Phases of the Project

Analysis and Design Development/Construction Testing/Defect Fixing

-2-

INTERNAL

Analysis and Design

ETVX for Analysis and Design


Entry: - NSEP Case Study - Standards and guidelines for Use cases,Sequence diagram,SRS.

Activities: - Requirement Analysis Analyzing the problems and identifying requirements that would solve the stated problems - Preparation of Use-Cases - Preparation of HLD like Domain diagram,class diagram - Preparation of LLD like sequence diagram - Creation and finalization of database design - Preparation of SRS document - Preparation of the first draft of System Test Plan(STP)

-4-

INTERNAL

ETVX for Analysis and Design


Verification/Validation: - Review the SRS document - Review of HLD and LLD - Review the System Test Plan Exit: - SRS document is complete - Reviewed HLD and LLD exists - Database Design document is prepared - Initial version of the System Test plan exists Work Items/Deliverable: - SRS Document - Sequence diagram

Document Name SRS Document v1.0

SVN Link
https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/ p1/groupb/document/

-5-

INTERNAL

Development/Construction

ETVX for Development/Construction


Entry: - SRS, HLD and LLD documents are available. - Database design document is available. - Standards for construction are available.

Document Name SRS document v1.1 Database design document v1.0


Activities:

SVN Link
https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/ p1/groupb/document/ https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/tr unk/p1/groupb/project/groupB.sql

- Conduct meeting for code design of development phase - Prepare detailed plan for development phase(Sub-module division and assigning tasks) - Development of application is done based on SRS and design documents

-7-

INTERNAL

ETVX for Development/Construction


- Conduct Project Status Report meeting - Prepare Project Status Report - Conduct team meeting for casual analysis

Verification/Validation: - Review/Walk through the code - Review the unit test results - Review of code against Code review checklist.

Document Name Programs Code review checklist

SVN Link
https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/tr unk/p1/groupb/project/nsep_account_management/ https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/tr unk/p1/groupa/document/EQA/

-8-

INTERNAL

ETVX for Development/Construction


Exit: - Reviewed code is available - Unit tested programs are available.

Work Items/Deliverables:

Document Name Programs SRS document v1.1 Code review checklist

SVN Link
https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/tr unk/p1/groupb/project/nsep_account_management/

https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/tr unk/p1/groupa/document/EQA/

-9-

INTERNAL

Testing/Defect Fixing

ETVX for Testing/Defect Fixing


Entry: - Program code is obtained - Traceability matrix, Program code, Functional test cases

Document Name SRS document v1.1 Program

SVN Link

https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/tr unk/p1/groupb/project/nsep_account_management/

- 11 -

INTERNAL

ETVX for Testing/Defect Fixing


Activities: - Testing and defect fixing of the developed application is done - Code review document is prepared - Conduct System Test - Prepare Unit test cases by refining Functional test cases - Prepare Defect log - Log defects in Bug tracker - Fix defects and log the same in Bug tracker

Verification/Validation: - Reviewing the System Test Plan. - Reviewing the defect log.

- 12 -

INTERNAL

ETVX for Testing/Defect Fixing


Exit: - System Test Plan is updated. - Defect log is created. Work Items/Deliverable:

Document Name Defect Log v1.0

SVN Link
https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/tr unk/p1/groupa/document/Defect%20Logs/

- 13 -