Вы находитесь на странице: 1из 28

Individual Management

Experience
Electric Power Distribution Management

ENGR. ABDUL LATIF ANJUM


ADD. MANAGER (TECH.)
KASUR CIRCLE.

Acknowledgement
Almighty Allah

The Faculty
My fellows OF 79th MMC at WASC

Objectives

Line Loses
Recovery
Tripping
Damaged Transformers
Fatal / Non Fatal Accidents

Self Introduction
Name:

Abdul Latif Anjum

Add. Manager (Tech.)


Kasur Circle.

Qualification:

B.Sc Elect. Engg. Power

Date of Joining: 12-03-1983


Experience:

28-Years

Area of Jurisdiction
Shah Kot city;

Situated at 52km from


Sheikhupura.

It consists of 6 Nos. sub divisions


1)
2)
3)
4)
5)
6)

Shah Kot city


Gulistan colony
Panwan
Manawala
Sangla hill
Ahmad abad

TARIFF WISE CONNECTIONS


06-2006
Consumer
Type

Domestic

Tube
well

Bulk

Tariff

01(A-1)

04(A-2)

B-1 to B-4

46/49

80567

7539

571

86.16

8.06

NO

2755

% age

No

Active

Commercial

Industrial

Street
Light

Others

C-1 /C-2

H, etc

499

16

89197

0.61

0.53

0.00

0.02

0.00

95.39

882

255

420

4314

2.95

0.94

0.27

0.45

0.00

0.00

0.00

4.61

83322

8421

826

919

16

93511

89.10

9.01

0.88

0.98

0.00

0.02

0.01

100.00

Total

% age

Discon

Total
% of Total
Consumer

Active

= 95.39 %

Disconnected = 4.61 %

Break up of Industrial Consumers


Active Disc
Total
1. B-3 =
9
1
10
2. B-2 =
70
10
80
3. B-1 =
492 244
736

Line Losses

PROGRESSIVE LINE LOSSES


IN RESPECT OF SHAHKOT DIVISION
UPTO JUNE 06 VS UPTO JUNE 05
Name of
S/Divn

UNITS RECEIVED

UNITS
BILLED

UNITS
LOST

2006

2005

2006

2005

2006

2005

Shahkot

82.40

76.15

76.78

70.31

5.61

Gulistan

116.44

102.61

111.62

97.65

Manawala

38.87

35.15

34.22

Panwan

30.01

27.51

Sangla Hill

28.77

Ahmad Abad

24.95

MKWH

%AGE LOSSES % AGE


INC/
DEC

2006

2005

5.84

6.8

7.6

-0.8

4.81

4.96

4.1

4.8

-0.7

30.38

4.65

4.77

12.0

13.6

-1.6

25.78

23.34

4.23

4.17

14.1

15.1

-1.0

27.28

25.09

23.53

3.68

3.75

12.8

13.7

-0.9

24.40

21.36

20.94

3.58

3.46

14.4

14.1

0.3

Shahkot
321.42 293.04 294.86 266.15 26.56 26.89 8.3
Divn

9.2

-0.9

Efforts For Reduction in Losses


1.
2.
3.
4.
5.
6.
7.
8.

Charging of detection bills


Lodging of FIRs against energy stealers
Maintenance of System
Area Planning of 11 KV feeders
Bifurcation of 11 KV feeders
Re-conductoring of overloaded / off size
conductor
Replacement of defective meters
Installation of 11KV capacitors

Recovery

MONTHWISE PROFILE OF RECEIVABLES IN RESPECT OF SHAHKOT DIVISION


JUNE-2006
Amount in Million

Receivable
Name of Month /
Divn
Year

Govt. Private Total

Running Defaulters
Spill
Deferr: P/Disc
Over

Govt Private Total

2006

0.80

60.79

61.59

51.47

0.74

3.21

0.06

5.93

5.99

2005

0.20

64.50

64.70

52.70

1.14

4.89

0.17

7.07

7.24

Shahkot

PROGRESSIVE BILLING & COLLECTION IN RESPECT OF SHAHKOT DIVN


UPTO JUNE-2006 VS UPTO JUNE-2005

Name of
S/Divn

Shahkot
Gulistan

Manawala
Panwan
Sangla Hill
Ahmad Abad
Shahkot Divn

Month
Billing (MRs)
&
Year Govt
Pvt
Total

Collection (MRs)
Govt

Pvt

% Age Collection of
Billing

Total

Govt

Pvt

Total

Spill
Over

06/06

12.72

297.38

310.10

12.65 299.55

312.20

99.45

100.73 100.68 18.38

06/05

13.51

274.97

288.48

13.64 274.15

287.79

100.96

99.70

99.76

20.48

06/06

13.74

418.33

432.07

13.66 417.42

431.08

99.42

99.78

99.77

20.42

06/05

12.99

383.45

396.44

12.90 367.38

380.28

99.31

95.81

95.92

19.29

06/06

14.34

120.27

134.61

14.13

119.54

133.67

98.54

99.39

99.30

4.29

06/05

10.93

105.90

116.83

10.97 105.28

116.25

100.37

99.41

99.50

3.61

06/06

14.12

79.65

93.77

14.07

81.26

95.33

99.65

102.02 101.66

3.42

06/05

12.56

72.26

84.82

12.91

72.01

84.92

102.79

99.65 100.12

3.99

06/06

14.99

91.33

106.32

14.02

92.74

106.76

93.53

101.54 100.41

1.88

06/05

14.18

85.10

99.28

13.84

84.83

98.67

97.60

99.68

99.39

2.58

06/06

3.45

78.20

81.65

3.48

78.98

82.46

100.87 101.00 100.99

3.08

06/05

4.17

78.63

82.80

4.13

78.19

82.32

99.04

2.75

99.44

99.42

06/06 73.36 1,085.16 1,158.52 72.01 1,089.49 1,161.50 98.16 100.40 100.26 51.47
06/05 68.34 1,000.31 1,068.65 68.39 981.84 1,050.23 100.07 98.15 98.28 52.70

