Cutover Program-implementation
1. Shut down the AC to the Rectifier on the BTS 3900A cabinet from the ACDB.

: m

al

Off the AC breaker from ACDB

pt

2. Shut down the battery breaker of the rectifier, on the BTS 3900A Cabinet.

pt

Off the battery breaker

pt :

ar

al

pt

pt

3. Shut down the ACDC breaker of the BTS 3900A Cabinet

Off the ACDC breaker


HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 2

pt 0

Cutover Program-implementation
4. Remove the battery cable on the ACDC point prepare it

: m

al

pt

pt

pt :

5. Remove the DC cable on the Load 1 and Load 2 point prepare it

Remove the battery input cable

ar

Remove the load 1 and load 2 cable

al

pt

pt

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 3

pt 0

Cutover Program-implementation contd.


6. Connect it to one of the 2 pairs coming from the new power system, through a two input end connector.

: m

al

pt

pt

pt :

ar

al

New power systems BTS3900A LOAD1 LOAD 1 sketch map

pt

pt

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 4

pt 0

Cutover Program-implementation contd.


6. Connect it to one of the 2 pairs coming from the new power system, through a two input end connector.

: m

al

pt

pt

pt :

ar

al

pt

pt

BTS3900A LOAD1 New power systems LOAD 1 Wiring diagram

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 5

pt 0

Cutover Program-implementation contd.


7. Connect it to the second pair of the 2 pairs coming from the new power system, through a two input end connector.

: m

al

pt

pt

pt :

ar

al

New power systems

pt

BTS3900A LOAD 2

pt

LOAD 2 sketch map

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 6

pt 0

Cutover Program-implementation contd.


7. Do same for Load 2 cable.

: m

al

pt

pt

pt :

ar

al

pt

pt

New power systems LOAD 2 Wiring diagram

BTS3900A LOAD1

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 7

pt 0

Cutover Program-implementation contd.


7.ON the breaker for the new power system on the ACDB.

: m

al

pt

pt

pt :

ar

al

pt

pt

ON the breaker for the new power system on ACDB.

ON/close breaker for load on the new power system

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 8

pt 0

Cutover Program- Check and power on


Equipment check and power on goes thus  Check the voltage at the ACDB point and confirm at the main input point of the new power system, if ok switch on the main input breaker.  Switch on the breaker for the two battery cabinets  Check the DC output from the new power system, if ok close the breaker for the two pair cables going to BTS3900A  Finally check the DC voltage at the DCDB end to confirm same as the output DC at the New power system, if ok confirm the site(s) is/are up and running through the FME switch.  Clean up the site and leave.