Module Objectives
Sort, Set, and Shine a work area
Describe how to Standardize and Sustain the 5S process Suggest visual displays and controls for your work area

5-S Overview
Sort
Set Shine

Standardize
Sustain

Whats in it for me?


Pleasant work environment Standardize the work Safe workplace

Benefits to the Organization


Lower costs

Improved safety
Higher quality Improved moral

Easier to manage exceptions


Broader involvement Faster response

Foundation for improvement


Credibility with customers, suppliers and workers
5

What is 5S and Visual Factory?


Methods that enable people to quickly recognize standards and deviations
Visual Control Visual Display

5-S

5S Foundation
Visual Control Visual Display

5-S

5-S is!
Sort Set

Shine
Standardize Sustain

Sort
Removes clutter. Exposes hidden issues, and keeps the workplace equipped with material that is really needed to do the job. Every item in the work area is examined
Examine the work area Determine what is needed Remove unneeded items

Sort
(Continued)

Process Unneeded Items


Discard unneeded items
Red Tag - interested parties need to agree on final disposition Move to a Central Holding Area

10

Tag All Equipment


Red Tag = Not being used actively move to impound area for scrap rationalization. Include on tag: Where item came from. How many items are available. Who needs to be involved in the rationalization When the item was tagged. Yellow Tag = Move to a central location for presentation when required. Mark on the card the date and location the item came from and where it goes. Green Tag = Temporary tag designates equipment remains in the area. Mark location and date on card.
11

Sort
(Continued)

Red Tag Items


Process quickly (within a week) Involve all interested parties Remove tag when decision reached Discard or move to a Central Holding Area

12

Select An Impound Area for Scrap Consideration


Identify a "keeper" for the impound area Define a process to place items into the impound area Determine a procedure to scrap, sell, or return unneeded items
Red Tag items - require input from other people before the final "keep, move, or dispose" rationalization can be complete. Process quickly - within a week.

Define a process to remove something from the impound area.


13

Select A Central Storage Area


Organize items to easily find, retrieve, use and return to their home location.

Attach a permanent identification tag to movable items designating:


Where located when not in use

Where located when in use


Display a color-coded map for quick location of items

14

Set
"A place for everything and everything in its best place."
Having all items set in place directs more time to processing and satisfying the customer rather than search and retrieval In others words it reduces nonvalue added time.

Arrange items
Find easily and quickly See what and how many Retrieve and return

15

Set
(continued)

Organize all items so there function and location becomes intuitive


Organize items to easily find, retrieve, use and return to their home location Color code equipment and location for intuitive retrieval and usage Determine how location of equipment, material and aisles will be marked

16

Set
(continued)

Set what belongs there


How many belong there? Whether something is missing?

Design a permanent identification tag and attach one to each movable item that remains in the area.
Where located when not in use.

Where located when in use.

17

Shine
Expose hidden issues such as broken or worn tools / machines, excess inventory, missing tools or supplies, building foundation defects. Clean your workplace Remove dust, dirt, and debris Paint if necessary Expose health, safety, maintenance issues people and equipment Cleaning is a form of inspection

18

Standardize
To facilitate the spreading of "workplace organization and visual factory" to all areas. Cleaning is inspecting for Total Productive Maintenance. Spread throughout the workplace Build into regular work processes
Cleaning schedules 5S assignments

19

Standardize
(continued)

Create a plan to keep the area clean. Establish standard cleaning schedules using frequent, short amounts of time for everyone, every shift. Establish cleanliness standards.
Employee developed standards that define what an area looks like when it is clean Vs dirty.

20

Standardize
(continued)

Develop and post a reaction plan for any discovered abnormality, during production or cleaning. Who is to be contacted first. Who needs to be communicated to on the abnormality.

Can the abnormality be corrected immediately?


How will the correction be communicated when completed.

21

Sustain
The 5S process is internalized, used and enforced by everyone.
Make cleaning an intuitive way to maintain the elimination of waste.

Monitor and enforce - by everyone Self-discipline

22

Continue 5S Throughout the Facility


Determine Area Plan for implementation using the "Boundary Sample" and developed standards as the guide Determine schedule for Plan Give area employees the overview of 5S and Visual Factory Review the Boundary Sample with implementers Review standards for effectiveness
23

Visual Factory Overview


Visual factory uses visual displays to communicate and visual controls to enforce compliance

24

Visual Factory
Visual Displays
Lines and colors

Shapes and sizes


Pictures, signs, icons, labels, silhouettes

Lights, audible tones

Visual Controls
Interfere and enforce behavior

25

Visual Displays and Controls


Displays communications and enforces behavior Communicates with little or no words to both employees and management.. Determine standard for lines and colors. Determine standards if shapes are to be use as communication. Determine standards for Employee information displays.
26

Cross Reference Color to Equipment


By Style?
By Part? By Family? By point of use?

