for: 72% of electricity consumption, 39% of energy use, 38% of all carbon dioxide (CO2) emissions, 40% of raw materials use, 30% of waste output (136 million tons annually), and 14% of potable water consumption. http://www.usgbc.org/DisplayPage.aspx?CMSPage
Healthy
Protect occupant health and increase
productivity
Minimize waste Designed and constructed in a manner that minimizes waste, pollution, and environmental degradation
Environmental Design (LEED) National Association of Home Builders (NAHB) Green Globes Earthcraft
environmental issues Third party verification of achievement Qualify for state and local government initiatives Receive marketing exposure through listing on USGBC website
LEED
Most popular and widely known certification Provides third party verification Variety of rating systems for different
applications
Most popular are LEED for new construction,
LEED Credits
Six Categories: Sustainable Sites (14), Water
Efficiency (5), Energy & Atmosphere (17), Materials & Resources (13), Indoor Environmental Quality (15), Innovation and Design (5) Prerequisites & Credits LEED Certified (26-32), Silver (33-38), Gold (39-51), and Platinum (52-69) http://www.usgbc.org/DisplayPage.aspx?CMSPage
LEED in Florida
http://www.floridagreenbuilding.org/db/?q=node/701
practices to obtain the work Address land use, zoning, and environmental issues Handle any potential litigation which may arise
Captains Galley
Capatains Galley
http://thecaptainsgalley.com/ Shaw Development recently filed for
Bankruptcy
Only 3 units are under contract, the restaurant
http://www.easternshorehousing.com/Blogs/Eastern_s
recently closed due to a dispute with Shaw Units now selling for $247,000 a nearly 50% reduction
United States Not truly about failure to obtain certification but rather importance of proper contracting
Litigation
Facts
Shaw hired Southern to construct a 23 unit
condominium to be built to LEED Silver Original price was 6.9 Million Dollars Southern paid 7.45 Million Dollars with change orders Financing obtained totaled 8.97 Million Dollars Nearly 9 months after the date set for substantial completion still not complete
Litigation Facts
Loans placed in default Bank seeks 10.298 Million Dollars $416,000 in late fees Interest accruing at nearly $3,000 per day $635,000 in tax credits not obtained as a
language to ensure or encourage LEED Working out credit issues Bringing a dose of reality to clients who still wanted to sell at peak prices