LADAKH RENEWABLE ENERGY HYDEL PROJECTS

Ladakh Renewable Energy Development Agency (LREDA) LAHDC-LEH

HYDRO POWER PROJECTS


The MNRE is implementing a number of Renewable Energy Projects in Ladakh 22 Small/Mini Hydro Projects (MHPs) has been identified/ sanctioned for the Development of Hydro-Electric Projects LREDA has identified/selected 22 MHP sites in Leh district according to the Potential sites at remote/Hilly area. Total capacity to be Installed is around 12.85 MW, which will result in saving of 200 Lacs litres of diesel per year LREDA-LAHDC is the nodal agency of MNRE for the implementation of MHP projects with generation capacity up to 2 MW The target for the completion of these MHP is three working seasons (commissioning by the end of 2012-13)

SITES OF MINI/MICRO HYDRO PROJECTS


SIACHEN RIVER

SHAYOK MHP CLUSTER

SIACHEN MHP CLUSTER

WARIS I (300 kW) HENACHE (600 kW) SHAYOK RIVER WARIS II (1200 kW) WARIS III ( 1200 kW) SASOMA (3000 kW) CHALUNKHA (800 kW) * BOGDANG (800 kW) STAKSHA (600 kW) TURTUK I (500 kW) * TURTUK II (600 kW) SKURU(300 kW) * CHAMSHEN(450 kW) TIRITH (200 kW) TSATI (500 kW) KHARDONG (500 kW)

33 kV Gridline (Tyakshi to Diskit)

RONGDO (3000 kW)


PHOBRANG (150 kW) * SHAYOK (300 kW) * DURBUK I (500 kW) * SUMDA DO(200 kW) DURBUK II (500 kW) TANGSTE (600 kW) *

DURBUK MHP CLUSTER

Survey Investigation and Preparation of DPR


The survey investigation and preparation of Detailed Project Report has been carried out before the execution of the project works The work of survey, investigation and preparation of project report of : 1. Siachen MHP Cluster was allotted to M/S Prem Sagar, Chandigarh 2. Shayok MHP Cluster and Durbuk Cluster was allotted to M/S Mehdaj Techno Concept Pvt. Ltd, Delhi

Surveying for MHPs

SIACHEN MHP CLUSTER


S No Name of Site/Capacity Status of Survey Work Status of Detail Project Report (DPR) Agency for Survey and Investigation M/s Prem Sagar, Govt. Contractor, Chandigarh Note: Construction Drawings are yet to be Received for all the Projects 1 2 3 4 5 6 Tsati MHP /(500 KW) Tirith MHP/(300 KW) Henache MHP/(600 KW) Khardong MHP/(300 KW) Sasoma MHP/(3000 KW) StakshaMHP/(400 KW) Completed Submitted Completed Completed Completed Completed Completed -Do-Do-Do-Do-Do-

7
8 9

Chamshen MHP/(450 KW)


Rongdo SHP/(3000 KW) SumdhaDo MHP/(300 KW)

Completed
Completed Completed

-Do-Do-Do-

SHAYOK MHP CLUSTER


S No. Name of Site/Capacity Status of Status of Survey Work Detailed Project Report (DPR) Completed Completed Completed Completed Submitted -Do-Do-DoAgency for Survey and Investigation M/s Medhaj Techno Concept Pvt. Ltd. Noida, UP 1 2 3 4 Bogdang MHP/(800 KW) Turtuk II MHP /(600 KW) Chalungka MHP/(800 KW) Turtuk I MHP/(500 KW)

5
6 7 8

Skuru MHP/(300 KW)


Waris I MHP/(300 KW) Waris II MHP/(1200 KW) Waris III MHP/(1200 KW)

Competed
Completed Completed Completed

-Do-Do-Do-Do-

Note: Construction Drawings are yet to be Received for all the Projects

DURBUK MHP CLUSTER


S No Name of Site/Capacity Status of Survey Work Completed Status of Detail Project Report (DPR) Submitted Agency for Survey and Investigation M/s Medhaj Techno Concept Pvt. Ltd., Noida, UP 1 Durbuk II MHP/(300 KW)

2
Durbuk I MHP/(700 KW) 3 Tangste MHP/(500 KW) 4 Shayok MHP/(300 KW) 5 Phobrang MHP/(150 KW) Completed -DoCompleted -DoCompleted -DoCompleted -Do-

Note: Construction Drawings are yet to be Received for all the Projects

Project Work in Three Parts


For Execution of project works, the Mini-Hydel Projects (MHP) are being tendered in three parts (Only 6 MHPs) are as:

1. Construction of Civil Complex Work (Head Works, Approach


Channel, Desilting Basin, Power House and Tail Race.