27

Determine Lighting and Audible Standards


Andon

Autonomation
Workstation lighting Signals

28

Documentation
Include:
Standardized Work Combination Table

5S Standards and Maintenance sheets


Reaction Plan Part and Quality information

Safety information

29

Example: Signaling
Zone
STATION 1 STATION 2 STATION 3

STATION 4

STATION 5

STATION 6

Station
Green = No problems Yellow = Warning, need assistance Red = Critical, line stopped

30

Colored Coded Bins for Stock


Designate a family of parts
Designate a tube diameter Designate a product type e.g. "Bake and Broil"

31

Determine "Autonomation" Standards


Machines audibly notify if action is incorrect

32

Initiate
Develop Boundary Sample
Select a location of one operation to be used as the Boundary Sample for all of the workplace organization.

33

Example: Work Station Boundary


Develop a delivery address system
Support Pull

Develop ideal Job Board


Examples of postings: Std. Work Combination tables Key work elements and customer info Sustain assignments

34

Example: Work Station Boundary


(continued)

Determine what should be and not be in an ideal work station e.g. :


Electrical outlet
Personal factor Coats, purse, lunch bags, etc.

Determine how floor marks achieved

35

Management 5's CheckSheet Theme: Process Item 1. Are only necessary items on the work surface? 2. Is the current status of work visible? 3. Are 5S responsibilities assigned to each team member? 4. Does support equipment have a location? 5. Does the location address follow the standard address system? 6. Are inventories maintained using min./max and FIFO? 7. Is the equipment and machine; clean? 8. Are the contents of cabinets identified? 9. Is in process work identified as to status, and who is doing the work? 10. Are machines reviewed, and their condition documented? Judge Abnormality Dept/Area______ Kaizen

Sets new standard OK, or good condition Needs Improvement No Good

Comment-What sets it apart from std. No comment necessary Comment in Kaizen column What is wrong, and how to improve

36

Application Assignment

37

Summary
5S and Visual Factory are two foundational strategies of lean manufacturing. They make rapid identification of abnormalities and rapid response possible. They are key to the implementation of standardized work. They improve safety, moral, and quality. 5S and Visual Factory are the first big steps toward reducing costs in our operations.

38

Tools

39

Management 5's CheckSheet Theme: Process Item 1. Are only necessary items on the work surface? 2. Is the current status of work visible? 3. Are 5S responsibilities assigned to each team member? 4. Does support equipment have a location? 5. Does the location address follow the standard address system? 6. Are inventories maintained using min./max and FIFO? 7. Is the equipment and machine; clean? 8. Are the contents of cabinets identified? 9. Is in process work identified as to status, and who is doing the work? 10. Are machines reviewed, and their condition documented? Judge Abnormality Dept/Area______ Kaizen

Sets new standard OK, or good condition Needs Improvement No Good

Comment-What sets it apart from std. No comment necessary Comment in Kaizen column What is wrong, and how to improve

40

Red Tag

41

Develop an Address System to Facilitate Location and "Pull"

42

Standardization Worksheet Questions to Ask


Is the material flow obvious?

Is the material presentation obvious?


Raw materials Current job running Next job to be run

43

Questions (contd)
Component parts? Current job running? Next job to be run? Are all designated material storage areas marked for Min./Max?

44

Questions (contd)
Are floor Markings adequate and to standards? Is the layout obvious? Are the boundaries of the operation to area obvious? Is the location for all moveable equipment obvious?
In the work area? In central storage area? Is equipment tagged for working and central storage location?
45

Questions (contd)
Is there:
An obvious location for operator's personal gear?
Area designate for scrap?

Area designated for donnage?


Area designated for container storage? Empties for current job?

Empties for the next job?


Full containers?
46

Other Important Questions


Is changeover equipment in place and clearly marked?
Is there an area for external changeover designated and marked? Are all necessary tools and equipment clearly marked and storage designated?

47

Are Housekeeping Expectations Obvious?


Is there a posting of required duties? Is there a check sheet for completed requirements? Are related housekeeping tools and materials in obvious areas?

48

Is There an Area Employee Information Board Displayed?


Standardized Work sheet displayed?

Quality Info Displayed?


ISO info Xbar & R charts Communications? Safety information

49

How Do They Know if it is a Good Part?


Boundary sample area designated? Checking fixture or tools located near the job? Check sheets posted noting periodic checks?

50

Exercise
Why 5S?

51

Exercise:
Set and Shine...

52

Exercise:
Standardize and Sustain...

53

Displays and Controls


Displays - communicate

Controls - enforce

54

Example: Monitoring
1 2 3 4 5 6

55

Example : Andon System


Andon Board
PROCESS 1 PROCESS 2 PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

Plant Floor
Process 1

PROCESS 7

PROCESS 8

Spare

Spare

Spare

Spare

Board should be visible from both sides Procedure The operator calls his supervisor by depressing the yellow button. The Andon illuminates yellow at the desired station and a chime sounds. The supervisor responds quickly to the process to decide what action should be taken. He will either disengage the yellow button or depress the red button. The Andon board will reflect the status of the process at this point. Red means the line is down and green means the line is running.

56

Example: Andon Board for Assembly


Line Name

1 1

2 2

3 3

4 4

5 5

6 6

QC

Material
Changeover Conveyance

57