2. Between Crossdock and DC

Tips: They should be same shape of your cost data!


Step 3 - Set-up objective functions

The objective of this problem is to MINIMIZE cost;


so the objective box is the total cost equation.

Which is the sum of the quantity in each


transportation arc times the respective cost

In spreadsheet, we could use sumproduct function


to construct this.

In complex problem you could breakdown your cost


into components equation for easier debugs
Step 4i Set-up Supply Constraints
The capacity, in totes, of the five factories are as follows

From the keyword Capacity, we know it is a maximum constraint (<=)

The LHS of the constraint is the sum of all transportation arc from each
factory to all CrossDocks

The RHS is given by the question as capacity limit of each factory


Step 4ii Demand Constraints
The demand, in totes, of each of the five regional DCs are as follows:

From the keyword demand, we know it is a minimum (or equal) constraint (>= or
=)

The LHS of the constraint is the sum of all transportation arc from each
crossdock to all DC

The RHS is given by the question as Demand of each DC


Step 4iii Conservation of flow constraint
In this single period Transhipment problem the inflow
must equal (=) to out flow of each transhipment
facilities (no left over to next period)

The LHS of the constraint is SUM of inflow from all


factory to each crossdock minus SUM of outflow
form each Crossdock to ALL factory

(the paste transpose of data in step 1 make this


operation easier)

RHS is 0
Step 5 config solver
You should installed Solver (I recommend Open solver)

Objective: is a SINGLE Cell contain the objective function is step2;

Variable: are the range of cells contain all variables defined in


step 3

Constraints: are all step 4 rules plus the integer rules, binary rules
and >=0 rule for the variables (apply common sense)

Sensitivity: If question ask sensitivity, output it to separate


worksheet - This only work for LP, not for MILP

Solver Engine: For MILP any linear engine will do

Save model to exit the config page (solve directly if you are using
excel solver)
Check your model and Solve
Open solver will color code your model for easy
checking if you made any mistakes

After checking press solve and you should have


your answer.

Read carefully if there is any error message


The excel file I use

One Drive: https://1drv.ms/x/s!AhJtd6y5CclXgeldJQeaLpdvcahkEg (it is read only, you could download)

https://docs.google.com/spreadsheets/d/15kQzextqhbzBmxY7zmK8DuPcawXE529GLA0Gpr7caTM/edit?usp=sharing
Other Topics not covered in this PP
- Binary variables
- Linking constraint
- Fix cost
Extra Topics: Binary variable and Link Constraint
The idea of a Link Constraint is to force the binary
to be 1 when the resources is being use.

Step 1 is to declare a set of binary variables


(yellow boxes) and Select “Bin” as a constraint for
this cell range.

Step 2 define constant M which is at least total


demand, our case is 740

Step 3 The constraint is Inflow-M*Bin<=0; When


there is no Inflow, the Binary could be 0, when
there is Inflow, the binary have to be 1

After define the binary and Linked constraint, this


could be use as other Constraint (like min max
facilities use)
Extra Topics: Fixed cost
For Fixed cost problem

You first define the fixed cost equation, it


would be SUMPRODUCT form the
fixcost*Bin variable.

Then your objective function cell should


include all cost from transportation and fix
cost from factory open.

Update your Solver config and solve with


the new solution.
Thank you for reading
Please post your questions or feedback to below post