Technical Audit Of

Sui Southern Gas Company - 2007

Objective
To carryout a systematic and objective verification, analysis and appraisal of the operational functionality. Performance evaluation of the system (safety, managements, documentation, data acquisition and control aspects of the system functions) Operations of equipments/ tools under SSGC use. Appraisal means technical appraisal only and exclude: Financial evaluation Estimation of worth.. Physical execution Inspection, testing Measurement and calibrations

Tasks
Operational functionality and performance evaluation of the system (Integrity, adequacy, effectiveness & efficiency) System Management

Means technical systems and procedures only.


Compliance with relevant legislation, policies, standards and HSE measures in the companys areas of operation.

Legislation and policies are those required to meet laws of GOP.

Scope Of Work
I) Projects System VI) Metering System VII) Distribution System VIII) Civil Works IX) Procurement of material X) Customer service response and operation

II) Transmission System III) Compression System IV) Corrosion System V) Telecommunication System

Projects System

Projects System

a) Pipelines System Construction & Installation activities

Project means the pipeline construction and laying for transmission and distribution systems.
Reference Documents Section 2, 3, 5 & 6 OGRA GTTS ASME B 31.8 API RP 5L 1 API 1104 API RP 1102 Gas Rules 1960

Project System
SSGC to provide: List of various projects in hand/ongoing Planning of each project showing work break down Project Schedule - Planned Vs Actual Manpower & Equipment Deployment - Planned vs. actual General Pipeline construction Manual QA / QC documentation (In house / 3rd Party) Design Dossier/Drawings of few significant completed and on going projects Material inspection procedures & reports cont .

Projects System
Right - of - Way (ROW) Drawings Stringing & Storing records Welding - QA / QC docs, Weld Test Result (NDT& DT), Welder qualification procedure & Records Coat & Wrap - Design Specs, MDS, QA / QC documents Ditching & Lowering / Backfill - Approved & As built drawings Crossings - Approved & As built Drawings Cathodic Protection - Design documents, Soil survey report, Approved & as built drawings Testing procedures & records including Holiday Detection, Leak Detection, Hydro Static Testing

Projects System

b) Procurement of material & equipment for projects (procedure & conformance) Exclusions:
Warehousing Issues relating to land acquisition / land rehabilitation

Reference Documents - API 5L and other related codes


SSGC to provide
Procurement procedure Pre qualification of suppliers Criteria for acceptance and rejection of material Issuance of material

Transmission System

Transmission System
a) Pipeline operations (operation and maintenance planning and control Management) including right of way (ROW), Patrolling, ROW maintenance, River crossing, valve assemblies maintenance, Block Valve and actuator operation, commissioning and de commissioning of pipeline. Ref Doc - OGRA GTTS SEC 8, ASME B31.8 2, OGRA GTTS SEC 8.5

SSGC to provide
Transmission Net Work diagram showing all installations & facilities: Pipeline Terminal Stations Divisional Stations/HQ Stations SMS Repeater Stations Valve assemblies Major Road, Railway, Bridge or Barrage crossings Pipeline Diameters Approach from nearest highway, Railway Station or Airport cont ..
11

Transmission System
Right of Way ROW Dimensions at various sections of pipeline Net work Patrolling Procedure & Inspection Record Maintenance Record of ROW Work orders to Contractors - HQs/Terminal Stations. Encroachments reports and measures taken Pipeline Maintenance Periodical inspection & maintenance reports including thickness checks, Sleeving, Coat & Wrap repairs. Pigging arrangements locations and records. Hot tap/stoppling design, procedure and reports. Maintenance of Civil Structure and Protective Works records Valve Assemblies - Maintenance procedures and inspection records
12

Transmission System
b)

Compressor operation (operation planning and control only)

SSGC to provide: Compressor Operation Plan Vs Actual of last three years covering Un-interrupted running hours Standby time Down time for scheduled maintenance Log book or Shift Status Chart Daily Operation Activity reports transmitted to Zonal / Central Offices. Maintenance work records

13

Transmission System
c) Pre- Invoice verification of Gas source. Debit invoice including circular chart reading, strip chart reading, Gas volume calculations and transmission UFG. Post Invoicing verification of Gas supply Ref Doc - AGA REPORT 3, MNOP&R MODEL GSA SSGC to provide Gas Sales Agreements Billing Trail Circular charts Strip charts Gas chromatograph data

