A Site Clearing - 4
B Removal of Trees - 3
C General Excavation A 8
D=7 H=5
F=12
B=3
CRITICAL PATH
0-1-2-4-5 = 30
CONCERT STAGE
PCM-2
Antonio, Felix Louie
Dela Cruz, Hazel Faith
Santos, Grace
Project Objectives
To design a structurally stable and aesthetically
pleasing concert stage
To come up with an efficient work scheduling and
organization
To improve acoustical environment and eliminate
sound distortion and interference from the surrounding
To toughen security around the premises of the concert
stage
To induce dynamic mechanisms for creative stage play
effects
Project Deliverables
Planning
• Determine project limitations
Set project dimensions
Determine required project spaces
Consult land title
Refer National Building Code for ordinances
Determine project finances
Make project estimates
Determine owner/client budget
• Design Concert Stage
Draw sketches
Seek client’s approval
Repeat sketches for adjustments
Finalize the design
Draw working drawings
Draw Floor plan
Draw Section/s
Draw Elevation/s
Draw Perspective/s
Draw Structural Plan
Draw Electrical Plan
Conduct Fire and Life Assessment Report
Acquire required signatures
Implementation
• Stage
Floor lights
Overhead lights
Monitor speakers (front and back)
Audience speakers
Monitor equipment
Curtains
Backdrop
• Security
CCTV
Entrance
Exits
Picket fence
• Backstage
Equipment storage
Dressing room
Portable toilet
Props storage
Stage Lighting Control
Roof
• Tensile membrane
• Steel framing
Construct Foundation
• Inspect construction
Rectify mistakes if any
Construct Concert Stage
• Construct flooring
• Construct walls
Construct exterior walls
Construct partition walls
• Construct Roof
Plan
DIMENSIONS IN
METERS (M)
TOTAL LOT AREA
(TLA): 2450 sq.m.
Development Costs
Lot Value PHP 8000 (per sq.m.)x 2450 sq.m. PHP 19,600,000.00
Structure PHP 4000 (per sq.m.)x 312 sq. m. PHP 124,800.00
TOTAL PHP 19,724,800.00
MAJOR WORK PACKAGE WEIGH IN % COST
1.0. INITIATION
1.1. Pre-planning 2% PHP 394,496.00
1.2. Pre-engineering 3% PHP 591,744.00
1.3. Feasibility 3% PHP 591,744.00
1.4. Acquisition 10% PHP 1,972,480.00
TOTAL 18% PHP 3,550,464.00
2.0. PLANNING
2.1. Architectural 10% PHP 1,972,480.00
2.2. Engineering 8% PHP 1,577,984.00
TOTAL 18% PHP 3,550,464.00
3.0. EXECUTION
3.1. Materials
3.1.1. Fence 6% PHP 1,183,488.00
3.1.2. Structure 10% PHP 1,972,480.00
3.1.3. Acoustical System 5% PHP 986,240.00
3.1.4. Electrical System & Lighting 5% PHP 986,240.00
3.2. Labor 20% PHP 3,944,960.00
3.3. Insurance 2% PHP 394,496.00
3.4. Permits 2% PHP 394,496.00
3.5. Test/Inspection 2% PHP 394,496.00
3.6. Construction Overheads 5% PHP 986,240.00
3.7. Supervision 0.50% PHP 98,624.00
TOTAL 58% PHP 11,341,760.00
4.0. CLOSE OUT
4.1. Inspection 1% PHP 197,248.00
4.2. Commissioning 0.50% PHP 98,624.00
4.3. Improvements 5% PHP 986,240.00
TOTAL 7% PHP 1,282,112.00
GROSS DEVELOPMENT COST 100% PHP 19,724,800.00
Sequencing of Activities
Legend Activity Preceding Duration
Activity (days)
0
3 3 1 2 2 1 1
1
3 0
1 1
1 0 0
1
Critical Path
START - A-B-D-H-J-L-M-N
1 = 14