2. Penstock Works (Including its Civil work related with Penstock) 3. Electro -Mechanical Work (Inclusive of all Mechanical and Electrical work
involved in it)

Execution of remaining project works are being tendered on turnkey basis (Including Civil, Penstock and E&M works)

List of Civil Work Allotted


Sr.No. Name of Mini-Hydel Name of the Projects with Agency capacity Contractor/Firm 1 Tsati MHP 2x250 Henachi MHP 2x300 KW Chamshen MHP 2X225KW Bogdang MHP 2x400KW Chulungkha MHP 2x400KW Turtuk-I MHP 2x250KW M/s Prem Sagar Chandigarh M/s Prem Sagar Chandigarh M/s Kacho Nissar Leh M/s Mohd Mussa Leh M/s Tonyot Tashi Leh 06 Dt:31-05-11 Allotted Cost of Civil Work (Lacs) Time of Completion

196.1

31st Oct.2012

238.0
-Do-

3
4 5 6

228.00
220.00 220.00 Re-Tendered -Do31st Sep. 2013 -Do-

Work on pre-infrastructure, like Construction of approach road has been started. Earth Work is being executed.

The Execution of Civil Works at Site

Power House Site of Henache MHP

Sr.No. Name of Mini-Hydel Projects with capacity


1 Tsati MHP 2x250 Chamshen MHP 2X225KW Henachi MHP 2x300 KW Bogdang MHP 2x400KW Chulungkha MHP 2x400KW

N I T for Execution of Penstock Work


NIT No. Status of the Tender & Under Evaluation Date of NIT/Re(Allotting date) tendered 16Sept. 09 15th March.12 Dt:27-06-11 10 Dt: 27-06-11
11 Dt: 27-06-11 12 Dt: 28-06-11 13 Dt: 28-06-11 -Do-

Cost of Time of Penstock Completion Work (Lakhs) 31st `220.0 July.2013

`150.0

-Do-

3 4 5

-Do-Do-

`140.0

31st Sep. 2013 -Do-

`129.0

-Do-

`199.0

-Do-

Turtuk-I MHP 2x250KW

14 Dt:28-06-11

-Do-

`120.0

-Do-

N I T for Execution of E&M Work


Sr.No. Name of Mini-Hydel Projects with capacity 1 Tsati MHP 2x250 Chamshen MHP 2X225KW Henachi MHP 2x300 KW Bogdang MHP 2x400KW NIT No. & Date of NIT NIT-36 16-09-2011 NIT-35 16-09-2011 NIT-34 16-09-2011 NIT-37 16-09-2011 Tender Received On (Under Evaluation) Time of Completion

Ending Dec.11
-Do-

31st Oct.2012

-Do-Do31st Sep. 2013

-Do-

4
5

-Do-Do-

Chulungkha MHP 2x400KW


Turtuk-I MHP 2x250KW

NIT-38 16-09-2011
NIT-39 16-09-2011

-Do-

-Do-

-Do-

Execution of MHP on Turnkey Tender


Sr.No. Name of MiniHydel Projects with capacity Waris III MHP 2x6000 Shayok MHP 2X300 KW Durbu II MHP 2x175 KW SumdaDho MHP 2x150KW NIT No. & Date of NIT NIT-41 31-12-2011 NIT-42 31-12-2011 NIT-43 31-12-2011 NIT-44 31-12-2011 Last date for Receiving Screening of Tender Documents 12th March.12 -DoEstimated Time of Cost of Completion Work (Lacs) 30th Sept.13 1400.00 -Do1170.00

3 4

-Do-

605.00

-Do-

-Do-

594.00

-Do-

Pre-Bid meeting will be held on 29th February 2012 at 11:00 Hrs at Dy. Commissioner/CEOs Office, LAHDC Leh-Ladakh

COST ABSTACT OF MHP


Sr. No
1 2 3 4 5 6 7 8 9 10 11 12

Name of the MHP

Civil Work (in Rs. Lacs)

Penstock work (Rs. In lacs)