14

Transmission System
d) Filtering, Metering and pressure regulation arrangements Ref Docs - ASME B31.8 SECTION 803.3 / 853 SSGC to provide
P & IDs Filter design specifications and drawings Pressure regulators and meter data sheets

e) Operation data recording arrangements KT / other stations SSGC to provide


P & IDs and Instrument data sheets

15

Transmission System
f) SCADA System Data Acquisition from sources and SMSs SSGC to provide
Vendors Manual SOPs Records / Data

g) Meter Proving and maintenance Ref Doc - AGA Report No.3 & 8, AGA Report 9

SSGC to provide
Vendor manuals in-house SOPs Maintenance and calibration record

16

Transmission System
h) Joint calibration of custody transfer metering equipment at gas source Ref Doc - AGA Report, GSA with producers SSGC to provide
GSA Record of joint calibration

i) Joint calibration of SMS with Distribution Department Ref Doc - AGA Report No.3. SOPs SSGC to provide
SOPs Maintenance and calibration records

17

Transmission System
j) Gas Quality Monitoring Ref Doc - GSA SSGC to provide
GSA Gas chromatograph readings provided by seller

k) Operation and maintenance of Power Generating sets at Repeater stations


Ref Doc - SOPs / Vendor Maintenance Manuals SSGC to provide
Schedules Log books Maintenance report
18

Transmission System
l) Operation and Maintenance of construction equipment Ref Doc - Operations & Maintenance manuals SSGC to provide
Operation and maintenance manuals Maintenance record of individual machine Maintenance schedule

n) Transport Fleet Management

SSGC to provide
Fleet maintenance register Maintenance manuals.

19

Transmission System

M & o) Safety & Fire Protection & ERP: Ref Docs - NFPA Codes, API code
SSGC to provide HSE Manual Safety checklists Safety records Fire drill records Emergency Response Procedures Incident reporting procedures and records investigation procedures and records List of Safety & Fire Fighting equipment at each installation

20

Transmission System
p) Rehabilitation of Transmission lines (Coat & Wrap, Sleeving) Ref Doc - OGRA GTTS, ASME B31.8

SSGC to provide:
Thickness and PSP / HOLIDAY / DCVG Reports Sleeving, Coat & Wrap procedures and record

q) PCV remote operation through SCADA Ref Doc - Operation and maintenance manual. SSGC to provide:
Schematics Operation reports Operations and maintenance manuals
21

Transmission System
r) Pigging of pipelines wherever required
Ref Doc - ASME B31.8, SOPs SSGC to provide:
Pipeline schematic showing pig launching and receiving arrangements Pigging procedures and reports

s) Hot tapping / Stoppling Ref Doc - Operation & maintenance manuals SSGC to provide:
Hot Tap / Stoppling procedure and records

22

Transmission System

t) Daily / hourly maintenance of flow pressure data of Gas Control Refer item e of SOW

u) Maintenance of Civil Structure and protective works. Refer item a of SOW

23

Compression System

Compression System
a) Compressor Operations evaluation Ref Doc - API 616, API 617 SSGC to provide
Operation Manual / Design & As built Manual FAT report, performance curves Gas Turbine & compressor operating parameters recorded at normal / average operating conditions and at peak load

b) Compressor efficiency evaluation Ref Doc - API 616, API 617 SSGC to provide
Detail of studies carried out for improvement Recommendation & Implementation Methodology adopted & results of improvements
25

Compression System
c) Maintenance of equipment installed at compressor station Ref Doc - OGRA GTTS, ASME B31.8

SSGC to provide
Maintenance manual. In-house SOPs. Planned maintenance schedules vs. actual. Maintenance record of individual unit Maintenance report prepared after each overhaul / Scheduled inspection

26

Compression System
d) Controls of Gas Turbines SSGC to provide
Detail of studies carried out for improvement Recommendation & Implementation Methodology adopted and results of improvements.

e) Optimization of pipeline flow, pressure for better utilization of available horse power SSGC to provide
Detail of studies carried out for improvement Recommendation & Implementation Methodology adopted and results of improvements.

