Presented by:
• Vimal
• AUCKBURALLY Irfaan (ID: 0811723)
• SEENUNDUN Nitin D. (ID: 0700729)
• NUNDOOSING Reaz (ID: 07007..)
• JATOO Bhisen Vicky (ID 0715994)
INTRODUCTION
Vimal to complete intro part
MEP ON SITE
PORT LOUIS RING ROAD (PHASE1)
FROM MONTEBELLO TO GUIBIES
(GORGES BRIDGE)
Main contractor: Rehm Grinaker
Done by: Aucburally Irfaan
SERVICE PROVIDER ON SITE
consumer unit.
Electricity is distributed through the entire
lightning.
ELECTRICAL SERVICES
A consumer unit is a box of fuses or breakers
, usually arranged in a single row.
ELECTRICAL SERVICES
Lightning system used for underpass
Equa 250W(tubular high pressure sodium ST )
Six 50 KVA pole mounted CEB step down
b) Design services
Electrical engineer involved
Design to be implemented during construction
Implementation effected through construction
drawings and typical drawings
Electrical Works and Services
c) Construction Phase
Excavation for trench for different diameters of pipes
(use of typical drawings)
Bedding, laying of cable/duct, proper backfilling and
warning tapes
Double or Tri-Phase connections (Low voltage
cables/high voltage cables)
Low voltage room includes main distribution board,
cabling, conduits, electrical switches and appliances,
as per schematic layout
Smoke detectors
Fire Alarm System
Socket Layout
Lighting and Fire Alarm Layout
Public Health System
Toilets (WC)
Showers
Air vent pipes
Sewer pipes and manholes
Fire Extinguishers, Hoses and Sand Buckets
Sprinklers
Plumbing works
Water pipelines and taps
Washcar Bay with soakaway
Pipeworks within the building space
Mechanical Services
Windows, Doors and Openings – Ventilation
Air Conditioning: Local Systems using split
units
Water Pumps
Pressure tests undertaken before usage
Standby Generator in case of power loss
Office Block Plan
MEP ON SITE
Most domestic premises receive a single-phase supply of electricity from an area electricity
board at a rating of 240 volts and frequency of 50 hertz.
The area electricity board's cable, from which the domestic supply is taken, consists of four
lines, three lines each carrying a 240 volt supply and the fourth is the common return line or
neutral which is connected to earth at the transformer or substation as a safety precaution
should a fault occur on the electrical appliance. Each line or phase is tapped in turn together
with the neutral to provide the single-phase 240 V supply.
overhead supply.
An underground supply is preferred since all of the electrical service is hidden.
The supply cable is terminated in the area board’s fused sealing chamber which should be
sited in a dry accessible position. From the sealing chamber the supply passes through the
meter, which records the electricity consumed in units of kilowatt/hours, to the consumer
unit which has a switch controlling the supply to the circuit breakers or circuit fuses.
These fuses are a protection against excess current or overload of the circuit since when
overloading occurs, the fuse or circuit breaker will isolate the circuit from the source of the
problem.
PUBLIC HEALTH
Public health services focus on providing safe,
healthy, hygienic, efficient and sustainable
systems that are sensitive to the local
environment. Design skills and services include:
Water supply, sanitation and water recycling.
Sustainable Drainage Systems (SuDS).
drainage
Drainage System
Drainage schemes for buildings are necessary to remove waste water, foul
water and surface water.
Waste water and foul water join together and are disposed in a septic tank
or to a foul water sewer pipe .
The foul water sewer discharges the sewerage to a treatment plant where
it is settled, filtered and chemically treated.
Surface water can be discharged into a soakaway (or Storm Water) drain in
urban areas. The storm water drain discharges water safely to a river or
lake.
A separate system of drainage is used where foul water and surface water
are separated at source and piped individually to a surface water drain or
foul water drain
Conclusion
All this work is monitored and control by the service
engineer.
The main role of Services engineers in construction projects
is to supervise the specialize workers in handling all the
Services works considering the safety and quality
requirements. The Service engineer in the construction site
also reads and studies the M&E plans (usually done by M&E
design engineers) and implement it in the site and
sometimes do necessary actions whether to correct or to
improve the design. They coordinate with other M&E
engineers in the implementation of the Services system
design and also with other engineers of different fields, such
as civil and mechanical engineers, to make the construction
job easier.