Вы находитесь на странице: 1из 31

m m

m
  

m  
     
m

m m
§ 

Srishti Mehra (61)


Aatish Wadhwa (78)
Payal Prasad (83)
Kanishi Shah (97)
Abhiruchi Sharma (104)
Harsh Somaya (109)
m !

2 ëstablished in 1987 as a member of Onida


group.
2 Major supplier to Onida, LG, Sharp and
BPL.
2 ISO 9001:2000 Standard Certified.
V

 Owner

 Production manager

 epartment supervisor

 Labourers/workers
m  
 
Õ    



    
  
 


      

 

 
    

           


   
  
| 
 
 
2 Speakers.
2 Hi-fi speakers.
2 Woofers.
2 Public address systems.
2 ome tweeters.
m 
   

|


 



 


| 

  


  
 
   mm

2 Labor intensive.
2 Availability of generators.
2 ëfficient planning and control.
2 ëffective supervision.
2 Scheduling.
2 Cost control.
| 
    

2 Located about a kilometer away from the


Vasai railway station.
2 It is close to the Onida factory.
2 The raw materials supplied come from elhi
and the local Vasai markets.
2 Cheap labour available.
2 Capacity for expansion.
|   

2 The factory had a small- scale


production.
2 The facilities provided by the company
was suitable for the employees.
2 It had an organised and everything was
in close access of the employees.
STORE
ROOM  3 4

""# TESTING
ROOM
EXTENDED
DINING SHED
!
1 2

HALL

R.M STORE R.M


FINISHED
STORE
LADI OFFICE GOODS
GENTS STORE
ES

? 
 

GENERATORS
TRAINI SECURITY
METER METER NG GATE
ROOM ROOM
Õ      
 
Material Raw material
Machines handling and Finished
equipments goods storage

ëxtended
Canteen Gangways
Shed

Receiving and Utilities :


Power
despatching Toilets, water
generators
points coolers etc.
m  
     

$ %      

       


Ú       
2 Chassis.
2 Glue 525.
2 Cyano glue.
2 Nozzle.
2 Voice coil centering gig.
2 Spider.
2 Braided wire.
2 Paper cone.
2 Ink.
| 


2 There were many process into the


manufacturing of speakers
2 As we know now that it was a product
layout, now we will see what type of
production process it is.
A+B Glueing Bonding Gluing

Spider Seat
Labeling Curing
Gluing

Sound
Fixing Fast Gluing
Generation
Heating Soldering Braiding

Trimming Absorption ust Cap Fixing

Magnetization Polarity Testing

Sample Stamping
Packaging
Checking
| 
  
P
A
S A
S
T C
S
K
O ë
' (   A
R  & & 
|  M
G
ë B
I
S L
N
Y
G
ÚmÕ 
|Ú§ÕÕ

IMPROVëS SPëë OF PRO UCTION: In this factory the speed of


production was increased due to the product layout and a combination of about
30000 speakers were produced in assembly line 1 ,2 and 3.

MINIMISëS CLëRICAL WORK: The conveyer belts help to reduce the work
and increase production.

PROVI ëS ëASY AN ëCONOMICAL SUPëRVISION: In this factory only 3


supervisors were required which made it very economical too.

FACILITATëS PLANNING
ÚmÕ 
|Ú§ÕÕ

INVOLVëS HIGH INITIAL CAPITAL INVëSTMëNT: In order to follow the


product layout a lot of capital is needed.It is expensive too.

INFLëIBLë NATURë: Changes in the production cannot be made easily.


| 
  

| 

MACHINë IS NëVëR KëPT I Lë


UNIFORM PRO UCT
FLëIBILITY OF PLANT AN MACHINëRY
LëSS COST
LëSS MANUFACTURING LëA TIMë.
      
2      

Transferring boxes from


one place to another.
Feasible for small units.
Medium- sized trolleys are
used by the factory.
| 

2 Flat transport
structure
2 Made of wood.
2 Used to transfer Work
in progress in
organization.
2 Goods can be even
stored for time- being.
§    
ü Continuous
movement of
material.

üMass production
process.
Ú  


 


") | 

 | 
 

+ 
* ,"
›   
2 Capable of installing new assembly line.
2 For greater expansion, new location has
to be found.
2 The company has already acquired a
land in Noida and it plans to start with
the production from 2012.
2 Working on ISO 14000 environmental
standards.
ÕV 

Вам также может понравиться