27

Compression System
f) Improvement of compression efficiency through restaging redundancy and standby equipment requirement to meet the goals and objectives / targets SSGC to provide
Detail of studies carried out for improvement Recommendation & Implementation Methodology adopted and results of improvements.

h) Gas Filtration facilities functioning Ref Doc - ASME B31.8, OGRA GTTS SSGC to provide
P & IDs Filter design specifications and drawings Filter element change-out frequency records
28

Compression System
i) Discharge cooling system functioning Ref Doc - API 661 SSGC to provide
Design data sheet Vendor data Discharge temperature Number of fans Operating Parameters recorded during normal / average condition and peak load / peak ambient condition. Winter data

j) Operations and maintenance of Generators installed at compressor stations SSGC to provide


Vendor manuals, operations Log, running hours, standby, downtime maintenance history of individual Gensets
29

Compression System
k) Designing, Planning and implementation work for revamping / De bottlenecking of Compressor stations SSGC to provide
Reports on modification for De-bottlenecking efficiency improvement. Plans for ongoing & those to be taken in hand in near future.

l) Fuel measuring facilities installed at compressor station


SSGC to provide
P & IDs Drawings SOPs Vendor manuals Operations Log Maintenance logs / reports
30

Compression System
m) Evaluation of overhauling function and appraisal of overhauling activities SSGC to provide
OEMs guidelines / Manuals, Drawings. Workshop facilitates availability of essential machines. Availability of requisite hand tools / special tools. No of overhauls carried out with / without OEM support. Maintenance reports including Post overhaul performance testing.

n) HSE condition at all the above mentioned activities


SSGC to provide
Refer items m,o of Transmission System
31

Corrosion System

Corrosion System
a) Physical and operating conditions of CP System installations vis-vis DC source (T/R, TEG units), ground bed (Horizontal, deep well ), Negative distribution box, drain point etc. SSGC to provide
Complete route map indicating CP system. Installed Equipment detail, Data sheets. Operations and maintenance Procedures and records

b) Calibration of the CP Measuring and Monitoring Devices. SSGC to provide


Maintenance & Calibration records of all CP Measuring and Monitoring devices. Measurement and calibration traceability Equipment manufacturer manual In-house calibration setup & procedures Pre-qualification of calibration service providers
33

Corrosion System
c) Testing of CP Isolation devices, insulating flanges SSGC to provide
Test record of insulating flanges

d) Pipeline Integrity Assessment through indirect surveys vis-vis Close Interval Potential (CIP) survey, Direct Current Voltage Gradient (DCVG) survey, Soil Resistively survey, Soil Analysis of the selected pipeline sections SSGC to provide
Record of integrity assessment surveys Recommendations and implementation reports

34

Corrosion System
e) Pipeline Integrity Assessment through direct examination of pipeline vis--vis, Bell Hole (visual coating inspection, pipe surface condition of the selected pipeline sections. SSGC to provide
Record of integrity assessment surveys Recommendations and implementation reports

f) Recommendation for CP System up-gradation and coating rehabilitation of the vulnerable pipeline section. SSGC to provide
Record of integrity assessment surveys Recommendations and implementation reports

35

Tele-communication System

Tele-communication Stations
a) Maintenance of the existing Telecommunication Network, comprising of Digital Microwave Back Bone Radio Link, Low Capacity Digital Spur Links, Single Channel Radio Telephone links and Base to Vehicle UHF Wireless Radio System for minimum outage time.

Ref Doc - ITUT standards or PTA regulatory authority code.


SSGC to provide
SOP Lay out diagrams Vendors Manuals Maintenance procedures Down time analysis reports Record for the calibration of test equipment License for getting required frequencies Spares record
37

Tele-communication Stations
b) Maintenance of existing SCADA system for reliable Data acquisition from Gas Sources, Sales Meter Stations, Compressor Stations, Repeater Stations and Remote Control Operation of Pressure Control valves and Mainline Block valves. SSGC to provide
SOP Lay out diagrams Vendors Manuals Maintenance procedures Down time analysis reports Record for the calibration of test equipment Procedure of calibrating the pressure, temp and flow from SMS, compressors stations and controlling the remote block valve operation.
38

Telecommunication Stations
c) Operation and maintenance of Digital Telephone Exchanges installed from SUI to Peshawar on our Microwave Radio Network. SSGC to provide
SOP Lay out diagrams Customer Manuals Spares record

d) Provision and maintenance of internet facilities in SNGPL through Companys dedicated radio network.

39

Tele-communication Stations
e) Routine calibration of SCADA instruments for Data Integrity SSGC to provide
Procedure adopted for the calibration of SCADA instruments Record of routine calibration performed on different instruments for the data integrity.

f) Planning, equipment indenting and Bid Evaluation of Telecommunication system.

