What is a Project?

(Sample Definitions 1)

There are a large number of project definitions!

Example 1:

A project is a temporary endeavor


undertaken to create a unique
product, service, or result

(Guide to the Project Management – Body of Knowledge,


the Project Management Institute, 3rd. Ed., 2004, p. 5)

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 1
What is a Project?
(Sample Definitions 2)

Example 2:

A project is a sequence of unique,


complex and connected activities having
one goal or purpose that must
be completed by a specific time, wthin
budget and according to specification

(Robert K. Wysocki / Robert Beck Jr. / Daniel B. Crane, Effective


Project Management, John Wiley & Sons, 2002, p. 65)

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 2
What is a Project?
(Sample Definitions 3)

Example 3:

A project is a complex, nonroutine,


one-time effort limited by time,
budget, resources, and
performance specifications
designed to meet customer needs
(Clifford F. Gray / Erik W. Larson, Project Management:
The Managerial Process, 2. ed., p. 15)

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 3
What is a Project?
(Sample Definitions 4)

Example 4:

Projects are ad hoc, resource-consuming


activities used to implement
organizational strategies, achieve
enterprise goals and objectives, and
contribute to the realization of the
enterprise‘s mission

(David I. Cleland / Lewis R. Ireland, Project Management:


Design and Strategic Implementation, 4th ed., p. 10)

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 4
Subprojects
 Subprojects are smaller, more manageable components of
larger, more complex projects

 Subprojects have their own goals and outputs (deliverables);


the deliverables together constitute the final deliverable

 Subprojects are comprised of project team members and are


headed by subproject managers who, analogous to the project
manager, must have excellent decision-making,
communication and other requisite skills, and be in a position
to manage the implementation of the subproject work
effectively and efficiently

 Subprojects have, analogous to the main project in which they


are integrated, their own scope, schedules, costs, human
resources and risks

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 5
Subprojects
Example: The Sydney Olympic Games 2000
Human
HumanResources
Resources Test
TestGames
Gamesand
and
Events
and
andVolunteers
Volunteers Trial
TrialEvents
Events

Venues,
Venues,Facilities
Facilities Sponsorship
Sponsorship
Cultural
CulturalOlympiad
Olympiad
Accommodation
Accommodation Management
Management

Transport
Transport Pre-Games
Pre-GamesTraining
Training The Sydney Olympic
Games 2000 was a highly
Media complex project which
MediaFacilities
Facilities IT-Projects
and IT-Projects comprised several
andCoordination
Coordination
distinct work areas, each
Opening of which could be con-
Telecommunications Openingand
andClosing
Closing
Telecommunications Ceremonies sidered as subprojects,
Ceremonies
in their own right, and
Security which all had to be in-
Security Public
Arrangements PublicRelations
Relations tegrated and coordinated
Arrangements
within the framework of
the overall olympic
Medical
MedicalCare
Care Financing
Financing project.

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 6
Programmes (1)
Afforestation

A programme is basically a group Primary Education Promotion


of related projects managed in
a coordinated way to obtain Electrification

EXAMPLES OF PROGRAMMES
benefits and control not
available from managing them Immunization
individually
Poverty Alleviation

Privatization

Project A Project D Space Exploration

Programme Urban Regeneration


Project B Project E
X
Water Resource Development
Project C Project F
Weaponization
Assistant Professor Dr. Aurangzeb Z. Khan
Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 7
Programmes (2)

Project for Upgrading Equipment

A
A CAPITAL
CAPITAL
INVESTMENT
INVESTMENT
PROGRAMME
PROGRAMME
Project for Training Personnel

May Project for Expanding


comprise Production Lines
following
projects

Project for Acquiring Large-Scale


Funding

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 8
Programmes and Projects
(Similarities)
• Programmes and projects have goals which define their
purpose of existence

• Programmes and projects have life-spans defining a starting


and ending point in time

• Programmes and projects necessarily incur a cost

• Programmes and projects require application of a methodology


in order to make the programme or project successful

• Programmes and projects add value to an organization and


must be „strategically aligned“ with it

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 9
Programmes and Projects
(Differences)
• Programmes may have multiple overarching goals whereas
projects have one prime goal

• A programme has a longer life-span and obviously costs more


than the combination of all the projects which constitute it

• A programme is inherently more complex than a constituting


project – it has a broader scope and may require extensive
coordination between its various constituting projects

• Whereas a project results in the creation of an output and is


then ended, a programme must integrate and maintain the
operationality of that output for a specified period of time

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 10
What is a Process? (1)

A process can be defined as a


system of operations in the
design, development and
production of something,
whereby inherent in such a
process is a series of actions,
changes, or operations that bring
about an end result.

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 11
What is a Process? (2)

According to the Project


Management Institute, a process
can also be defined as

„a set of inter-related actions and


activities that are performed to
achieve a prespecified set of
products, results, or services“.

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 12
A Project‘s Defining Characteristics

GOAL
All projects have one prime goal, for e.g., the design
and development of a new camera, construction of a
railway station, regeneration of a derelict
neighbourhood, and optimization of manufacturing
processes in an organization.

