AIR CONSERVATIONS
Action taken for Air Conservation 1. Complete layout of Air Compressors changed , made common header with minimum Bands . 2. Steel layered flexible used in weld shop in place of PU pipes to control the wastages Of air . 3. Switching Off the air compressors in lunch / dinner break. 4. Separate air line provided in paint kitchen. 5. Educated operators for air conservations
Units
90000
80000 70000 60000 50000
83637 65004
40000
30000 20000 10000 0
May
June
July
August September
Month
Net saving of 33625 units ( Rs 184937.00 / Month) , compare from May to Sept11
1.Mig Welding M/C- Card & Wire feeder B/D : Critical spares inventory and stand by MiG m/cs maintained. Also earthing improved for protection of circuit cards. 2.Old drilling and boring m/cs with contactor based control : Technology upgraded by PLC provision. 3.Line captains scheme implemented in deptt. 4.Strongly Preventive Maint. Implemented. 5.Keeping Min / Max level of Critical spares in Maint stores. 6.Training given to Maint technicians. 7.Motivated the team.
Total Available Hrs. in month of May11 Plant Run @ 25 days Total Break down in month Actual Production Hrs. Total Sale in month Per Hrs. Loss Loss Due to Breakdown Man hours Loss Actual Total Loss Total B/D hrs in Sept Net saving ( May Spt11)
36180 Hrs. 30150 Hrs. 363.52 Hrs. 29695 Hrs. 220000000 Aprx. 7296.8 2652550.6 185200 2837750.6 301 Hrs 62.52 Hrs
4561959 Rs
1.Power distribution system improved. 2.Compressor shifted to save wastage ,55 KW air compressor has been spared. 3. Plant running in two shifts instead of three shifts. 4.Electricity wastage reduced by switching off lights / fans / ACs / machines during lunch & dinner time. 5.Power saving LED lights to be introduced in place of conventional tube lights
Sep11 - Rs 3384402
WATER CONSERVATIONS
Action taken for Water Conservation 1.Wastage of water due to over flow of over head tanks, water leakage in canteen, paint shop. 2. Automatic water level sensor provided in overhead tanks.
400 350 300 250 200 150 100 50 0 May'11 June'11 July'11 Aug'11 Sep'11
375 315
307
263 251
Water consumption reduced to 251 KL/Day about 30% saving approx Rs 33480 .00 /month.
Power Factor
0.98
0.99
0.98
1.We have added capacitor banks 2. Replace the weak / dead capacitors
0.4 0.2 0
3. Power Factor correction replay was not working in Auto mode , it was corrected Net saving = Rs 40000.00 per month in electricity bill & image of Omax Auto will improve
May'11
June'11
July'11
Aug'11
Sep'11
70000 60000 50000 40000 30000 20000 10000 0 2900 May'11 June'11 July'11 Aug'11 Sep'11
2.
3.
4.
21.2
2.
3. 4.
MAY 11
JUNE 11
JULY 11
AUG 11
SEP 11
2.
3.
4.
5.