SSGC to provide
Prequalification procedure for supplier Bid evaluation procedure

g) Planning and execution of new projects for up grading of the existing telecommunication system. SSGC to provide
Future plans and upcoming projects to upgrade the existing telecommunication system.
40

Distribution System

Distribution System
a) Laying of distribution mains and service lines Ref Doc - OGRA GDTS Sec-2 thru 4 ASME B 31.8 Sec 849, 850 & 852 SSGC to provide
SOPs Pipeline route, Layout drawings showing rail / road crossings QA/QC Procedure

b) Testing and commissioning of mains Ref Doc - OGRA GDTS Sec-5 SSGC to provide
Testing Procedure Test reports
42

Distribution System
c) Meter installation at different domestic, industrial and commercial customers Ref Doc - ASME B31.8 SECTION 848, OGRA GDTS sec 8.15 SSGC to provide
Installation Procedure Maintenance procedure and records Calibration procedure and records

d) Service line shifting Ref Doc - ASME B 31.8 Sec 849, OGRA GDTS Sec 8.20 SSGC to provide
Work Procedure Completion reports / log reports
43

Distribution System
e) Control valves maintenance Ref Doc - ASME B 31.8 Sec 841.126 SSGC to provide
Maintenance Procedure Maintenance register

f) Maintenance of regulatory stations Ref Doc - OGRA GDTS Sec 8.15 thru 8.19, ASME B 31.8 Sec 848 SSGC to provide
Maintenance procedure Maintenance register
44

Distribution System
g) Gas Leakage rectification Ref Doc - OGRA GDTS Sec 7.2 & 7.3 & 8.6, ASME B 31.8 Sec 851.3, 851.6 & 852.3 Appendix M SSGC to provide
Leakage Survey reports Leakage rectification Procedure Leakage rectification reports

h) Gas Quality Monitoring


Ref Doc - AGA Report No.3 SSGC to provide
Specs from GSA, Gas chromatograph readings
45

Distribution System
i) Meter proving at central metering shop and at mobile test van Ref Doc - AGA Report No.3 SSGC to provide
Meter proving Procedure and reports Practical demonstration

j) Maintenance of industrial, commercial and domestic meters


Ref Doc - ASME B 31.8 Sec 848, OGRA GDTS 8.15 SSGC to provide
OEM Manuals SOP's Maintenance record and reports

46

Distribution System
k) Maintenance of Town border stations, District regulatory stations and consumer meter station Ref Doc - OGRA GTTS Sec 8.15, ASME B 31.8 Sec 848 & 803 SSGC to provide
SOP's Maintenance manuals of individual equipment Maintenance records

l) Painting of over head crossings and service valves. SSGC to provide


SOP's Maintenance records
47

Distribution System
m) Material inspection test laboratory (If available) SSGC to provide
SOP's for individual tests and equipment used. Sample test report for individual item. Test record keeping system

n) Maintenance of construction equipment like welding plants, compressors etc SSGC to provide
Maintenance manuals Maintenance Schedules and reports

o) Transport Fleet Management Refer item n of Transmission System


48

Distribution System
p) Pipeline patrolling Ref Doc - ASME B 31.8 Sec- 851.2 SSGC to provide
Pipeline patrolling log book. Pipeline Patrolling Guidance note Report on special / abnormal situations noted during patrolling

q) Safety and fire protection at Area level

Refer item o of Transmission System

r) Preparation of master plan at regional level


Extent of Scope of work to be deliberated.

49

Procurement of Material & Equipment for Projects

Procurement of Material of Projects


Procurement SSGC to provide
Purchasing manual Procedure and criteria for prequalification of suppliers Tendering procedures Criteria for technical bid evaluation

Standard Specifications SSGC to provide


RFQs, P/Os Technical Evaluation Test / inspection Reports

51

Procurement of Material of Projects

Customized Specification - Manufacturer certificates for Q.A

Technical Evaluation - Technical Evaluation Procedures


In-house Quality Assurance - In-house QA Procedures Inspection - In-house Inspection Procedures

52

Customer Service Response & Operation

Customer Service Response & Operation


Performance Standards
Gas Emergencies Telephone Calls Complaints Investigation of Pressure Complaints Making and Keeping Appointments Notification of Planned Work Connection to Distribution System Energy / Safety advice Replies to correspondence Visits Estimating Procedures for billing Meter alteration & replacement at consumers request Responding to meter problems

54

Customer Service Response & Operation


Performance Standards
Meter Accounts (Meter reading / billing ) Meter Reading Frequency Special Meter Readings Appointment for reading Providing additional meter Notifying consumer for non-payment Termination of service for default Reconnection after payment of dues Refunds to the Consumers Backfill, Restoration

55

Customer Service Response & Operation


SSGC to provide
Customer response manual/ Guidelines / Procedure Customer response facilities / Location Customers complaint record and close out formats. Customers complaints visit reports Connection restoration records after payment dues.