In addition to the prime goal, projects can have any number of ancillary
goals (objectives).

The project goal, along with the requirements and predetermined


technical specifications which must be met by the project team,
determines the scope of the project.

<Project Charter, Statement of Work, Scope Statement>

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 13
A Project‘s Defining Characteristics

COST
All projects must incur a cost . because they
consume resources. There can be a multitude of
cost items, for e.g., for the salaries and wages of
project staff, administration and overheads, project
infrastructure, raw materials and equipment used,
rents, consultants and for the work performed by
contractors.

Estimating the cost of a complex project with a high degree of precision


can be difficult in its early stages. Cost overruns are common on
projects and are considered a manifestation of project failure.

<Project Cost Estimating & Budgeting, Cost Baseline, Earned Value Technique>

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 14
A Project‘s Defining Characteristics

TIME
All projects have a life span, corresponding to the
interval between the point in time the project formally
commences and the point in time when it is completed
or prematurely terminated.

The project life-span can range from very short, for e.g., a week for
rearranging books in a library to very long, for e.g., ten years for the
construction of a large dam with attached electric power generating
station.
It is often difficult to determine with accuracy the life-span of a project
due to numerous factors which can influence the project schedule.
Like cost overruns, schedule overruns too are common in projects and
they are also considered a manifestation of project failure.
<Project Phases, Milestones, Activities, Gantt Charts, Network Diagrams, PERT/CPM>

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 15
A Project‘s Defining Characteristics

UNIQUENESS
All projects are unique! No two projects are
completely alike – even if they have the same goal
and scope, same life-span and allocated budget, and
same project manager and team.

Each project will always differ, however small, in at least some


respect from another similar project, for e.g., in the manner the
project was managed and methodology applied, in the project
stakeholders and the level of interaction with them over the project
life-span, in the risks and problems which surfaced in the course of
planning and implementing the project, and so forth.

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 16
A Project‘s Defining Characteristics

SATISFYING NEEDS
All projects are undertaken in order to satisy a customer‘s
need (or exploit an opportunity) - in or outside the project-
undertaking organization. Sometimes projects are done in
order to conform to a statutory requirement.

Examples of projects undertaken to satisfy an internal need/opportunity


include the introduction of a corporation-wide IT Database System, training
of employees in TQM and expansion of manufacturing capacity.

Examples of projects undertaken to satisfy an external need/opportunity


include new product or service development for a specific client or for
mass marketing, and contract work in a building construction project.

Examples of projects undertaken to conform to the law include installation


of a filter to reduce the firm‘s pollution emission levels and remodelling a
worker hostel as a precautionary measure against fire hazard.
Assistant Professor Dr. Aurangzeb Z. Khan
Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 17
Project Complexity
Some Examples of „Simple Projects“

Research Papers Relocating

Tree Planting Campaigns Weddings

Relief Collections Painting

Examinations Parties

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 18
Project Complexity
Some Examples of „Complex Projects“

Bridges Nuclear Power


Stations

Ocean Liners Dams

Commercial Aircraft Skyscrapers

Olympic Games Man on the Moon

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 19
Major Projects in Pakistan: Selected Examples
(includes on-going projects and projects in consideration)

Tarbela and Mangla Dams, Kalabagh Dam (?)

Habib Bank Plaza, Muslim Commercial Bank


Building

Karakorum Highway, Islamabad-Lahore


Motorway, Islamabad-Peshawar Motorway
(under construction)
Assistant Professor Dr. Aurangzeb Z. Khan
Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 20
Major Projects in Pakistan: Examples
(includes on-going projects and projects in consideration)

Jinnah International Airport, Allama Iqbal


International Airport, Islamabad Airport
(under construction)

Karachi Nuclear Power Project, Chashma


Nuclear Power Plant

Turkmenistan to Pakistan Gas Pipeline (under


consideration), Iran to India (via Pakistan)
Gas Pipeline (under consideration)

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 21
Projects in a Historical Perspective
Projects are presumably as old as mankind itself. Projects in antiquity,
and even in the medieval period tended, by and large, to be
architectural in nature. Selected examples of prominent projects in the
historical context are:

 the seven wonders of the ancient world


 the gothic cathedrals of Europe
 the palaces, mosques and mausoleums of the Mughals, Safavids and Ottomans
 Temple complexes in India and South-East Asia and Central and South America
 Castles, fortresses, military campaigns

With the rapid advancement in technology, knowledge, specialization,


resource availability and managerial capabilities – projects have
become much more complex and diverse

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 22
How Important are Projects?

Projects are the building blocks of the


myriad achievements – architectural,
artistic, economic, scientific, technological,
and in many other fields - which
characterize our human civilization

Life, with all the comforts and niceties


as we know it today, would not be
possible without projects

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 23
What is „Project Management?“ (1)

Project Management can be defined as

„a method and a set of techniques based on


the accepted principles of management
used for planning, estimating and
controlling work activities to reach a
desired end result on time – within budget
and according to specification“

(Robert K. Wysocki / Robert Beck Jr. / David B. Crane, Effective Project


Management, 2. ed., John Wiley & Sons, 2002, p. 79)

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 24
What is „Project Management?“ (2)

Project Management can also be defined as a

„unique process, consisting of a set of


coordinated and controlled activities
with start and finish dates, undertaken
to achieve an objective conforming to
specific requirements, including the
constraints of time, cost and resources“

[ISO 9001:2000]

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 25
What is „Project Management“ (?)

