Вы находитесь на странице: 1из 8

Writing Problem and Hypothesis

Statements for Engineering Research(31)


/

http://www.chineseowl.idv.tw


Setting of work proposal :
? ?
Work problem :
?
Quantitative specification of problem :

?
Importance of problem :
,
?
Project need : ,
?

Work objective : ?
Methodology to achieve objective
: ?
Anticipated results :
?
Contribution to field :
?
()
Video applications require a wide bandwidth and high
speed operational amplifier. The operational amplifier can be used to
drive the LCD backplane (VCOM) or the gamma-correction divider
string. However, conventional operational amplifiers
are inappropriate for video applications owing to their insufficient speed
and narrow bandwidth. (NOTE : Add 3-4 more sentences that
describe characteristics of the problem or statistics that reflect its
severity) For instance, an operational amplifier
in video applications must attain a bandwidth of 180 Mhz and a slew
rate of 220 V/us. Whereas an operational
amplifier with a wide bandwidth can experience large vibration and
stable operations, an operational amplifier with a narrow one leads to
slow convergence and frequency instability. Consequently, an
unreliable operational amplifier speed limits voltage level transformation
and settling times. Therefore, a high-speed operational
amplifier must developed for video applications, in which its operating
range can be extended to rail-to-rail supply, thus maximizing system
flexibility.
()
A high-speed operational amplifier can be developed for
video applications, in which its operating range can be extended to rail-
to-rail supply, thus maximizing system flexibility. To
do so, the architecture for a high-speed operational amplifier can be
developed that incorporates rail-to-rail circuitry to satisfy system
adaptability. Close loop and open loop frequency can then be
simulated given concerns over frequency response stability. Next,
transient responses for small and large signals for various supplies can
be simulated for high speed voltage level switches. As
anticipated, the proposed operational amplifier can satisfy function-
related requests and perform adequately in video applications.
Importantly, the proposed operational amplifier can increase the
operating speed in video applications given its bandwidth of 180 MHz
and a slew rate of 220 V/us. Additionally, rail-to-rail operating range
can increase system flexibility towards various operating voltages.
(NOTE : Add 2-3 more sentences that describe more thoroughly how
the proposed method contributes to a particular field or sector)
()
Given the heavy emphasis on time product
delivery to the market within the electronics industry, project
leaders must have sufficient information on product development
status to resolve problems timely and allocate resources
efficiently. However, as a complete product
development cycle includes at least eight critical steps and the
collaboration of functional departments, a gap in the workflow
incurs serious project delays and additional overhead costs.
(NOTE : Add 3-4 more sentences that describe characteristics
of the problem or statistics that reflect its severity)
For instance, average product development time in
our company lagged behind the planning schedule by 25% and
exceeded budget expenditures by 25%.
The inability to resolve this problem will incur high development
costs, adversely impacting time to market delivery and lowering
market competitiveness. Therefore, an efficient
customized project management system must be developed to
prevent problems and shorten product development cycle time.
()
An efficient customized project management system can
be developed to prevent problems and shorten product development
cycle time. To do so, an eight-step work flow diagram
can be designed as level-one activities to illustrate the working
relationship between departments. The subset of each diagram can
then be defined as level-two activities to demonstrate the project
sequence within each department. Next, work time spent per
employee can be determined to establish an acceptable time of
completion of each activity. Additionally, the Gantt chart can be drawn
to display the project flow, allocation of human resources and the
estimated project schedule. As anticipated, the proposed
project management system can facilitate synergy among
multidisciplinary field engineers and reduce product development time
by 30%. In addition to enabling project leaders to eliminate
inefficient communication by monitoring status on-line, the proposed
management system can increase competitiveness by reducing
overhead costs and accelerating product delivery to the market.
(NOTE : Add 2-3 more sentences that describe more thoroughly how
the proposed method contributes to a particular field or sector)
Further details can be found at
http://www.chineseowl.idv.tw

Вам также может понравиться