FVS

F.V.S Float Vehicle Services J.S Company 1428/24, 30/4 Road, 12 Ward, Vung Tau Province, Vietnam Tel : + 84.64. 3627611 Fax: + 84.64. 3627612

SEATRENCH CO., LTD Skogveien 19, 1672 Krakeroy, Norway Tel : +47 952 43 407

Equipments
Launching and recovery system Electric motor: Mitsubishi JIS C 4004 Working load 1.5 ton Max load 3.0 ton Divercage with capacity for two divers A-frame hydraulically controlled
4

Equipments
Recompression Chamber Manufacture: Jamakuni Japan Capacity: 2600 liters Working pressure: 6 bars Production date: 2004 Production code: 080 2KS SX10 TYPE Testing date: 2008

Equipments

Underwater camera & CCTV system


SONY HDR- XR500E HANDYCAM AND HOUSING
OLYMPUS TOUGH 8100 AND HOUSING
6

Other Equipments
Item Communication control Discription The AMCOM II 2820 Systems

Full face mark

KMB-BandMask 18 (Q.ty 03) Kirby Morgan EXO-26 Balanced Regulator Full Face Mask (Q.ty 04)

High pressure compressor Kirby Morgan Air Control System 5 (KMACS 5) is a (The MC1A air compressor) lightweight, portable control box for use in surface supplied air diving operations. Air control system Kirby Morgan Air Control System 5 (KMACS 5) is a lightweight, portable control box for use in surface supplied air diving operations. Design pressure: 30psi Working pressure: 14psi Design pressure: 207bar Working pressure: 203bar

Diving umbilical

Scuba

Services
Underwater Marine Construction

Services
Underwater Welding & Construction

Services
( ABS / DNV) Vessel Inspection, Repair & Maintenance

10

Services
Burying the optical cable

11

Services
Submarine Cable & Pipeline Installation & Repair Works

12

Diving Work Records


Burying the optical cable at Vung Tau sea area Burial and survey about 5000 meters optical cable at Vung Tau Long Hai sea area. Water depth: 30 85 fsw.

13

Diving Work Records


Survey the seabed around the Hamrong-1X & Yentu-2X Boreholes Max water depth is about 30 meters. FVS diving team dive to take survey camera around the borehole with 50 meters radius.

14

Diving Work Records


Survey the seabed around the Doson-1x & Hamrong-2x boreholes FVS diving team dive to take survey camera around the borehole with 50 meters radius. Max water depth is about 30 meters

15

Diving Work Records


Additional support for boatlanding at PLDP-A Total weight of all parts which will be attached to Boatlanding of the rig is about 15,250kgs, which is combined of many parts. The biggest part is about 4,966kgs

16

Diving Work Records


Removing finishing net and net-chain at Ruby field Remove the fishing net and net-chain stuck/cover to the PLEMs (No.4 & No.7) at Ruby Field. Survey and film the PLEMs (No.1 to No.7) before/after removed the fishing net and net-chain.

17

Diving Work Records


Underwater surveys for

MV Lady Valisia
MV Posh Venture MV Posh Verdant MV VTC Globe MV Bremen MV SANTIAGO MV Lewek Penguin

20/06/2010
06/12/2010 22/01/2010 21/01/2011 20/05/2011 11/05/2011 04/05/2011

MV Lewek Stork
MV ALAMO H188

01/11/2011
13/12/2011

18

Our Clients

19

20

History of Seatrench

Marine Trench AS & Subsea Trenching Services AS merge dops 2009 All contracts & operation will be performed in Seatrench AS 20 years of experience from trenching worldwide Main office in Norway, sales offices in UK, Thailand and Brazil
21

Service of Seatrench
Oil & Gas, Infrastructure, Offshore & Inshore projects

Seatrench operate a fleet of 4 trenching rigs and pump

barges The Seatrench concept consist of: Trenching Machine, Pump Barge, Operational crew, Diving crew Dedicated crew with more than 20 years experience around the world. More than 5000 diving hours on the equipment Fast mobilisation at site. Important in areas with strong current and harsh weather conditions.
22

Equipments

Trenchers 2 off Double Pump Trenchers. Soil conditions max 350 - 400 KPA
23

Equipments

24

Advantages
The advantages with the Seatrench concept for shallow water trenching can be summarized as follows: High efficient equipment with documented performance. Ensuring fast mobilisation to reasonable cost worldwide Independent rigs with less requirements for support vessels Minimized number of personnel Powerful and light weight design. A staff of experienced and well qualified operators. Self designed and produced equipment Environmentally friendly process Our equipment is designed to minimize the impact on the subsea environment. Due to oil free operation, the system has zero pollution to the sea.
25

Work Records
Projects performed in 2010 Comorro Island 1000 mtr FO cable for Alcatel Lucent Cork Bay Irland 14000 mtr Power cable for Nexans Wave hub England 2000 mtr Power cable for CTC Marine Abu Dhabi 60 km FO cable for E Marine Abu Dhabi 6000 mtr FO cable for E Marine Lebanon Beirut 16 Steel Pipeline for Total (400mm including concreteinsulation) Projects to be performed in 2011 34 km FO cable in Brazil for GrupoSchahin & Petrobras (On going)
26

Process of Cable Burying

27

28

29

30

31

32

33

34

35

36