Project management is the planning, organizing, directing, and


controlling of company resources for a relatively short-term
objective that has been established to complete specific goals
and objectives. Furthermore, project management utilizes the
systems approach to management by having functional
personnel (the vertical hierarchy) assigned to a specific
project (the horizontal hierarchy)

Harold Kerzner, Project Management: A Systems Approach to Planing,


Scheduling and Controlling, John Wiley & Sons, Inc., New York et. al.,
7. ed, 2001, p. 4

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 26
Project Management Process Groups

INITIATION
INITIATION

PLANNING
PLANNING

EXECUTION
EXECUTION PROJECTS
PROJECTS

MONITORING
MONITORING &
&
CONTROL
CONTROL

CLOSING
CLOSING

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 27
The Functions of Project Management
The basic functions of general management equally
apply to project management
CONTROLLING
Who judges results and by what standards?

DIRECTING PLANNING
Project
Who decides what What are we aiming
Resources
and when? for and why?

MOTIVATION ORGANIZING
What brings out the What‘s involved and
best in people? why?

David I. Cleland / Lewis R. Ireland, Project Management: Strategic Design and Implementation, 4th ed., p. 42.

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 28
A „Typical“ Project Life-Cycle
Dollars of Manhours (level of Effort)

Phase 1: Conceptual Phase 3: Termination

Initiation Planning Implementation Closing

• Implement Schedule • Procure Materials • Train functional


• Identify Need
• Conduct Studies and • Build/ test tooling personnel
• Establish Feasibility
• Develop support • Transfer materials
• Identify Alternatives
• Prepare Proposal analyses requirements • Transfer
• Design System • Procure System responsibility
• Develop Basic
• Build/test prototypes • Verify Performance • Release resources
Budget and Schedule
• Analyze results • Modify as required • Reassign project
• Identify Project Team
• Obtain approval for team members
production

David I. Cleland / Lewis R. Ireland, Project Management: Design and Strategic Implementation, 4th ed., p. 50.
Assistant Professor Dr. Aurangzeb Z. Khan
Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 29
Managerial Actions in the Project Life-Cycle
Phases

Conceptual Phase Planning Phase Execution Phase Termination Phase

Determine that a Define the project Perform the work Assist in transfer of
project is needed organization of the project Project product
(i.e. design, con-
Establish goals Define the project struction, production, Transfer human and
targets Site activation, non-human resources
Estimate the resources testing, delivery etc.) to other organizations
that the organization Prepare the schedule
is willing to commit for the execution Transfer or complete
Phase Committments
„Sell“ the organization
on the need for a Define and allocate Terminate project
project approach tasks and resources
Reward personnel
Make key personnel Build the project team
appointments

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 30
Project Resource Requirements Over Time
Level of Resource required

Resource
usage high as project
Implementation goes
Budget ($) into full-swing

Resource
usage increases
as project work Resource
expands usage goes
Low
down sig-
resource
nificantly
usage

Project Initiation Project Planning Project implementation Project Closure

Time – Project Life-Cycle

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 31
Core Truths About Projects and Project
Management

Major projects are considered the building


blocks in the design and implementation
of an organization’s strategy

Projects are an important means


for ensuring an organization’s
survival and growth

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 32
Core Truths About Projects And Project
Management

Project Management helps organizations


successfully tackle change in an environment
– economic, social, political, legal
technological, competitive, international and
others – which is characterized by a high
degree of complexity, dynamism and uncertainty

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 33
Core Truths About Projects And Project
Management

Project Management allows a focused,


integrated and process-driven application
of an organization’s resources for
effective and efficient realization
of the organization’s goals
and objectives, and its mission

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 34
Major Benefits of Project Management (1)
 Timely development of complex products and services
 Notable organizational processes improvements
 Cost reduction
 Accomplishment of more work in less time and with less resources without
compromising quality
 Enhancement in the quality of the goods and services produced
 More customer influence on product or service design, cost, schedule and project
plan, and enhanced customer satisfaction
 Higher project schedule and cost estimation accuracy
 More appropriate in terms of cooperation, communication and coordination across
functional-organizational delineations
 Usually more appropriate for highly complex and interdependent tasks
 increased employee motivation and productivity

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 35
Major Benefits of Project Management (2)

 Increased profitabilty for the enterprise and increased shareholder


value
 Fosters a new spirit of dynamism in the enterprise
 The focussed, flexible and systematic nature of PM makes the
organization more likely to realize its goals, objectives and mission
in an effective and efficient manner
 PM is solutions-driven and offers a structured process for effectively
tackling problems
 Enhancement of the organization‘s reputation and business
prospects

Virtually all industries can benefit from project management

Assistant Professor Dr. Aurangzeb Z. Khan


Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan Slide 36