TELECOM FACILITIES PROVIDED TO NPCIL, TARAPUR 2.5K OCB RSU AT TAPS COLONY 4 NOS OF DSLAMs 240P DSLAM of 3 Nos. and one 480P DSLAM installed and likely to integrated within 3 days. 500 LINES OCB RSU INSIDE THE NUCLEAR PLANT ONE ISDN PRI ONE 2MBPS LEASE LINE FROM NPCIL TARAPUR TO THE H.Q. AT MUMBAI ONE 2MBPS INTERNET LEASE CIRCUIT AT NUCLEAR PLANT 3 NOS. 2 MBPS INTERNET LEASE CIRCUIT FOR TAPS TOWNSHIP ONE GSM BTS AT TOWNSHIP ONE GSM BTS AND TWO MICRO BTS INSIDE THE PLANT
BSNL KALYAN
BHIWANDI WTR
KALYAN
24F WTR
WADA
12F WTR
MANOR
6F WTR 30 Kms
TARAPUR
PRABHADEVI
DAHISAR
VIRAR
3 1 2 2
TMs for carrying Broadband traffic (Multiply / Huwai) TM for carrying BSC traffic TMs for carrying TAX and Tandem traffic TMs for carrying Leased Circuit Traffic
BSNL KALYAN
MANOR
WADA
AMBADI
12 F TR W s Km
BHIWANDI
FW 24 s Km TR 26
12
N OA 4 A SS ble Ca ms K
GOKHIWARE
SSA OAN CABLE 3 Kms
SATIVALI
KAMAN
This ring is the alternate path for routing traffic from Tarapur to Kalyan or Media Gateway, Bhiwandi.
BSNL KALYAN
STEPS TAKEN TO STRENGTHEN THE RING One arm of W-999 consisting Manor-Wada-Bhiwandi is getting replaced
by W-1108 ring by routing traffic via Manor-Surat-Nasik-Thane-Kalyan. This ring is likely to be commissioned within three to four days. Erection of OF cable on over head between Manor-Wada by WTR. The work is likely to be completed by 31.03.2011. Routing of MPLS, Broadband and Leased Circuit traffic through PE Router at Fountain instead of routing through PE Router of Kalyan. Linking Tarapur Plant Exchange to Tarapur MIDC exchange through radio modem. Commissioning of internal ring Tarapur MIDC-Kurgaon-Tarapur Village Vangaon-Dahanu-Tarapur MIDC. This ring is likely to be commissioned by 10.3.2011.