E & M work (Rs. In lacs)

Works under other heads (Rs.in lacs) 113.27 114.53 114.85 400.57 84.25 101.13 435.63 71.50 108.47 100.00 118.20 100.14

Total (Rs. In lacs)

Tsati(2x250 KW) Henache(2x300KW) Khardong(2x250KW) Sasoma (2x1.5MW) Staksha(2x300KW) Chamshen(2x225KW) Rongdo(2x1.5MW) SumdaDho(2x150KW) Bogdang(2x400KW) Turtuk-II(2x300KW) Chalungka(2x400KW) Turtuk-I(2x250KW)

195.17 227.26 214.83 693.47 264.28 222.97 796.39 195.81 259.94 270.0 268.97 277.33

286.45 188.11 280.93 735.33 221.64 200.24 767.98 210.0 130.56 82.95 205.20 126.57

220.01 242.94 220.00 1000.47 242.94 198.00 1600.00 188.0 529.6 446.50 529.56 446.50

814.90 772.84 830.61 2829.84 813.11 722.34 3600.00 665.31 1028.57 900.0 1121.928 950.50

Sr. No

TENTATIVE COST ABSTACT OFWorks under MHP Name of the MHP Civil Work Penstock work E & M work
(in Rs. Lacs) (Rs. In lacs) (Rs. In lacs) other heads (Rs.in lacs)
Skuru (2x150 KW) Waris-I (2x150 KW) Waris-II (2x600 KW)

Total (Rs. In lacs) Approximate


525.00 555.00 1500.00

13 14 15 16 17 18

140.00
Waris-III (2X600 KW) Durbuk-I (2x250 KW) Tangtse (2x300 KW) 1540.00 925.00 1110.00

19
20 21 22

Durbuk-II (2x250 KW)

682.70

117.00
Shayok (2x300 KW) Phobrang (1x150 KW) 1287.00 277.50

Tirith (2x150 KW)

555.00

Total Capacity = 17.45 MW

Total Cost of the Projects Rs.Lacs/KW Say 75% of the Project =23705.448Lacs (Avg.) = 1.36 Cost= 17778.7 Lacs Capacity=13.08 MW

ADVERTISED COST OF MHP (14100 Lakhs)


Sr. No
1 2 3 4 5 6 7 8

Name of the MHP

Civil Work (in Rs. Lacs)

Penstock work (Rs. In lacs)

E & M work (Rs. In lacs)

Works under other heads (Rs.in lacs) 113.27 114.53 100.14 101.13 435.63 71.50 108.47 118.20

Total (Rs. In lacs)

Tsati(2x250 KW) Henache(2x300KW) Turtuk-I(2x250KW) Chamshen(2x225KW) Rongdo(2x1.5MW) SumdaDho(2x150KW) Bogdang(2x400KW) Chalungka(2x400KW) Durbuk-II (2x250 KW)

195.17 227.26 277.33 222.97 796.39 195.81 259.94 268.97

286.45 188.11 126.57 200.24 767.98 210.0 130.56 205.20

220.01 242.94 446.50 198.00 1600.00 188.0 529.6 529.56

814.90 772.84 950.50 722.34 3600.00 665.31 1028.57 1121.928 682.70

140.00 10 11 Waris-III (2X600 KW) 117.00 Shayok (2x300 KW) 1287.00 1540.00

Total Project Costs

13200 Lakhs

Target Schedule for MHP for 2012


o NIT for 3 Nos MHP projects (Rongdo, Waris-I & Ramdan Nalla) by 15th April 2012 o Allotment of Turnkey Tender for 4 MHP Projects by Ending April, 2012 o Allotment of Electro-Mechanical Works for 6 Nos Projects by ending March 2012. o Allotment of Penstock Works for 6 Nos Projects by ending March 2012.

FINANCIAL DETAILS For MHP Schemes


Present Financial Status 1. Total Funds received up to date 2. Total Expenditure up to date = = Rs. 157.00 Lacs Rs. 157.00 Lacs Nil

Net Balance = 3. Additional requirements of funds till March 2012 I. Survey/Investigation & DPRs = II. Payment on account of Execution of Works & Mobilization Advance = Total =

Rs.84.70 Lcas

Rs. 1153.84 Lacs

Rs. 1238.54 Lacs

4. Net Funds required (Financial Yr.) =

Rs. 1238.54Lacs