Академический Документы
Профессиональный Документы
Культура Документы
PREPARED BY
SHAHRUKH RAZA
PETROLEUM ENGINEER
Purpose of Drill off Test
The drill-off test is performed in order to determine combination of
Step 1
Maintain a constant rpm. Select a WOB (near to maximum allowable).
Step 2
Record the time to drill off a weight increment (5000 lb)
Step 3
Record length of pipe drilled during step-2.
Step 4
From step 2-3, the drill rate in ft/hr may be found.
Step 5
Repeat step 2 and 3 at least four times. The last test should be at the same
value as the first test. This will determine if the formation has changed or not.
Step 6
Select the bit weight which produced the faster ROP. Maintain this WOB
constant and repeat the above procedure for varying RPM values.
Example
Find the optimum WOB and RPM values with the given
Drill-off test data.
Drill Rate = (Footage x 3600) / Time
Bit weight (lbs) Time (sec) Footage (ft) Drill Rate
(ft/hr)
100 70 25.7
90 65 27.7
80 60 30.0
70 64 23.1
60 69 26.1
100 72 25.0
Results
Optimum WOB = 40000 lbs
Optimum RPM = 80 rpm