PROGRESSIVE COMPUTED BILLING & COLLECTION IN RESPECT OF SHAHKOT DIVN


UPTO JUNE-2006 VS UPTO JUNE-2005

Name of
S/Divn

Shahkot
Gulistan
Manawala
Panwan

Sangla Hill
Ahmad Abad
Shahkot Divn

Month
& Year

Billing (MRs)

Collection (MRs)

Govt

Pvt

Total

Govt

06/06

12.73

299.47

312.20

06/05

13.50

263.86

06/06

13.75

06/05

Pvt

% Age Collection of
Billing
Pvt

Total

Govt

12.65 299.55

312.20

99.37 100.03 100.00 18.38

277.36

13.64 274.15

287.79

101.04 103.90 103.76 20.48

417.19

430.94

13.66 417.42

431.08

99.35 100.06 100.03 20.42

12.98

377.95

390.93

12.90 367.38

380.28

99.38

97.20

97.28

19.29

06/06

14.36

119.57

133.93

14.13 119.54

133.67

98.40

99.97

99.81

4.29

06/05

10.91

105.14

116.05

10.97 105.28

116.25

100.55 100.13 100.17 3.61

06/06

14.16

80.18

94.34

14.07

81.26

95.33

99.36 101.35 101.05

3.42

06/05

12.53

72.02

84.55

12.91

72.01

84.92

103.03 99.99 100.44

3.99

06/06

14.96

92.06

107.02

14.02

92.74

106.76

93.72 100.74 99.76

1.88

06/05

14.14

84.83

98.97

13.84

84.83

98.67

97.88 100.00 99.70

2.58

06/06

3.49

77.83

81.32

3.48

78.98

82.46

99.71 101.48 101.40

3.08

06/05

4.15

78.60

82.75

4.13

78.19

82.32

99.52

2.75

06/06

73.45 1,086.30 1,159.75 72.01 1,089.49 1,161.50 98.04 100.29 100.15 51.47

06/05

68.21

99.48

982.40 1,050.61 68.39 981.84 1,050.23 100.26 99.94

Total

Spill
Over

99.48
99.96

52.70

Efforts For Recovery


1.
2.
3.
4.
5.
6.

Distribution of energy bills well in time


Implementation of
CP112N, CP112
and CP114
Pursue payment of Tube wells and Industrial
customers.
To watch list of Rs. > 10,000/-, 50,000/-,
100,000/- and 500,000/- on priority basis.
Redressal of consumer complaints regarding
correction of bills at earliest.
Feeding of documents / information to
computer with out any fail

Trippings

56

PROGRESSIVE COMPARISON OF TRIPPINGS


I.R.O SHAHKOT DIVISION (07-05 TO 06-06)

Sub
Division

JULY-05

July-04

To

To

June- 06

June-05

Decrease /
Increase

Remarks

Total

Total

Total

315

325

10

321

331

-6

-6

31

427

458

12

482

494

19

-55

-36

MANAWALA

11

379

390

15

399

414

-4

-20

-24

PANWAN

219

223

276

280

-57

-57

SANGLA HILL

16

442

458

33

421

454

-17

21

AHMAD ABAD

16

320

336

39

324

363

-23

-4

-27

Shah kot
Division

88

SHAHKOT

10

GULISTAN
SHAHKOT

2102 2190

113

2223 2336

-25 -121 -146

Efforts For Best Quality and


Continuity of Supply
1.

To ensure the implementation of scheduled


maintenance program

2.

Tree trimmings

3.

Replacement of off size conductors

4.

Mid spanning of lengthy spans

Damaged Transformers

57

TRANSFORMER DAMAGED
AND RETURNED TO STORE
JULY 2005 TO JUNE - 2006
CAPACITY OF TRANSFORMERS
DESCRIPTION

DAMAGED

RETURNED
TO STORE

TOTAL
06-2005

06-2006
200
KV
A

100
KVA

50
KVA

75
KVA

KVA

NO

KVA

BBF

15

CURRENT MONTH

PROGRESSIVE

BBF

CURRENT MONTH

PROGRESSIVE

25

NO

KVA

1750

22

2300

500

450

18

2250

27

2950

15

1750

22

2300

500

450

18

2250

27

2950

Efforts For Reducing the Rate of


Damaged Transformers
1.

Proper maintenance.

2.

Load balancing

3.

Up-gradation of capacity.

Fatal / Non Fatal Accidents

FATAL/ NON FATAL ACCIDENTS


EMPLOYEES
FATAL

MONTH

PUBLIC MEN

NON- FATAL

FATAL

ANIMALS

NON-FATAL

FATAL

200506

200405

200506

200405

2005-06

2004-05

2005-06

2004-05

2005-06

2004-05

July

Aug

Sep

Oct

Nov

Dec

Jan-06

Feb

Mar

April

May

JUNE

TOTAL

63

Efforts To Save Human Lives


1.

Observation of Safety Policy

2.

Arrangement of PPE

3.

Education / Training to the Workforce.

Conclusion

THE SHAH KOT DIVISION WAS


DECLARED AS
BEST DIVISION OF LESCO

Questions, if any?

28

Вам также может понравиться